ISTQBCH2
ISTQBCH2
ISTQBCH2
Software Testing
ISTQB / ISEB Foundation Exam Practice
4 Dynamic test
5 Management 6 Tools
techniques
Lifecycle
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
V-Model: test levels
Business Acceptance
Requirements Testing
System System
Specification Testing
Component
Code
Testing
V-Model: late test design
Tests
Business Acceptance
Requirements Testing
Tests
Project “We don’t have Integration Testing
Specification time to design in the Large
tests early”Tests
System System
Specification Testing
Tests
Design Integration Testing
Specification in the Small
Tests
Component
Code
Testing Design
Tests?
V-Model: early test design
Tests Tests
Business Acceptance
Requirements Testing
Tests Tests
Project Integration Testing
Specification in the Large
Tests Tests
System System
Specification Testing
Tests Tests
Design Integration Testing
Specification in the Small
Tests Tests
Component
Design Code
Testing Run
Tests Tests
Early test design
test design finds faults
faults found early are cheaper to fix
most significant faults found first
faults prevented, not built in
no additional effort, re-schedule test design
changing requirements caused by test design
2 mo 2 mo
Phase 1: Plan
dev test
"has to go in"
but didn't work
Actual
fraught, lots of dev overtime
2 mo 662wks
mo
Phase
Phase1: Plan 22 mo
mo wks
Phase 2:
2: Plan
Plan dev test
dev
dev test
test "has totest:
go in"
acc
acc test: full
full
but didn't
week work
week (vs
(vs half
half day)
day)
Actual
Actual
Actual on
on time
time
fraught, lots of dev overtime
smooth,
smooth, not
not much
much for
for dev
dev to
to do
do
test 1st1st
mo. users
Quality
Quality
test
test 1st mo.
mo. not
Quality 150 faults 500 faults
happy
happy
happy
50
50 faults
faults 0 faults
faults users!
users!
Validation
Testing
Any
Verification
V-model exercise
The V Model - Exercise
Build Assembly
VD Review VD
Assemblage Test
Build System
DS Review DS
System Test
Build Integration
FD Review FD
Components Test
Build Exceptions:
TD Review TD FUT
Units
Conversion Test
FOS: DN/Gldn
Code TUT
How would you test this spec?
A computer program plays chess with one
user. It displays the board and the pieces on
the screen. Moves are made by dragging
pieces.
“Testing is expensive”
Compared to what?
What is the cost of NOT testing, or of faults missed
that should have been found in test?
- Cost to fix faults escalates the later the fault is found
- Poor quality software costs more to use
• users take more time to understand what to do
• users make more mistakes in using it
• morale suffers
• => lower productivity
Do you know what it costs your organisation?
What do software faults cost?
Have you ever accidentally destroyed a PC?
- knocked it off your desk?
- poured coffee into the hard disc drive?
- dropped it out of a 2nd storey window?
How would you feel?
How much would it cost?
Hypothetical Cost - 1
(Loaded Salary cost: £50/hr)
Fault Cost Developer User
- detect ( .5 hr) £25
- report ( .5 hr) £25
- receive & process (1 hr) £50
- assign & bkgnd (4 hrs) £200
- debug ( .5 hr) £25
- test fault fix ( .5 hr) £25
- regression test (8 hrs) £400
£700 £50
Hypothetical Cost - 2
1000
100
10
Do your own calculation
- calculate cost of testing
• people’s time, machines, tools
- calculate cost to fix faults found in testing
- calculate cost to fix faults missed by testing
Estimate if no data available
- your figures will be the best your company has!
(10 minutes)
Lifecycle
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
(Before planning for a set of tests)
set organisational test strategy
identify people to be involved (sponsors,
testers, QA, development, support, et al.)
examine the requirements or functional
specifications (test basis)
set up the test organisation and infrastructure
defining test deliverables & reporting
structure
See: Structured Testing, an introduction to TMap®, Pol & van Veenendaal, 1998
High level test planning
What is the purpose of a high level test plan?
- Who does it communicate to?
- Why is it a good idea to have one?
What information should be in a high level test
plan?
- What is your standard for contents of a test plan?
- Have you ever forgotten something important?
- What is not included in a test plan?
Test Plan 1
1 Test Plan Identifier
2 Introduction
- software items and features to be tested
- references to project authorisation, project plan, QA
plan, CM plan, relevant policies & standards
3 Test items
- test items including version/revision level
- how transmitted (net, disc, CD, etc.)
