Lecture 3

The document discusses various software metrics used to measure process and projects. It describes different types of metrics including size-oriented metrics, function-oriented metrics and defines key terms like measures, metrics and indicators. Function points are discussed as a popular function-oriented metric to measure functionality.

Uploaded by

M BILAL M BILAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Lecture 3

The document discusses various software metrics used to measure process and projects. It describes different types of metrics including size-oriented metrics, function-oriented metrics and defines key terms like measures, metrics and indicators. Function points are discussed as a popular function-oriented metric to measure functionality.

Uploaded by

M BILAL M BILAL
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 36

Software Project Management

Lecture # 3
Outline
 Metrics for Process and Projects
 Introduction
 Software Metrics
 Process metrics
 Project metrics
 Direct and Indirect software measures
 Software Measurement
 Size-oriented Metrics
 Function-oriented Metrics
 Object-oriented Metrics
 Use-case-oriented Metrics
 Software Quality Metrics
Introduction
 Software process and project metrics
are quantitative measures that enable
software engineers to gain insight into
efficacy of the software process and
projects that are conducted using the
process as a framework.
Introduction (Contd.)
 Basic quality & productivity data
(called measures) are collected.
 These data are then analyzed,
compared against past averages (for
similar projects) , and assessed to
determine whether productivity &
quality improvements have occurred.
Introduction (Contd.)
 Metrics also indicate problem areas in
processes and projects which can then
be rectified.
 Project metrics contribute to
development of process metrics.
Introduction - Basic Terms
 What is Measurement?
 It is the act of obtaining a measure.
 It is a mechanism of objective
evaluation.
 It enables managers and practitioners
to improve software process.
 It assists in planning, tracking and
controlling a software project and
assessing product quality.
Introduction - Basic Terms (Contd.)

 What is a Measure?
 To ascertain or appraise by comparing to
a standard [1]
OR
 A standard or unit of measurement; the
extent, dimensions, capacity, etc., of
anything, especially as determined by a
standard [2]

[1]IEEE Standard Glossary of Software Engineering Terminology, IEEE Std 729 1983.
[2]Engineering an Effective Measurement Program Course Notes, 1994.
Introduction - Basic Terms (Contd.)
 What is a Metric?
 A metric is quantitative measure of the degree to
which a system, component or process
possesses a given attribute (IEEE definition)

 A metric is the degree to which a particular


subject possesses the quality that is being
measured. It is based upon two or measures.
(Ref: http://it.toolbox.com/blogs/dw-cents/measures-metrics-and-indicators-23543)
Introduction - Basic Terms (Contd.)
 Difference between terms:
 Measure
 It is a value which does not provide enough
information to make meaningful decisions
 Metric
 A comparison of two or more measures, e.g.,
temperature values over time, errors per KLOC
 Indicator
 Compares a metric against a baseline or
expected result and helps in making decisions
 Reference:
http://www.stsc.hill.af.mil/crosstalk/1995/03/Measure.asp
Reference:
http://www.stsc.hill.af.mil/crosstalk/1995/03/Measure.asp
Process Metrics
& Software Process Improvement
 To improve a process
 Measure specific attributes of process
 Develop meaningful metrics based on these attributes
 These metrics provide indicators that lead to strategy for
improvement
 Example
 Metrics can be derived from the following process
outcomes/attributes
 Errors uncovered before software release,
 defects delivered to & reported by end-user,
 work products delivered,
 Human efforts expended,
 Calendar time expended,
 Schedule conformance and other measures.
Improving Software Quality &
Organizational Performance
 It is important to note that process is only
one of the many controllable factors in
improving software quality and
organizational performance.
 The figure (on next slide) shows other
factors connected with the ‘process’ that
have significant influence on the same:
 The skill and motivation of people
 The complexity of the product
 The technology
Improving Software Quality &
Organizational Performance
Process connects 3 important factors that influence software quality and
organizational performance

Product

Customer Business
Characteristics conditions

Process

People Technology
Development environment
Project Metrics
 Used by project managers and software team to
adapt project workflow and technical activities.
 Objective is
 To minimize the development schedule by making
adjustments that can avoid delays and mitigate potential
problems.
 To assess product quality on an ongoing basis and when
necessary, modify technical approach to improve quality.
 Most first application of project metrics on software
projects occurs during estimation (of time, effort).
 More project metrics are used as technical work of project
commences.
Software Measurement
 Software measurement can be categorized in
two ways
 (1) direct measures of software process and product
 (2) indirect measures of software product
 Direct Measures
 of software process are
 Cost and effort
 of software product are
 Line of Code (LOC)
 Execution Speed
 Defects over specified period of time
Software Measurement (Contd.)
 Indirect Measures
 Of product are
 Functionality
 Quality
 Complexity
 Efficiency
 Reliability
 Maintainability
 .. Other Abilities
Size Oriented Metrics
 These are derived by normalizing quality
and/or productivity measures by
considering the size of software that has
been produced.
 Assume that an organization maintains
record of the following size-oriented
measures for each project completed:
 Lines of code (LOC)
 Effort in person-months
(see next slide)
Size Oriented Metrics (Contd.)
 Project cost (in dollars)
 Number of pages of documentation
 Number of errors
 Number of defects
 Number of people involved
 To develop metrics that can be
incorporated with other similar projects,
we choose LOC as a normalization
factor.
Size Oriented Metrics (Contd.)
 Hence the following set of size-oriented
metrics can be developed for each project:
 Errors per KLOC (thousand lines of code)
 Defects per KLOC
 $ per KLOC
 Pages of documentation per KLOC
 Other metrics can be:
 Errors per person-month
 KLOC per person-month
 $ per page of documentation
Size Oriented Metrics - Pros
and cons
 Size-oriented metrics are widely used but
not universally accepted as best way to
measure a software process
 Controversy lies in using LOC as a key
measure
 Proponents claim
 LOC is easy to count
 Many existing estimation models use LOC or
KLOC as key input
 Large literature & data based on LOC exists
Size Oriented Metrics - Pros
and cons
 But opponents argue that
 LOC measures are programming language
dependent
 When considering productivity, LOC criteria
penalizes well designed short programs
 Can not accommodate non procedural
languages
 Planner must estimate LOC long before
analysis and design
Function-oriented Metrics
 These use a measure of the functionality
delivered by application as a
normalization value.
 Most widely used function-oriented metric
is function point (FP)
 FP’s computation is based on
characteristics of software information
domain and complexity.
Function-oriented Metrics:
Function Point

