Hybrid System Introduction
Hybrid System Introduction
Water cooled system shows stable ability connected with cooling tower, boiler or
district heating, also can be connected with the geothermal system. This is high
tech system has both of the merits of the central and individual air conditioner
Cooling Connecting
tower ducts
Direct expansion
District AHU
Heating
(Boiler)
Indoor units
Underground H/Ex
Geothermal
system
1
2 Merits
This system complements the demerits of the central and the individual
air conditioner along with maximize strong points .
Stability Convenience
Division Case 1 : Ice storage system Case 2 : Absorption system Case 3 : Water cooled
Cooling Chiller + Storage + Cooling tower + AHU absorption unit + Cooling tower + AHU Water cooled ODU + C/T + DX AHU
Heating Boiler + AHU + FCU absorption unit + (boiler) + AHU + FCU Water cooled ODU + Boiler + DX AHU
75 130
120
M KRW)
65 운전비
Operation cost M KRW)
(100(억원)
55 110
유지관리비
(억원)
Maintenance
45 100
지원금
Supporting mone
(100
Cost금액
35 90
공사비
금액
y
Cost
25 80
장비비
Installation cost
15 70
5 Equipment cost
Office space 60
-5 Area 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Yea
년수 (년) r
Case 1 Case 2 Case 3
1안(빙축열) 2안(흡수식) 3안(수냉식) : 31,000 M 2 Case 1 Case 2 Case 3
1안(빙축열) 2안(흡수식) 3안(수냉식)
3
4 System design
8F Multi Type (Office B/D , remodeling ) & Package type (High rising residence)
DX type AHU (Space requiring heating, cooling and ventilation, Lobby , Auditorium. etc
Water cooled system is suitable for High rising building difficult to apply air
cooled system, remodeling building installed central air conditioning system, severe
cold area. etc.
Economical installation,
maintenance cost Premium/ high rise apartments
simultaneous Cooling
heating load facility Partial / special load
Places requiring
Government & public office Individual A/C.
5
5 High rise apartments application (case 1)
Location OO city
Completion ’09
Application Point
Stable capacity system with no airflow effect
6
5 High rise apartments application (case 1)
Return to ceiling
Zone
control
damper
Cooling
Room 1 Room 2 Room 3 Water
Control V/V
damper
Zone
control
damper
Cooling
Room 1 Room 2 Room 3 Water
Control V/V
Connected to
another unit .
7
5 High rise apartments application (case 2)
Location OO city
Completion ’09
Application Point
Stable capacity system with no airflow effect
8
5 High rise apartments application (case 2)
Multi V Water C/O is installed for each room and Home net control is possible.
Cooling tower
Pump
Home Network
(Home server )
9
5 Office building application (case 1)
Location Seoul
Completion ’2007.10
Application Point
10
5 Office building application (case 1)
Multi V Water ODU is installed at each floor in machine room, cooling tower on the
roof and ground, boiler and pump are installed at the underground
machinery room. The machine room space is much more smaller compared with
central air conditioner .
Cooling tower
Roof
top floor
Cooling mode
Typical floor
Heating mode
Machine
Room
11
5 Office building application (case 1)
AHU Multi V
water
Multi V
water
Lobby
Convector (Heating , preventing the cold draft at outer side )
AHU Multi V
water
12
5 Office building application (case 2)
Location Seoul
Completion ’2008.12
Application Point
13
5 Office building application (case 2)
Multi V
water
Multi V
water
DX
Multi V
AHU water
14
5 Office building application (case 2)
Wate Wate
r r
pump pump
Multi V Multi V
water water
Shady space requires heating and in contrast the Inner side requires cooling and in contrast
sunny place needs cooling , cooling tower , boiler outer side requires heating cooling tower , boiler
operation is not needed due to the heat flow operation is not needed due to the heat flow
inside the water pipe. inside the water pipe.
15
5 Remodeling case
Location Seoul
Completion ’2007. 09
Scale B1F ~ 8F
Application Point
Necessity of individual control is strong
Use of the existing machinery room, minimize
the constructional work and comparatively
simple installation.
No effect at the building structure and
outside interior.
Stable heating operation without any defrosting
or capacity drop during the winter .
16
5 Remodeling case
¼÷
¼Ò#1~#3 ¼÷
¼Ò#14~#17 º ¹µ µ ÀÚ
Ä ¡È À̧ Ç
½Ç º ¹µ µ ¼÷
¼Ò#4~#13
The dead space of the building is used for machine arrangement and arranged water
pipes at most and at the indoor side simple refrigerant pipes and cassette type
indoor¼units
¼Ò
÷ #1~#3 are
¼÷
¼Ò installedº ¹µ.µ
#14~#17 ÀÚ
Ä ¡È À̧ Ç
½Ç º ¹µ µ ¼÷
¼Ò#4~#13
¼÷
¼Ò#1~#3 ¼÷
¼Ò#14~#17 º ¹µ µ ÀÚ
Ä ¡È À̧ Ç
½Ç º ¹µ µ ¼÷
¼Ò#4~#13
° Ô
À ÌÆ®
¹ ë
º ê
¼Ö
· ¹³ ë
À ̵ å¹ ë
º ê
½ ºÆ®
· ¹À ̳ Ê
¼÷
¼Ò#1~#3 ¼÷
¼Ò#14~#17 º ¹µ µ ÀÚ
Ä ¡È À̧ Ç
½Ç º ¹µ µ ¼÷
¼Ò#4~#13
° Ô
À ÌÆ®
¹ ë
º ê
Cooling tower
20 D.Vx2EA
° Ô
À ÌÆ®
¹ ë
º ê
20 D.Vx3EA
Closed type cooling tower
installation on the ground
Boiler Pump Exp. tank ÇÃ
· º½ Ã
º íÁ Ò
À ÎÆ®
Boiler , water pump and expansion tan
k installed in the machinery room.
