0% found this document useful (0 votes)
67 views1 page

Supply Chain Map-1

The document provides supply chain mapping details for Team 6. It includes information on various stages of the supply chain from purchase to outbound logistics. Key details include warehouse and production capacities, safety stock levels, lot sizes, delivery reliability, and other metrics for ingredients and products flowing through the supply chain from multiple sources to a retail customer.

Uploaded by

deepak devassia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views1 page

Supply Chain Map-1

The document provides supply chain mapping details for Team 6. It includes information on various stages of the supply chain from purchase to outbound logistics. Key details include warehouse and production capacities, safety stock levels, lot sizes, delivery reliability, and other metrics for ingredients and products flowing through the supply chain from multiple sources to a retail customer.

Uploaded by

deepak devassia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Supply-Chain-Mapping : Round 1 (Team 6)

Purchase Inbound Logistics Cleaning Time: 13,7 % Outbound Logistics


Avg lot size: 11.087 Lit Warehouse Cap. : 2000 tanks or pallets
Warehouse Cap. : 5000 tanks or pallets
Cube Utilization: 17,4% Mixing Cube Utilization: 56,9%
Spain Overflow: 0% Overflow: 0%
FTE: 15 1500 Pallets Operations FTE: 4
Con. index: 1.0439
Cube Utilization – 55.2%
Lot size: Tank Safety Stock: 3,0 weeks
Safety Stock: 2,0 weeks Production Plan Adherence – 88.3%
Del. Rel: 73,3% Stock: 3,4 weeks
Lot Size: 4 weeks
Mango SMED Obsoletes: 19,3% Food & Groceries:
Stock: 4,2 weeks
Obsoletes: 0% Service Level: 98,6% Attained Con. Index:
OR 1L
Comp. Avail. : 0.9674
China 99,7% Trade unit : Pallet
Safety Stock: 3,0 weeks
Con. Index: 0.962 Service level : 92%
Stock: 2,7 weeks
Lot size: Tank Safety Stock: 3 weeks Attained Shelf Life: 80%
Obsoletes: 14,7%
Del. Rel. : 90.00% Lot Size: 4 weeks
OR-C 1L Service Level: 87,4%
Vitamin C Stock: 91,2 weeks
Comp. Avail: 74.5%
Obsoletes: 204,99% Mixing Safety Stock: 3,0 weeks
Stock: 3,4 weeks
Miami
Obsoletes: 19%
Cont. Index: 0,9940 Safety Stock: 2 weeks
Service Level: 98,1%
Lot size: Tank Lot Size: 4 weeks OR-M 1L
Del. Rel. : 95.00 % Stock: 4,4 weeks Land Market:
Orange Comp. avail: 98.8% Attained Con. Index: 0,9883
Safety Stock: 3,0 weeks
Obsoletes: 0% Trade unit : Pallet
Stock: 3,8 weeks
Obsoletes: 14,3% Service level : 95%
Attained Shelf Life: 80%
Spain Safety Stock: 3 weeks OR PET Several Level: 99,1%
Cont. Index: 0,9508 Lot Size: 3 weeks Bottling
Lot size: FTL Stock: 4,1 weeks
Comp. Avail.: 99.6% Safety Stock: 3,0 weeks
Del. Rel. : 92.90%
Obsoletes: 0% Stock: 2,6 weeks
PET Obsoletes: 8,7%
OR-C PET Service Level: 87,4%
Safety Stock: 2,0 weeks
France Lot Size: 4,0 weeks Safety Stock: 3,0 weeks Dominick’s:
Con. Index: 0.9799 Stock: 4,2 weeks Run Time 67,5 hrs/wk 40,2% Stock: 3,6 weeks Attained Cont. Index: 1,0398
Lot size: FTL Comp. Avail. : 99.2% Obsoletes: 13,2% Trade unit : Box
Del. Rel. : 91.70% Obsoletes: 0% C/O Time 12,3 hrs/wk 7,3% Service level : 95%
OR-M PET Service Level: 98,2 %
Break Down Time 11,7 hrs/ wk 7% Attained Shelf Life: 80%
Pack 1L
Overflow Unused capacity 76,6 hrs/wk 45,6%
Overflow

You might also like