Week 3 - Tender Document & Tender Notice
Week 3 - Tender Document & Tender Notice
Week 3 - Tender Document & Tender Notice
DOCUMENT
WELCOME TO MY VIDEO
DR AN NISHA NUR WELLIANA
ABD RASED
TENDER
The administration of a construction contract is complex.
Time constraints
Two category of owner: private & public sectors
Therefore, effective and efficient administration of
the contract is not only necessary but also vital in
order to achieve success.
THE RULES:
02 International Funded
Malaysian government’s policies on open 05 Large/specialize Project
tender and Malaysian contractors are not Works which estimated cost more than RM50
applicable:World Bank, ADB, IMF, IAD,etc. million each, Joint-venture (JV) or MOU
arrangement are allowed. selected foreign
03 Participate contractors are invited to JV with Malaysian
Opened to Malaysian contractor firms only contractors through Pre-qualification
CONSULTANTS ROLES
IN TENDER DOCUMENT PREPARATION
DRAWINGS
ARCHITECT &
ENGINEER COMPILATION
CONSULTANT
CONCERNED
SPECIFICATION
CONSULTANT
CONCERNED
TENDER
PARTICULAR
CONDITION
OF CONTRACT QUANTITY
SURVEYOR
ESTIMATE
GENERAL
CONSULTANT
CONCERNED
CONDITION
OF CONTRACT
TENDER CONTENT
Tender content must reflect or illustrating the contract system has been selected in the project proposal
Isi kandungan tender mestilah mengambarkan sistem kontrak yang telah dipilih dalam cadangan projek
tersebut
Bills of Drawing
quantities &
specification
TENDER DOCUMENT PREPARATION
The tender documents which in generally contain the following matters:
Scope of Works
2
Tender Form Performed / Track
Technical
3 Record
drawing / Plans
11
8
Tender
Regulations
4
Profile & Financial Status
Contract
Condition of Period 12
Contract 9
5
TENDER DOCUMENT PREPARATION (cont’d)
The scope of the project and Pre-tender visit (if necessary), site
visits are compulsory before the
4 the outline of the tasks or scope
of work the customer wants the
6 purchase a tender document
contractor to perform or deliver
Tender Description Request for site visit
9
8
Registered
Document Tender Document
Document
Tender Ref.No.&Title Selling Briefing Selling
Fee
Date (Compulsory) Date
the valid period of tender Period of time allowed for The period can be Client / QS consultant In contractor side, they
after the closing date of QS to analyze and select extended if the selection must submit a letter to can refuse the extension if
submission the eligible tenderer / process of contractor can apply for extension. The they do not agreed with
contractor not be made or the tender validity period can new period time or
occurrence of any be extended after the intends not to proceed
problem. consent from the with the tender
tenderers
DURING TENDER VALIDITY PERIOD
2 PROCESS NEED TO DO:
STAGE 1: STAGE 2:
Process Of Selecting A Eligible ContractorPreparation of tender report
begins.... After tender analysis process The letter of offer / Letter of
Tender Report are prepared Acceptance (LA) will sent to
Qualifications
with comprehensive, complete, the succeed contractor
Tender prices fair and transparent.
Completion period Succeed contractor MUST
Experience QS: propose and recommend reply the LA within and
Contractor's established skills appropriate choice of one or compulsory agree to accept 2
two tenderer as qualified and weeks the project.
Financial status
succeed
Integrity & reputation
Proven competence suitable for The Tender Committee will
the nature / character of offered review report from QS and
project will agree to the
recommendation proposed by
QS.
REFUSE OR REJECT THE TENDER AWARD /
MENOLAK ANUGERAH TENDER
PENALTY
Definision of PERFORMANCE
BOND
Definision of ADVANCE
PAYMENT