- references to software documentation
4 Features to be tested
- identify test design specification / techniques
5 Features not to be tested
- reasons for exclusion
Test Plan 3
6 Approach
- activities, techniques and tools
- detailed enough to estimate
- specify degree of comprehensiveness (e.g. coverage) and other
completion criteria (e.g. faults)
- identify constraints (environment, staff, deadlines)
7 Item Pass/Fail Criteria
8 Suspension criteria and resumption criteria
- for all or parts of testing activities
- which activities must be repeated on resumption
Test Plan 4
9 Test Deliverables
- Test plan
- Test design specification
- Test case specification
- Test procedure specification
- Test item transmittal reports
- Test logs
- Test incident reports
- Test summary reports
Test Plan 5
10 Testing tasks
- including inter-task dependencies & special skills
11 Environment
- physical, hardware, software, tools
- mode of usage, security, office space
12 Responsibilities
- to manage, design, prepare, execute, witness, check,
resolve issues, providing environment, providing the
software to test
Test Plan 6
13 Staffing and Training Needs
14 Schedule
- test milestones in project schedule
- item transmittal milestones
- additional test milestones (environment ready)
- what resources are needed when
15 Risks and Contingencies
- contingency plan for each identified risk
16 Approvals
- names and when approved
Lifecycle
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
Component testing
lowest level
tested in isolation
most thorough look at detail
- error handling
- interfaces
usually done by programmer
also known as unit, module, program testing
Component test strategy 1
specify test design techniques and rationale
- from Section 3 of the standard*
specify criteria for test completion and rationale
- from Section 4 of the standard
document the degree of independence for test
design
- component author, another person, from different
section, from different organisation, non-human
component integration and environment
- isolation, top-down, bottom-up, or mixture
- hardware and software
document test process and activities
- including inputs and outputs of each activity
affected activities are repeated after any fault fixes
or changes
project component test plan
- dependencies between component tests
Component Component
Test Strategy
Test Document
Project
Hierarchy Component
Test Plan
Component
Test Plan
Source: BS 7925-2,
Software Component
Testing Standard, Component
Annex A Test
Specification
Component
Test Report
Component test process
BEGIN
Component
Test Planning
Component
Test Specification
Component
Test Execution
Component
Test Recording
Checking for
Component END
Test Completion
Component test process
BEGIN Component test planning
- how the test strategy and
Component
Test Planning
project test plan apply to
the component under test
Component - any exceptions to the strategy
Test Specification - all software the component
will interact with (e.g. stubs
Component
Test Execution
and drivers
Component
Test Recording
Checking for
Component END
Test Completion
Component test process
BEGIN
Component
Test Planning
Component
Test Specification
Component test execution
Component - each test case is executed
Test Execution - standard does not specify
whether executed manually
Component
Test Recording or using a test execution
tool
Checking for
Component END
Test Completion
Component test process
Component test recording
BEGIN
- identities & versions of
Component component, test specification
Test Planning - actual outcome recorded &
compared to expected outcome
Component - discrepancies logged
Test Specification
- repeat test activities to establish
Component removal of the discrepancy
Test Execution (fault in test or verify fix)
- record coverage levels achieved
Component for test completion criteria
Test Recording
specified in test plan
Checking for
Component Sufficient
END to show test
Test Completion activities carried out
Component test process
BEGIN
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
Integration testing
in the small
more than one (tested) component
communication between components
what the set can perform that is not possible
individually
non-functional aspects if possible
integration strategy: big-bang vs incremental
(top-down, bottom-up, functional)
done by designers, analysts, or
independent testers
Big-Bang Integration
In theory:
- if we have already tested components why not just
combine them all at once? Wouldn’t this save time?
- (based on false assumption of no faults)
In practice:
- takes longer to locate and fix faults
- re-testing after fixes more extensive
- end result? takes more time
Incremental Integration
Baseline 0: tested component
Baseline 1: two components
Baseline 2: three components, etc.
Advantages:
- easier fault location and fix
- easier recovery from disaster / problems
- interfaces should have been tested in component tests,
but ..
