Under this scheme Domestic type Biogas Plants in the range of capacity from 1
cum to 25 cum are taken up .
•Uses of Domestic type Biogas Plants.;-
•Cooking
•Biogas can be used in a specially designed burner for cooking. A biogas plant of
6 cum. capacity is sufficient for providing cooking fuel to a family of 10 to 12
members.
•Lighting:-
Gas lamps can be fueled by biogas. The requirement of gas for powering a 100
candle lamp (60 W) is 0.13 cum. per hour.
Pattern of Central Financial Assistance for 2020-21
Sr No. Particulars of Central Biogas Plants under NNBOMP (size 1 to 25 cubic metre biogas per day)
Financial Assistance (CFA)
A Central subsidy Rates 1 cubic Metre 2-6 Cubic 8-10 cubic 15 cubic metre 20-25 cubic
Applicable (in Rs. Per Metre metre metre
plant))
Objective:-
To promote Decentralized Renewable Energy Source (DRES) of power generation,
specifically in the small capacity range (3 Kw to 250 kw) and thermal energy for
heating/cooling from the biogas produced from Biogas Plants of 30 m3 to 2500 m3 size,
operated based on the availability of required quantity of biodegradable organic waste (s).
Procedure of implementation:-
The proposals of the project under the scheme is developed and prepared as per available
and proposed feeds stocks and requirement of power /thermal load/cooling load and its
handling management at the users end. The proposals are submitted by the designated
Programme implementing agencies (PIAs) of the scheme to the MNRE in the prescribed
format for a principal approval.
Central Financial Assistance (CFA)
Power generating capacity Biogas plant capacity (in cubic CFA/subsidy limited to the following ceiling or 35% of the
(Kw) metre) project cost whichever is less
Power Generation Thermal application
3-20 Kw Rs. 35,000/- (Rupees Thirty five Rs. 17,500/- (Rupees Seventeen
30 m3 thousand only )per kw thousand five hundred only)per
To Kw eq thermal/cooling
200 m3
>20 kw up to 100 kw Biogas plants of above 200 cu. Rs. 30,000/- (Rupees Thirty Rs. 15,000/- (Rupees fifteen
Metre size or any combination thousand only) per kw thousand only )per Kw eq
of above plants or approved thermal/cooling
alternate matching
capacity/design
>100 kw up to 250 kw 1000 cu metre biogas plant of Rs. 25,000/-(Rupees Twenty five Rs. 12,500/-(Rupees twenty
single digester or combination thousand) per Kw thousand five hundred only) per
of above plants or approved kw eq thermal /cooling
alternate matching
capacity/design
Waste to Energy/CBG Programme
Rs. 10 crore/project
Procedure of implementation
New National Biogas and Organic Manure Programme Biogas Power Generation(Off-grid) Thermal application
Programme (BPGTP)
Compressed Bio Gas Project Village handiaya, Power/CBG Project at Haibowal Dairy Complex,
Distt Barnala Ludhiana