PQM Presentation - Case Study On Project Quality Management Techniques in Automobile Industry Case Study
PQM Presentation - Case Study On Project Quality Management Techniques in Automobile Industry Case Study
PQM Presentation - Case Study On Project Quality Management Techniques in Automobile Industry Case Study
Assurance
PMP
Planning Control
The purpose of gate audit is to ensure that all activities of the project are in line
with the early planning requirements, to ensure that the project quality meet the
quality planning scheduled and is under control.
10
12
13
15
MS Project Management 19
Case - Problem and Solution (Welding
Problem)
Context – Implementation of a new world class advanced technology for
welding
Problem – Welding process causing deformation of hardened plastic parts
Quality Planning and PFMEA suggested to use
Solution – SPC (frequent continuous sampling) to view real-time deviations
with 3 sigma benchmark
Solution – Adjustments and optimization of robot welding parameters, small
air pump to provide stable pressure, regular replacement of electrode A and
B, etc.
SPC was also used for body paint thickness, color difference, and assembly
gap)
MS Project Management 20
Case Analysis
Quality management of the new c-class car development project:
Quality Assurance Of New C-class Car Project (Gate Audit):
The quality assurance of Beijing Benz V205 new car model development
project was done through fate audit approach and was the “process quality
audit based on project process”.
Examined and verified whether deliverable achievements of early stage of the
project had been completed.
It was a necessary routine work at end of each phase of the project life cycle.
Beijing Benz formulated evaluation criterions to indicate the severity of
different problems/ The overall score of each gate should get above 80 points
can through the audit.
The audit problems and the solutions of (or potential measures) and output
must be recorded.
The project team tracked the problem until be solved and the problem was
closed with confirmation in the next gate audit. 21
23
25
MS Project Management 26