- add to tested baseline
Top-Down Integration
Baselines:
- baseline 0: component a a
- baseline 1: a + b
- baseline 2: a + b + c b c
- baseline 3: a + b + c + d
- etc.
d e f g
Need to call to lower
level components not
yet integrated h i j k l m
Stubs: simulate missing
components n o
Stubs
Stub (Baan: dummy sessions) replaces a called
component for integration testing
Keep it Simple
- print/display name (I have been called)
- reply to calling module (single value)
- computed reply (variety of values)
- prompt for reply from tester
- search list of replies
- provide timing delay
Pros & cons of top-down approach
Advantages:
- critical control structure tested first and most often
- can demonstrate system early (show working menus)
Disadvantages:
- needs stubs
- detail left until last
- may be difficult to "see" detailed output (but should have
been tested in component test)
- may look more finished than it is
Bottom-up Integration
Baselines: a
- baseline 0: component n
- baseline 1: n + i b c
- baseline 2: n + i + o
- baseline 3: n + i + o + d d e f g
- etc.
Needs drivers to call h i j k l m
the baseline configuration
Also needs stubs n o
for some baselines
Drivers
Driver (Baan: dummy sessions): test harness:
scaffolding
specially written or general purpose
(commercial tools)
- invoke baseline
- send any data baseline expects
- receive any data baseline produces (print)
each baseline has different requirements from
the test driving software
Pros & cons of bottom-up approach
Advantages:
- lowest levels tested first and most thoroughly (but should have
been tested in unit testing)
- good for testing interfaces to external environment (hardware,
network)
- visibility of detail
Disadvantages
- no working system until last baseline
- needs both drivers and stubs
- major control problems found last
Minimum Capability Integration
(also called Functional)
Baselines: a
- baseline 0: component a
- baseline 1: a + b b c
- baseline 2: a + b + d
- baseline 3: a + b + d + i d e f g
- etc.
h i j k l m
Needs stubs
Shouldn't need drivers
n o
(if top-down)
Pros & cons of Minimum Capability
Advantages:
- control level tested first and most often
- visibility of detail
- real working partial system earliest
Disadvantages
- needs stubs
Thread Integration
(also called functional)
order of processing some event
determines integration order a
interrupt, user transaction
b c
minimum capability in time
advantages:
d e f g
- critical processing first
- early warning of
performance problems
h i j k l m
disadvantages:
- may need complex drivers and stubs n o
Integration Guidelines
minimise support software needed
integrate each component only once
each baseline should produce an easily
verifiable result
integrate small numbers of components at
once
- one at a time for critical or fault-prone components
- combine simple related components
Integration Planning
integration should be planned in the
architectural design phase
the integration order then determines the
build order
- components completed in time for their baseline
- component development and integration testing can
be done in parallel - saves time
Lifecycle
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
System testing
last integration step
functional
- functional requirements and requirements-based testing
- business process-based testing
non-functional
- as important as functional requirements
- often poorly specified
- must be tested
often done by independent test group
Functional system testing
Functional requirements
- a requirement that specifies a function that a system
or system component must perform (ANSI/IEEE
Std 729-1983, Software Engineering Terminology)
Functional specification
- the document that describes in detail the
characteristics of the product with regard to its
intended capability (BS 4778 Part 2, BS 7925-1)
Requirements-based testing
Uses specification of requirements as the
basis for identifying tests
- table of contents of the requirements spec provides
an initial test inventory of test conditions
- for each section / paragraph / topic / functional area,
• risk analysis to identify most important / critical
• decide how deeply to test each functional area
Business process-based testing
Expected user profiles
- what will be used most often?
- what is critical to the business?
Business scenarios
- typical business transactions (birth to death)
Use cases
- prepared cases based on real situations
Non-functional system testing
different types of non-functional system tests:
- usability - configuration / installation
- security - reliability / qualities
- documentation - back-up / recovery
- storage - performance, load, stress
- volume
Performance Tests
Timing Tests
- response and service times
- database back-up times
Capacity & Volume Tests
- maximum amount or processing rate
- number of records on the system
- graceful degradation
Endurance Tests (24-hr operation?)
- robustness of the system
- memory allocation
Multi-User Tests
Concurrency Tests
- small numbers, large benefits
- detect record locking problems
Load Tests
- the measurement of system behaviour under realistic
multi-user load
Stress Tests
- go beyond limits for the system - know what will happen
- particular relevance for e-commerce
messages tailored and meaningful to (real)
users?
coherent and consistent interface?
sufficient redundancy of critical information?
within the "human envelope"? (7±2 choices)
feedback (wait messages)?
clear mappings (how to escape)?
passwords
encryption
hardware permission devices
levels of access to information
authorisation
covert channels
physical security
Configuration and Installation
Configuration Tests
- different hardware or software environment
- configuration of the system itself
- upgrade paths - may conflict
Installation Tests
- distribution (CD, network, etc.) and timings
- physical aspects: electromagnetic fields, heat, humidity,
motion, chemicals, power supplies
- uninstall (removing installation)
Reliability / Qualities
Reliability
- "system will be reliable" - how to test this?
