Testing of wells
Initial stage
Testing of oil or gas wells plays great role in the development of the oil or gas reservoirs.
Production stage
Slug test
Production logging
Bottom hole party is responsible to carry out fluid flow tests on the wells in
the field.
Gathering information
Wellhead
The wellhead includes all equipment on the surface that supports the various pipe strings, seals off the well, and
controls the paths and flow rates of reservoir fluids. Sometimes, a simple assembly to support the weight of the
tubing in the well is enough. All wellheads have at least one casinghead and casing hanger, usually, a tubing
head and tubing hanger, and a Christmas tree).
Casinghead
Each string of casing usually hangs from a casinghead, a heavy steel fitting at the surface. Metal and rubber
seals in dhe casinghead prevent fluids from movmg within the wellhead or escaping to the atmosphere. Each
casin head also has a place for a pressure gauge to warn of leaks.
Tubing Head
Similar in design and use to the casinghead, the tubing head supports the tubing string, seals off pressure
between the casing and the inside of tubing and provides connections at the surface to control the flowing liquid
or gas. The tubing head often stacks above the uppermost casinghead. Like the casingheads, it has outlets to
allow access to the annulus for gauging pressure or connecting valves and fittings to control the flow of fluids.
Capacity Of the well
Productivity Index
Primary measure of the capacity of the well
PI = Q/(Pres- Pwf)
=Flow rate/Draw down
To produce oil from well at optimum rate. Tis would keep well healthy and
No sand production
Done in similar way as oil well. The pressure draww downs may be low and
– American Method
– Russian Method
To Consumer
FC / PNU.RECO
DIP MEASURMENT
PG TG
Determination of the relative quantities of oil, gas and water produced under normal producing
conditions. They serve as an aid in well and reservoir operation and also in meeting legal and
regulatory requirements.
Usually performed on initial completion or recompilation to determine the capability of the well
under various degree of pressure drawdown. Results may set production allowable, aid in selections
of well completion methods, and design of artificial lift systems and production facilities.
Require a high degree of sophistication and are used to determine formation damage or stimulation
has been employed for reservoir. Some of the important transient pressure tests
as follows:
Pressure buildup
Pressure drawdown
Multiple rate
Each type presents certain advantages and limitation and certain factors which
are important for reasonable results. Details are provided concerning pressure
build up tests.
used.
Well Testing