Orientation On The Guidelines in The Conduct of The National School Building Inventory (NSBI) For SY 2022-2023
Orientation On The Guidelines in The Conduct of The National School Building Inventory (NSBI) For SY 2022-2023
These data that will be taken from this facility are crucial in
determining and allocating the necessary resources equitably to all
schools.
PROCEDURES
In order to collect, encode, and report accurate and high-quality data in the NSBI Module, personnel
at the school level shall observe the following:
*Should there be errors in the encoding of data in the system, the School Head shall notify the
S DO of any error/s committed through a letter addressed to the Division Planning Officer.
ROLES AND RESPONSIBILITIES
DepEd Central Office Responsible Office/s
Orient the Regional and Schools Division Offices on NSBI PS-EMISD, SIF-EFD, ICTS, AS-AMD
Type of Facilities/Amenities
Bike Racks
Pathway Cover/Roofing
Site Validation
Division Engineer, Planning Officer, Supply
Officer (plantilla)
Online Validation
School Level
Using smartphones/tablets:
1.) Turn on the GPS on your device.
2.) Open Google Maps.
3.) Input the name of the place in the Search bar. You may manually locate by clicking on
the specific location in the map, or by scrolling and zooming in and out on the map.
4.) Tap and hold to the specific location. A red pin will appear on the determined location.
5.) The coordinates will appear on the description page of the pinned location, then
copy or take a screenshot of the coordinates.
PROCESS IN DETERMINING THE SCHOOL COORDINATES
(LATITUDE/LONGITUDE)
Using laptops:
1.) Open your browser (Google Chrome, Mozilla Firefox, or any other browser).
2.) Type Google Maps in the Search bar.
3 .) Navigate the location y o u wan t to determine the coordinates . Us e the scroll
wheel to zoom in/out of the location.
4.) Right-click on the location.
5.) Click on the coordinates and copy it.
VALIDATION QUOTA
Paper/System and onsite validation of NSBI data shall be conducted by the Division
Planning Officers and Division Engineers.
Category/Size Criteria/Quota
* C u t -off d a t e to b e re p o rt ed i n th e N S B I is a s of 3 1 D e c e m b e r 2 0 2 2 .
MONITORING AND EVALUATION
The Policy, Planning, and Research Division (P P RD) through the Regional Planning
Officer ( R P O ) shall monitor the status of submission b y S D O . T h e S D O s shall d o the
same to all schools under their respective jurisdiction. Also, the Division Planning Officer
(DPO) and the Division Engineer shall provide necessary support in the form of technical
assistance to schools with difficulties in encoding NSBI data in the BEIS.