0% found this document useful (0 votes)
27 views45 pages

Chapter 6

Uploaded by

wahyucandra551
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views45 pages

Chapter 6

Uploaded by

wahyucandra551
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 45

Chapter 6

Integer, Goal, and Nonlinear


Programming Models

© 2007 Pearson Education


Variations of Basic
Linear Programming
• Integer Programming

• Goal Programming

• Nonlinear Programming
Integer Programming (IP)
Where some or all decision variables are
required to be whole numbers.

• General Integer Variables (0,1,2,3,etc.)


Values that count how many

• Binary Integer Variables (0 or 1)


Usually represent a Yes/No decision
General Integer Example:
Harrison Electric Co.
Produce 2 products (lamps and ceiling fans)
using 2 limited resources

Decision: How many of each product to


make? (must be integers)

Objective: Maximize profit


Decision Variables
L = number of lamps to make
F = number of ceiling fans to make

Lamps Fans
(per lamp) (per fan)
Profit Hours
$600 $700
Contribution Available
Wiring Hours 2 hrs 3 hrs 12
Assembly Hours 6 hrs 5 hr 30
LP Model Summary
Max 600 L + 700 F ($ of profit)
Subject to the constraints:
2L + 3F < 12 (wiring hours)
6L + 5F < 30 (assembly hours)
L, F > 0
Graphical Solution
Properties of Integer Solutions
• Rounding off the LP solution might not
yield the optimal IP solution

• The IP objective function value is usually


worse than the LP value

• IP solutions are usually not at corner


points
Using Solver for IP
• IP models are formulated in Excel in the
same way as LP models

• The additional integer restriction is entered


like an additional constraint
int - Means general integer variables
bin - Means binary variables
Go to file 6-1.xls
Binary Integer Example:
Portfolio Selection
Choosing stocks to include in portfolio

Decision: Which of 7 stocks to include?

Objective: Maximize expected annual


return (in $1000’s)
Stock Data
Decision Variables
Use the first letter of each stock’s name

Example for Trans-Texas Oil:

T = 1 if Trans-Texas Oil is included


T = 0 if not included
Restrictions
• Invest up to $3 million
• Include at least 2 Texas companies
• Include no more than 1 foreign company
• Include exactly 1 California company
• If British Petro is included, then
Trans-Texas Oil must also be included
Objective Function (in $1000’s return)
Max 50T + 80B + 90D + 120H + 110L +
40S + 75C
Subject to the constraints:

Invest up to $3 Million
480T + 540B + 680D + 1000H
+ 700L + 510S + 900C < 3000
Include At Least 2 Texas Companies
T+H+L > 2

Include No More Than 1 Foreign Company


B+D < 1

Include Exactly 1 California Company


S+C = 1
If British Petro is included (B=1), then
Trans-Texas Oil must also be included (T=1)
T=0 T=1
Combinations B=0 ok ok
of B and T
B=1 not ok ok

B<T
allows the 3 acceptable combinations and
prevents the unacceptable one
Go to file 6-3.xls
Mixed Integer Models:
Fixed Charge Problem
• Involves both fixed and variable costs

• Use a binary variable to determine if a


fixed cost is incurred or not

• Either linear or general integer variables


deal with variable cost
Fixed Charge Example:
Hardgrave Machine Co.
Has 3 plants and 4 warehouses and is
considering 2 locations for a 4th plant
Decisions:
• Which location to choose for 4th plant?
• How much to ship from each plant to each
warehouse?
Objective: Minimize total production and
shipping cost
Supply and Demand Data
Production
Monthly Monthly Cost
Warehouse Demand Plant Supply (per unit)
Detroit 10,000 Cincinnati 15,000 $48
Kansas
Houston 12,000 6,000 $50
City
New York 15,000 Pittsburgh 14,000 $52
Los Angeles 9,000
Total 46,000 35,000

Note: New plant must supply 11,000 units per month


Possible Locations for New Plant

Production Cost Fixed Cost


(per unit) (per month)
Seattle $53 $400,000
Birmingham $49 $325,000
Shipping Cost Data
Decision Variables
Binary Variables
Ys = 1 if Seattle is chosen
= 0 if not
YB = 1 if Birmingham is chosen
= 0 if not

Regular Variables
Xij = number of units shipped from plant i
to warehouse j
Objective Function (in $ of cost)
Min 73XCD + 103XCH + 88XCN + 108XCL +
85XKD + 80XKH + 100XKN + 90XKL + 88XPD +
97XPH + 78XPN + 118XPL + 113XSD +
91XSH + 118XSN + 80XSL + 84XBD +
79XBH + 90XBN + 99XBL +
400,000YS + 325,000YB

Subject to the constraints:

(see next slide)


Supply Constraints
-(XCD + XCH + XCN + XCL) = -15,000 (Cincinnati)

-(XKD + XKH + XKN + XKL) = - 6,000 (Kansas City)

-(XPD + XPH + XPN + XPL) = -15,000 (Pittsburgh)

Possible Locations for New Plant


-(XSD + XSH + XSN + XSL) = -11,000YS (Seattle)

-(XBD + XBH + XBN + XBL) = -11,000YB (B’ham)


Demand Constraints

XCD + XKD + XPD +XSD + XBD = 10,000 (Detroit)


XCH + XKH + XPH +XSH + XBH = 12,000 (Houston)
XCN + XKN + XPN +XSN + XBN = 15,000 (New York)
XCL + XKL + XPL +XSL + XBL = 9,000 (L. A.)