 Function points are a measure of the size


of computer applications and the projects
that build them.
 The size is measured from a functional or
user, point of view.
 It is independent of the computer language,
development methodology, technology or
capability of the project team used to
develop the application.

Reference URL: http://ourworld.compuserve.com/homepages/softcomp/fpfaq.htm


Function-oriented Metrics:
Function Point (Contd.)
 First proposed by Albrecht; can be used to
measure functionality delivered by a system.
 Using historical data, FP can be used to:
 Estimate cost and effort required to design, code
and test the software,
 Predict no. of errors that will be encountered
during testing,
 Forecast the no. of components and/or project
source lines in the implemented system.
Computing function points
(cont..) (Contd.)
 Following empirical relationship is used to compute
Function Point (FP)

FP= count total x [0.65+ 0.01 x Σ(Fi)]

 Fi (i=1 to 14 ) are VAF (Value adjustment factors) or


simply ‘adjustment values’ based on answers to
some questions (See list of 14 Qs on Page 473 from book 6 edition )
th

 Answer to these questions are on a scale of 0 (not


applicable) to 5 (absolutely essential)
Function-oriented Metrics:
Function Point (Contd.)
 Count total is calculated using the following
information domain values:
 External inputs (EIs)
 External outputs (EOs)
 External inquiries (EQs)
 Internal logic files (ILFs)
 External interface files (EIFs)
Function-oriented Metrics:
Function Point (Contd.)
 Each information domain value is multiplied
by a weighting factor (simple, average or
complex) and all values are added to get
count total.
 See example in book (Roger Pressman
page 473)
Function-oriented Metrics:
Function Point (Contd.)
 Like LOC, FP is also controversial
 Proponents claim
 It is prog. Language independent, hence ideal for
conventional and non-procedural languages
 Based on data that can be known early phases of
projects
 Opponents claim
 Computation is based on subjective rather than
objective data
 counts of information domain may be difficult to
collect
 FP is just a number and has no physical meaning
Object-oriented Metrics
 FP and LOC can be used to estimate OO
software projects but these metrics do not
address all aspects of such projects.
 Hence OO metrics are used for object-
oriented projects
 Set of metrics for OO projects:
 Number of scenario scripts
 These are detailed sequence of steps about
user and application interaction
 These are directly correlated to application size
and no. of test cases
Object-oriented Metrics (Contd.)
 Number of key classes
 Key classes are independent components
 They Indicate amount of development effort
and potential reuse
 Number of support classes
 Required to implement the system but not
directly related to problem domain, e.g., UI
classes, DB access, etc.
 These indicate amount of development effort
and potential reuse
Object-oriented Metrics (Contd.)
 Average number of support classes per key
class
 If these are known then estimation (based on total
no. of classes) would be much simplified.
 Number of sub systems (aggregation of
classes)
 If identified, it is easier to lay out the schedule
in which work on subsystems is partitioned
among project staff.
Use-case oriented Metrics
 Use-cases describe user visible functions and
features.
 They are defined early in software process and can
be used as normalization measure before
significant activities are initiated.
 They are independent of programming language
 No. of use cases directly proportional to
 size of application in LOC &
 no. of test cases that will be designed
 There is no standard size of a use case as they are
created at different levels of abstraction
 For this reason, it is a suspect as a normalization measure
Web Engineering Project Metrics

 Reading assignment, pages 559, 660,


661
Software Quality Metrics
 Measuring quality through
 Correctness
 It is degree to which software performs its required
function
 Common measure= defects per KLOC
 For quality assessment defects are counted typically
for 1 year
 Maintainability
 It is the ease with which a program can be
 corrected if an error is found
 Adapted if environment changes or
 Enhanced if customer desires
 Measured indirectly, e.g., Mean-time-to change
(MTTC)
 Maintainable programs -> lower MTTC
Software Quality Metrics
 Integrity
 System’s ability to withstand (accidental &
intentional) attacks
 Two more attributes that help determine
integrity
 threat = probability of attack within a given time
(that causes failure)
 security = probability that an attack will be repelled
 Integrity =  [1 – (threat * (1 – security))]
 Usability
 It quantifies ease of use and learning (time)
References
 Today’s lecture taken from
 Roger Pressman’s “Software Engineering
a practitioner’s approach”
 Chapter 22 - “Metrics for Process & Projects”
 Chapter 15 - For details of FP computation,
15.3.1, page 472
 For more in-depth study of function
points, see http://devdaily.com/fpa/fpa-
borland/what-are-fps.shtml