Tugas Program Linear - Metode Grafik
Tugas Program Linear - Metode Grafik
per month.
It takes 3 hours to produce one unit of A and 1
problem.
Exercise 4:
problem.
Tons of raw materials per Max daily
ton. availability
Exterior Interior (tons)
Paints Paints
M1 6 4 24
M2 1 2 6
Profit per ton 5 4
($ 1000)
A market survey restricts the maximum daily
demand of interior paint to 2 tons. Also the daily
demand for interior paint cannot exceed that of
exterior paint by more than 1 ton. The company
wants to determine the optimum product mix of
exterior and interior paints that maximizes the
total daily profit. Formulate the problem and
use graphical method to determine the
optimum product mix that maximizes the total
daily profit.
Exercise 5: