Traffic Control Simulation Using PLC and SCADA
Traffic Control Simulation Using PLC and SCADA
1. Develop a simulation model of traffic light control using PLC and SCADA.
2. Evaluate the effectiveness of the PLC and SCADA system in regulating traffic flow.
3. Optimize traffic patterns through intelligent control algorithms implemented in the
simulation.
4. Assess the reliability and scalability of the PLC and SCADA-based traffic control
system.
5. Investigate the potential for real-time monitoring and remote management of traffic
lights using SCADA.
6. Validate the simulation results against real-world traffic scenarios for accuracy and
reliability.
APPLICATIONS