Computer Applications in Construction Management

This document outlines the syllabus for a course on computer applications in construction engineering and planning. The course is divided into 5 units that cover topics like optimization techniques, inventory models, scheduling applications using PERT and CPM, and other problems like sequencing and simulation. It lists 3 textbooks and 2 references for the course. The course is worth 3 credits and involves 45 total periods of instruction.

Uploaded by

Rajha Rajeswaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
393 views12 pages

Computer Applications in Construction Management

This document outlines the syllabus for a course on computer applications in construction engineering and planning. The course is divided into 5 units that cover topics like optimization techniques, inventory models, scheduling applications using PERT and CPM, and other problems like sequencing and simulation. It lists 3 textbooks and 2 references for the course. The course is worth 3 credits and involves 45 total periods of instruction.

Uploaded by

Rajha Rajeswaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 12

BE Degree Honours with

Specialization

BE Civil Engineering

Specialization in
CONSTRUCTION MANAGEMENT
Electives in Construction Management
21 CEB 07 T Computer Applications in
Construction Engineering and Planning
SYLLABUS Total Periods: 45 Credits 3
UNIT I INTRODUCTION 9
Overview of IT Applications in Construction – Construction process –
Computerization in Construction – Computer aided Cost Estimation –
Developing application with database software.
UNIT II OPTIMIZATION TECHNIQUES 9
Linear, Dynamic and Integer Programming - Branch and Bound Techniques –
Application to Production Scheduling, Equipment Replacement, Material
Transportation and Work Assignment Problems – Software applications
UNIT III INVENTORY MODELS 9
Deterministic and Probabilistic Inventory Models - Software applications.
UNIT IV SCHEDULING APPLICATION 9
PERT and CPM - Advanced planning and scheduling concepts – Computer
applications – Case study.
UNIT V OTHER PROBLEMS 9
Sequencing problems – Simulation – Enterprises – Introduction to ERP
systems.
TEXT BOOKS
1 Billy E. Gillet., Introduction to Operations Research – A
Computer Oriented Algorithmic Approach, McGraw Hill,
2008.
2 Feigenbaum, L., Construction Scheduling with Primavera
Project Planner Prentice Hall Inc., 2002.
3 Ming Sun and Rob Howard, “Understanding I.T. in
Construction, Spon Press, Taylor and Francis Group, 2004.

REFERENCES
4 Paulson, B.R., Computer Applications in Construction,
McGraw Hill, 1995.
5 Tarek Hegazy, Computer-Based Construction Project
Management, Pearson New International Edition, 2013.