The document provides instructions for starting up a turbine generator after a grid failure, including ensuring seal steam parameters, starting auxiliary oil pumps, opening the barring gear valve, monitoring turbine speed, and checking diesel generators.

Uploaded by

harisankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
156 views5 pages

Turbine Emergency Procedure

The document provides instructions for starting up a turbine generator after a grid failure, including ensuring seal steam parameters, starting auxiliary oil pumps, opening the barring gear valve, monitoring turbine speed, and checking diesel generators.

Uploaded by

harisankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 5

 Ensure One AOP & one SOP in service with

Normal/Emergency supply
 After grid failure, DCEOP, DC SEAL OIL PUMP should
come in auto start. if not come on auto, this DC
pumps should be started manually by the desk
engineer.
 Ensure seal steam of above 300mmwc & temperature
above 280 Deg C. If not maintained, immediately kill
the vacuum. Isolate seal steam at 0.8 ksc abs to avoid
cold air ingress via turbine seals.
 One JOP should come at 510rpm
 Barring gear valve should open at 210rpm
 Rise the Lube oil header temp to 50 Deg C
 If turbine speed reduces below 60 rpm, start one
more AOP.
 If speed is further dropping below 40rpm, Stop
JOP, wait for JO Pressure reduced to Zero and
restart JOP.
 Check the healthiness of DC EOP& DC SOP in
every shift/every day and check the pressure
developed at local.
 During start up, ensure no water is available in
CRH/MS line to avoid hanger failure due to
hammering
 When both GTs got tripped and no standby
transformer in service

 DG incomer will close automatically and


charge full DG MCC with this supply. This
MCC provides supply to AOP2, JOP2, PWP-2
& SOP2 with this, turbine barring gear shall
be ensured.
 If DG incomer breaker in DG MCC won’t close
automatically, the same may be mechanically
closed from MCC after ensuring “MCC is
dead”
 DG set shall be checked atleast thrice in a
week regularly. DG incomer shall be
synchronized with Stn incomer supply and
vice versa after ensuring second pump of
AOP, JOP & SOP are not in service.