WELCOME TO

PRESENTATION ON
AIR PREHEATERS

FARAKKA STPS
APH SPECIFICATIONS- 3x200 MW

1 APH Size 27 VI 80” 720, Heater Nos. 212 to 217


2 Drive Gearbox: 5 APC, FALK 110:1, w/out over running
clutch
Coupling : Pembril Fluid Drive : 11.5 FCU with
multi disc
Motor : 11 KW, 1500 RPM

3 Air Motor Chicago Pneumatic, Type : 3501 RSM 400

4 Cam clutch box Tsubaki Morse cam clutch Box type 08-60

5 Support Bearing SKF Sp. Roller Thrust Bearing, SKF 294500

6 Rotor Guide Spherical Roller Bearing : SKF 23060


Bearing

7 Lubrication Forced-Both support and guide bearing

8 No. of sectors 12

9 Baskets 120+120(HE/HIE-850mm)+168 (CE) = 408


PAPH SPECIFICATIONS- 2 x 500 MW

1 APH Size 27 VI 80” 720, Heater Nos. 350,351,354 & 355


2 Drive Gearbox: ELLI Type K3V 250 SP, Ratio 1-113,
Coupling :Hydrodynamic transfluid Type KRD-11
Motor : 15 KW

3 Air Motor Ingersol Rand Type 92 RA 011

4 Clutch box Ring spann Type FBE.57.DX

5 Support Kingsbury size 41 BV series 450+ SKF 23234


Bearing CCK/W33
Rotor Guide
6 Spherical Roller Bearing : SKF 23060 CCK/ C3/W33
Bearing

7 Lubrication Forced-Both support and guide bearing

8 No. of sectors 12

9 Baskets 120+120(HE/HIE-875mm)+144 (CE-305mm) = 384


SAPH SPECIFICATIONS- 2 x 500 MW

1 APH Size 30.5 VI –M, Heater Nos. 352,353,356 & 357


2 Drive Gearbox: ELLI Type K3V 320 SP, Ratio 1-135,
Coupling :Hydrodynamic transfluid Type KRD-12
Motor : 22 KW

3 Air Motor Ingersol Rand Type 92 RA 017

4 Clutch box Ring spann Type FBE.72.DX

5 Support Kingsbury size 56 BV series 1000+ SKF 23244


Bearing CCK/W33
Rotor Guide
6 Spherical Roller Bearing : SKF 23072 CCK/
Bearing
C3/W33

7 Lubrication Forced-Both support and guide bearing.

8 No. of sectors 24 (Modular)

9 Baskets 168+168(HE/HIE-1075mm)+192 (CE-305 mm)= 528


OUTAGES DUE TO AIRPREHEATERS
(2005-06)
Sl. REASON 200 500 MW
No. MW PAPH SAPH

1 Failure of axial seal plate adjustor bolts 0 4 0

2 GB input shaft bearing failure 0 1 0

3 Support Bearing Failure 0 1 0

4 Falling of eroded bracing pipe. 2 0 0

Total Outages - 8
Hrs. Lost : 7+ 189 =196 Hrs.
Forced Outage : 0.68 %
OUTAGES DUE TO AIRPREHEATERS
(2006-07)

Sl. REASON 200 500 MW


No. MW PAPH SAPH

1 Failure of axial seal plate adjustor bolts 0 1 0

2 GB input shaft bearing failure 1 0 0

Total Outages - 2
Hrs. Lost : 6+15 = 21 Hrs.
Forced Outage : 0.04 %
OUTAGES DUE TO AIRPREHEATERS
(2007-08)

Sl. REASON 200 500 MW


No. MW PAPH SAPH

1 Falling of eroded EJ shroud Plate. 0 2 0

Total Outages - 2
Hrs. Lost : 45 Hrs.
Forced Outage : 0.64%
ANALYSIS OF OUTAGES

PAPH SUPPORT BEARING FAILURE


SUPPORT BEARING DESIGN:
Type: Kingsbury Size 41BV Series 450,
+SKF 23234 CCK/W33

REASON FOR FAILURE:


• Failure of Centre Bearing.
• Shifting of rotor
• Thrust pad failure.