Choose 1 New Plant Location


YS + YB =1

Go to File 6-5.xls
Goal Programming Models
• Permit multiple objectives

• Try to “satisfy” goals rather than optimize

• Objective is to minimize
underachievement of goals
Goal Programming Example:
Wilson Doors Co.
Makes 3 types of doors from 3 limited
resources

Decision: How many of each of 3 types of


doors to make?

Objective: Minimize total


underachievement of goals
Data
Goals
1. Total sales at least $180,000
2. Exterior door sales at least $70,000
3. Interior door sales at lest $60,000
4. Commercial door sales at least $35,000
Regular Decision Variables
E = number of exterior doors made
I = number of interior doors made
C = number of commercial doors made

Deviation Variables
di+ = amount by which goal i is overachieved
di- = amount by which goal i is underachieved
Goal Constraints
Goal 1: Total sales at least $180,000
70E + 110I + 110C + dT- - dT+ = 180,000

Goal 2: Exterior door sales at least $70,000


70E + dE- - dE+ = 70,000

Note: Each highlighted deviation variable


measures goal underachievement
Goal 3: Interior door sales at least $60,000
110 I + dI- - dI+ = 60,000

Goal 4: Commercial door sales at least

$35,000
110C + dC- - dC+ = 35,000
Objective Function
Minimize total goal underachievement

Min dT- + dE- + dI- + dC-

Subject to the constraints:


• The 4 goal constraints
• The “regular” constraints (3 limited
resources)
• nonnegativity
Weighted Goals
• When goals have different priorities,
weights can be used

• Suppose that Goal 1 is 5 times more


important than each of the others

Objective Function
Min 5dT- + dE- + dI- + dC-
Properties of Weighted Goals
• Solution may differ depending on the
weights used

• Appropriate only if goals are measured in


the same units
Ranked Goals
• Lower ranked goals are considered only if
all higher ranked goals are achieved

• Suppose they added a 5th goal


Goal 5: Steel usage as close to 9000 lb
as possible
4E + 3I + 7C + dS- = 9000 (lbs steel)

(no dS+ is needed because we cannot


exceed 9000 pounds)
• Rank R1: Goal 1
• Rank R2: Goal 5
• Rank R3: Goals 2, 3, and 4

A series of LP models must be solved


1) Solve for the R1 goal while ignoring the
other goals
Objective Function: Min dT-

Go to file 6-7.xls
2) If the R1 goal can be achieved (dT- = 0),
then this is added as a constraint and we
attempt to satisfy the R2 goal (Goal 5)

Objective Function: Min dS-

3) If the R2 goal can be achieved (dS- = 0),


then this is added as a constraint and we
solve for the R3 goals (Goals 2, 3, and 4)

Objective Function: Min dE- + dI- + dC-


Nonlinear Programming Models
• Linear models (LP, IP, and GP) have
linear objective function and constraints

• If a model has one or more nonlinear


equations (objective or constraint) then the
model is nonlinear

• Example nonlinear terms: X2, 1/X, XY


Characteristics of Nonlinear
Programming (NLP) Models
• Difficult to solve
• Optimal solutions are not necessarily at
corner points
• There are both local and global optimal
solutions
• Solution may depend on starting point
• Starting point is usually arbitrary
Nonlinear Programming Example:
Pickens Memorial Hospital
Patient demand exceeds hospital’s capacity

Decision: How many of each of 3 types of


patients to admit per
week?

Objective: Maximize profit


Decision Variables
M = number of Medical patients to admit
S = number of Surgical patients to admit
P = number of Pediatric patients to admit

Profit Function
Profit per patient increases as the number of
patients increases (i.e. nonlinear profit
function)
Constraints
• Hospital capacity: 200 total patients

• X-ray capacity: 560 x-rays per week

• Marketing budget: $1000 per week

• Lab capacity: 140 hours per week


Objective Function (in $ of profit)
Max 45M + 2M2 + 70S + 3S2 + 2MS +
60P + 3P2
Subject to the constraints:

M+S+P < 200 (patient


cap.)
M + 3S + P < 560 (x-ray cap.)
3M + 5S + 3.5P < 1000 (marketing $)
(0.2+0.001M)x(3M+3S+3P) < 140 (lab hrs)
M, S, P > 0
Using Solver for NLP Models
• Solver uses the Generalized Reduced
Gradient (GRG) method
• GRG uses the path of steepest ascent (or
descent)
• Moves from one feasible solution to
another until the objective function value
stops improving (converges)

Go to file 6-8.xls