- "2 failures per year over ten years"
- Mean Time Between Failures (MTBF)
- reliability growth models
Other Qualities
- maintainability, portability, adaptability, etc.
Back-up and Recovery
Back-ups
- computer functions
- manual procedures (where are tapes stored)
Recovery
- real test of back-up
- manual procedures unfamiliar
- should be regularly rehearsed
- documentation should be detailed, clear and thorough
Documentation Testing
Documentation review
- check for accuracy against other documents
- gain consensus about content
- documentation exists, in right format
Documentation tests
- is it usable? does it work?
- user manual
- maintenance documentation
Lifecycle
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
Integration testing in the large
Tests the completed system working in
conjunction with other systems, e.g.
- LAN / WAN, communications middleware
- other internal systems (billing, stock, personnel,
overnight batch, branch offices, other countries)
- external systems (stock exchange, news, suppliers)
- intranet, internet / www
- 3rd party packages
- electronic data interchange (EDI)
Approach
Identify risks
- which areas missing or malfunctioning would be most
critical - test them first
“Divide and conquer”
- test the outside first (at the interface to your system, e.g. test
a package on its own)
- test the connections one at a time first
(your system and one other)
- combine incrementally - safer than “big bang”
(non-incremental)
Planning considerations
resources
- identify the resources that will be needed
(e.g. networks)
co-operation
- plan co-operation with other organisations
(e.g. suppliers, technical support team)
development plan
- integration (in the large) test plan could influence
development plan (e.g. conversion software needed early on
to exchange data formats)
Lifecycle
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
User acceptance testing
Final stage of validation
- customer (user) should perform or be closely involved
- customer can perform any test they wish, usually
based on their business processes
- final user sign-off
Approach
- mixture of scripted and unscripted testing
- ‘Model Office’ concept sometimes used
Why customer / user involvement
Users know:
- what really happens in business situations
- complexity of business relationships
- how users would do their work using the system
- variants to standard tasks (e.g. country-specific)
- examples of real cases
- how to identify sensible work-arounds
80% of function
by 20% of code
20% of function
by 80% of code
System testing
distributed over
this line
Contract acceptance testing
Contract to supply a software system
- agreed at contract definition stage
- acceptance criteria defined and agreed
- may not have kept up to date with changes
Contract acceptance testing is against the
contract and any documented agreed changes
- not what the users wish they had asked for!
- this system, not wish system
Alpha and Beta tests: similarities
Testing by [potential] customers or representatives of
your market
- not suitable for bespoke software
When software is stable
Use the product in a realistic way in its operational
environment
Give comments back on the product
- faults found
- how the product meets their expectations
- improvement / enhancement suggestions?
Alpha and Beta tests: differences
Alpha testing
- simulated or actual operational testing at an in-
house site not otherwise involved with the software
developers (i.e. developers’ site)
Beta testing
operational testing at a site not otherwise involved
with the software developers (i.e. testers’ site,
their own location)
Acceptance testing motto
Contents
Models for testing, economics of testing
High level test planning
Component Testing
Integration testing in the small
System testing (non-functional and functional)
Integration testing in the large
Acceptance testing
Maintenance testing
Maintenance testing
Testing to preserve quality:
- different sequence
• development testing executed bottom-up
• maintenance testing executed top-down
• different test data (live profile)
- breadth tests to establish overall confidence
- depth tests to investigate changes and critical areas
- predominantly regression testing
What to test in maintenance testing
Test any new or changed code
Impact analysis
- what could this change have an impact on?
- how important is a fault in the impacted area?
- test what has been affected, but how much?
• most important affected areas?
• areas most likely to be affected?
• whole system?
The answer: “It depends”
Poor or missing specifications
Consider what the system should do
- talk with users
Document your assumptions
- ensure other people have the opportunity to review them
Improve the current situation
- document what you do know and find out
Track cost of working with poor specifications
- to make business case for better specifications
What should the system do?
Alternatives
- the way the system works now must be right (except
for the specific change) - use existing system as the
baseline for regression tests
- look in user manuals or guides (if they exist)
- ask the experts - the current users
Without a specification, you cannot really test,
only explore. You can validate, but not verify.
Lifecycle