APH5
APH5
APH5
PRESENTATION ON
AIR PREHEATERS
FARAKKA STPS
APH SPECIFICATIONS- 3x200 MW
4 Cam clutch box Tsubaki Morse cam clutch Box type 08-60
8 No. of sectors 12
8 No. of sectors 12
Total Outages - 8
Hrs. Lost : 7+ 189 =196 Hrs.
Forced Outage : 0.68 %
OUTAGES DUE TO AIRPREHEATERS
(2006-07)
Total Outages - 2
Hrs. Lost : 6+15 = 21 Hrs.
Forced Outage : 0.04 %
OUTAGES DUE TO AIRPREHEATERS
(2007-08)
Total Outages - 2
Hrs. Lost : 45 Hrs.
Forced Outage : 0.64%
ANALYSIS OF OUTAGES
ACTION TAKEN:
• Regular Analysis of Lube oil at R&D for PQ index
• Replacement of oil if PQ index found high
• Inspection of bearing at the earliest opportunity.
• Ensuring healthiness of Lube oil system.
• Skilled maintenance staff.
ANALYSIS OF OUTAGES
ACTION TAKEN:
• Static seal on either sides.
• Locking of the axial seal Plates (temp).
• Inspect the locks at the available opportunity.
• Modify the axial seal plate design.
Guide
ACTION TAKEN:
• Replacement of new bracing pipe
• Replacement of Gassette plates
• Angle protection to the bracing pipe.
• Angle protection to the water manifold.
• Removal of misc. bracing pipes/supports.
ANALYSIS OF OUTAGES
ACTION TAKEN:
• Regular servicing /inspection of the bearings
ANALYSIS OF OUTAGES
ACTION TAKEN:
• Full welding with Bolting of shroud plates
• Additional angle for protecting the welding.
• Full welding of shroud joints
• Removal of all patch welding plates.
• Replacement of damaged FG inlet duct.
EXPANSION JOINT SHROUD PLATE ARRANGEMENT
Full
Welding
+
Bolting
EXISTING PROPOSED
BEST PRACTICES :