17
5 Remodeling case _ installation check
Cooling tower recycling check
Check points : Capacity , Type (closed/open type ), service life , water tank
condition, motor state etc.
If using the open type C/T, intermediate H/E to be installed and checked.
the H/E at the supply pipe & return pipe. Supply pipe is
connected to the ODU drain pipe to drain out the condensate
P/T plug
water .
Flexible tube is connected at the point of the supply pipe
connection to the ODU so as to prevent any leakage due Strainer
to the pipe impact force or vibration .
As per the heat source flow control type (Variable flow/
constant flow) , the On/Off valve can be added at the return Drain valve
pipe side .
Heat source pipe could be insulated for energy saving . Flexible Flange Common drain pipe
tube
Supply and return pipe must have the water temp meter and
Heat source Outdoor unit
water flow pressure meter to check the temperature and flow Drain pipe drain pipe
of the heat source water
19
AHU System introduction
1 Overview
AHU have functions like cooling, heating, humidification, Air cleaning &
ventilation ; providing multi solution to the consumer
AHU system keeps required indoor air temperature, humidity, air current and cleanliness so that is suitable for the purpose of the place.
Product Composition
Supply air Part Damper Part Air Filter Part H/E Part Humidifier Part
Blower / Motor / Pully Inner Damper Pre Filter Heat Exchanger Humidifier
Frame / Spring Outer Damper #1~4 Medium Filter Coil Steam Injection
Air volume control (High static Fan) Air cleanliness (Air Filter) Control air temp. (Heat exchanger) Control air humidity (humidifier)
21
2 USP
22
2 USP
Total integrated control system of various indoor units is possible
Individual operation
Random operation
23
2 USP
High efficiency through outdoor air cooling and inverter technology of
Multi V Super
Energy saving through outdoor air cooling. High elevation / Long piping System
Temp.
온도
Upper limit
상한
BPT.
BPT
시간
Height
시간
Lower limit
하한 Piping length
100m 220m
Heating Cooling Heating
Interim Interim
(Outdoor
(Outdoor air
air (Outdoor
(Outdoor air
air
cooling)
cooling) cooling)
cooling)
Inv.
Inv. Fan
Fan
Inv.
Inv. comp
comp Const.
Const. comp
comp
High efficiency inverter system Target temp. can be reached fastly Can be long piping system &
through linear inv. Hertz control Pleasant & economic control cycle stability & raise efficiency
24
3 System Comparison
Low initial & operation cost compared with constant AHU, and It can
operate cooling & heating by only one outdoor unit.
Constant model
Item LG Heat Pump AHU
Boiler Heating Electric Coil Heating
Multi
Multi VV Outdoor
Outdoor unit
unit
Water
Water tank
tank
Cooling
Cooling tower
tower Exp.
Exp. Tank
Tank
AHU
AHU
AHU
AHU
Boiler
Boiler Water
Water tank
tank Chiller
Chiller Pump
Pump
Heating/cooling/humidification/ Heating/cooling/humidification/
Merit ventilation/High static pressure/big air Merit ventilation/High static pressure/big air
volume volume
Need machine room, Complex system, Strong No need machine room, simple system &
Demerit
difficult SVC, Work scope problem point work scope & SVC, High efficiency
26
4 Application
Big space or High ceiling height spaces and necessity of fresh air supply, humidifi
cation, air pressurization, etc
27
4 Application _ Large space
design point
6 m/s above
SA SA SA
Floor heating
Need air current (height 8m↑) Select AHU for the air circulation
arrival to the floor. from the high ceiling height.
Can handle the heat load & Select DX type for the
ventilation of big space. intermittent operation.
Heating & cooling load by each Apply floor heating for the time
when few people attend at dawn.
time and zone.
(boiler also can be used for hot-water
- Few people attend at dawn.
- Many people attend at some time. supply) OO Church
The middle story should handle the Separate air condition zone in to AHU 7,000CMH 1EA
load of upper & lower space. the lower & upper space. (Multi V 24Hp connected )
28
4 Application _ Space requiring Outdoor air supply
For fresh air supply
Fresh air supply for residence Proposal case
Cooling
Cooling tower
tower
Fresh
Fresh
air
air
OO high rising
residence
Living room Room 1 Room 2 Kitchen
AHU for fresh
air supply
Package
Package type
type
OO laboratory
AHU for fresh
Multi
Multi VV
Water
Water air supply
AHU
AHU
Floor sta
nding
30
4 Application _ Space requiring ventilation & humidification
Ventilation/Humidity necessity spot
Medium/small Hospital
Ware
Surgery house Meeting Room Toilet
Consultation Physiotherapy
Lobby / Hall
Room room
OO Church remodeling.
15,000 CMH 1EA
(Multi V 40HP connected)
Lack of cooling / heating capacity while remodeling Possible to use the existing equipment that can use
A need of individual cooling / heating - Check the existing Duct
A need of additional equipment while remodeling. - Check the existing equipment space
(AHU, Outdoor Unit)
Check the installation space AHU & Outdoor Unit
32
4 Application _ Small & middle building
Small & Middle Building
Heavy building
Application case
OO Store.
AHU 27, 000CMH 1EA
(Multi V 100HP connected)