MBSA1133 Business Information System Activity 4 - Roadmap Design & DFD

The document outlines a 5-phase roadmap for developing and rolling out an OT and Claim System. Phase 1 involves identifying issues and collecting requirements. Phase 2 is UI and database design. Phase 3 is development and internal testing. Phase 4 is user acceptance testing. Phase 5 is system rollout, training, and going live with the new system deployed to production. A level 0 data flow diagram shows data flows between employees, the OT and Claim System, and HR, Finance, and HOD departments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views6 pages

MBSA1133 Business Information System Activity 4 - Roadmap Design & DFD

The document outlines a 5-phase roadmap for developing and rolling out an OT and Claim System. Phase 1 involves identifying issues and collecting requirements. Phase 2 is UI and database design. Phase 3 is development and internal testing. Phase 4 is user acceptance testing. Phase 5 is system rollout, training, and going live with the new system deployed to production. A level 0 data flow diagram shows data flows between employees, the OT and Claim System, and HR, Finance, and HOD departments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 6

MBSA 1133

Business Information System


Activity 4
Roadmap Design
Name Matric No

KOH REN CHIEN MBS211193


GAUTHAM RUHI RAJ MBS211234
PIONG MENG ZIAN MBS211233
Phase 5
(System Rollout & Training and Go Live)
OT and Claim System RoadMap - Deploy system to production environment.
- Provide training to users involved in the system.
- Start running the system.
- Get user to sign job completion form.

Phase 3 Phase 4
(Development) (User Acceptance Test)

- Develop system and do - Perform testing with user


internal testing. and get user to sign off the
UAT document.
Phase 1
(Identify Issue &
Collect Requirement)
- Identify the issues faced
by Aimflex’ employees.

- Collect requirements from


employees and get
functional spec sign off.

Phase 2
(UI and Database Design)
- Design Systems User
Interfaces and get
employees to sign off the
design document.
MBSA 1133
Business Information System
Activity 4
Data Flow Diagram

Name Matric No

KOH REN CHIEN MBS211193


GAUTHAM RUHI RAJ MBS211234
PIONG MENG ZIAN MBS211233
OT and Claims System
Level 0
HR
HOD
Department
OT and Claim OT and Claim
Approval Approval

Employee OT and Employee OT and


Claim Application Claim Application

OT and Claim
System

OT and Claim Apply OT


Approval and Claim

Employee OT and Payment


Finance Claim Application Details
Employees
Department
OT and Claims System
Level 1