10 Indirect Measurement
10 Indirect Measurement
OUTLINE
Indirect Work Measurement Technique Standard Data/ Formula MTM MOST
Regression Analysis
Standard Data/Formula
General Approach
-MTM -MOST
Indirect Method
Strength
1. 2. 3. Finishing time can be defined before the work conductedevery motion element time is already known. Minimum Time only record one motion element. Lower cost.
Weakness 1. There is no motion table time of motion time data that detail and comprehensive 2. Used table not from Indonesia. 3. Need high accuracy from observer. 4. Motion Time Data adjusted with the working condition, ex: office working element VS factory working element.
Ex. : Making a hole with drilling process standard set up time & handling time.
Predicting Time (T) from Diameter (ID) and Thickness (Thickness) of work piece. Formula is derived based on linear regression method.
MTM
Is a system to set from the beginning of standard time (predetermined time standard) which formulated based on picture study of working motions of an industrial working operation taped in film. Time of every working element is determined based on certain condition that called classes. These classes include stopping circumstances, condition of carried objects, difficulties to handle objects or other conditions.
MTM
Method Time Measurement divides working motions into working elements : 1. Menjangkau (reach) 2. Mengangkut (move) 3. Memutar (turn) 4. Memegang (grasp) 5. Mengarahkan (position) 6. Melepas (release) 7. Melepas rakit (disassemble) 8. Menggerakan mata (eye movement), and some other body parts movement.
MTM
Time unit used in the table is the same as the multiplication of 0.00001 hour and this unit measurement is called as TMU (Time-Measurement Unit). Time for therbligs is measured in Time Measurement Unit (TMU) 1 TMU = 0.00001 hour = 0.0006 minute = 0.036 second 1 hour = 100,000 TMU 1 minute = 1,667 TMU 1 second = 27.8 TMU
MTM
MTM
TABEL MOVE
MTM
General Notation on every motion in Basic Movement Time Measurement is
a b c d Where as: a: b: c: d:
basic motion of work distance travelled class of related basic motion notation for other affecting factors related basic motion such as accuracy and weight. This time is should be added on the time for a b c.
MTM
Example : R 16 A = Reach, distance 16 inches, description A G 1 A = Grasp, description 1A = 2.0 x 0.036 =0.072 second
MTM
MTM-V : Metal cutting operations MTM-C : Clerical work administration. MTM-M : work using stereoscopic microscope.
MOST
Kjell Zendin HB Maynard and Company (1960). For every types of activity can have different motions sequences. Thats why the models activity sequence separation in MOST method. The separation is divided into 3 motion sequences that depict manual working.
MOST
1. General Motion Sequence (The general move sequence). 2. The controlled move sequence. 3. The tool use sequence.
MOST
MOST
MOST
Based on activity conducted and adjusted with the table, every parameter is indexed accordingly, where as the sequence become AiBiGiAiBiPiAi
Wsorking time is determined by adding indexes (i) of every parameter and times by 10 and the score will be obtained in TMU, then converted to second, minutes or hour as needed.
26
28
30
A BG
get
M XI
move
A
return
Parameter M = push, pull, pivot. Parameter X = because the process done by machine. Parameter I = straightening movement that shows manual movement that is controlled or in the end of the process time to obtain straightened object.
32
33
ABP
In the part of using tools is filled with one of the parameter: FCLSMRT
34
STUDY CASE
R 16 A R 27 B R 34 A R 39 B M 17 A People is move from one place with the distance of 5 feets, to take a plier and use it. Daily Activities.