ACTION TAKEN:
• Regular Analysis of Lube oil at R&D for PQ index
• Replacement of oil if PQ index found high
• Inspection of bearing at the earliest opportunity.
• Ensuring healthiness of Lube oil system.
• Skilled maintenance staff.
ANALYSIS OF OUTAGES

FAILURE OF AXIAL SEAL PLATE ADJUSTOR BOLTS

REASON FOR FAILURE:


• Failure of Adjuster Bolts.
• Adjuster Guide arrangement problem

ACTION TAKEN:
• Static seal on either sides.
• Locking of the axial seal Plates (temp).
• Inspect the locks at the available opportunity.
• Modify the axial seal plate design.
Guide

PAPH AXIAL SEAL PLATE


Guide

PAPH AXIAL SEAL PLATE


Guide

PAPH AXIAL SEAL PLATE


Guide at top & Bottom

MODIFIED AXIAL SEAL PLATE


MODIFIED AXIAL SEAL PLATE
ANALYSIS OF OUTAGES

FALLING OF ERODED BRACING PIPES

REASON FOR FAILURE:


• Flue gas erosion of bracing pipes.

ACTION TAKEN:
• Replacement of new bracing pipe
• Replacement of Gassette plates
• Angle protection to the bracing pipe.
• Angle protection to the water manifold.
• Removal of misc. bracing pipes/supports.
ANALYSIS OF OUTAGES

GEAR BOX FAILURE

REASON FOR FAILURE:


• High Speed shaft Bearing failure.

ACTION TAKEN:
• Regular servicing /inspection of the bearings
ANALYSIS OF OUTAGES

FALLING OF ERODED SHROUD PLATES

REASON FOR FAILURE:


• Flue gas erosion of shroud plate welding.
• Size of EJ : 8.5x3.4x 0.7 Mts

ACTION TAKEN:
• Full welding with Bolting of shroud plates
• Additional angle for protecting the welding.
• Full welding of shroud joints
• Removal of all patch welding plates.
• Replacement of damaged FG inlet duct.
EXPANSION JOINT SHROUD PLATE ARRANGEMENT

Angle Clits Angle

Full
Welding
+
Bolting

EXISTING PROPOSED
BEST PRACTICES :

1. Installation of oil carry over probe


2. Inspection ports view glass for CE.
3. Covering of Baskets inside the APH.
4. Motorised winch and hoists for basket removal
5. Steam cleaning & jet cleaning of baskets
6. Static seals on either sides of sector plate
7. Usage of flexi seals (radial & axial)
8. Supervision by Ex-BHEL
9. Regular monitoring of Guide & SB oil PQ index.
10. Sealing of guide bearing area & centre section
11. Repl. of worn out bracing pipes with angles.
12. Replacement of damaged ducts.
13. Use of wear plates in critical area in ducts.
CONSTRAINTS:

1. SPACE CONSTRAINT IN APHS IN ST-II UNITS.


2. POOR APPROACH FOR TRANSPORTATION OF
MATERIALS.
3. 100% BASKET JOB BEING DONE, TIME
AVAILABILITY OF CARRYING OUT CRITICAL
JOBS IS LESS.
4. GOOD VENDORS FOR SUPPLY OF SPARES
5. PROCUREMENT OF APH BASKETS
6. MAINTENANCE AGENCIES
OTHER ISSUES
1. CARBON STEEL ELEMENTS FOR COLD END
BASKETS

2. MODIFICATION OF HEATING ELEMENT PROFILE


3. USAGE OF SMALL HEIGHT BASKETS AT HOT
END
4. SUPPORT BEARING – CONVERSION FROM
BABBIT TO ANTIFRICTION BEARING.
APH BASKET SPECIFICATIONS

1. RAW MATERIAL SPECIFICATION & INSPECTION


2. NO. OF PAIRS OF ELEMENTS IN BASKET
3. WEIGHT OF BASKET WITH TOLERANCE
4. METHOD OF PRESSING OF BASKET WHILE ASSY
5. ELEMENT PROFILE UNIFORMITY
6. TESTING FACILITY LIKE HEAT RECOVERY &
PRESSURE DROP
7. MATERIAL FOR COVER SHEET OF CE
ELEMENTS
OIL CARRY OVER PROBE.
THANK YOU