ABT Improvement Project V2

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 10

ABBOTTABAD IMPROVEMENT PLAN

JAZZ NPM - NORTH 2022-10-03


Content
Summary of Audits / Activities KPIs overview
1 Basic audits checks and optimization PIPs 2 2G/3G/4G KPIs of ABT City overview

Field Optimization Sector Swap – Cases


3 Field testing pictorial overview and on field 4 Sector swaps / Ops issues
optimization
Summary of Audits / Activities
Category Tasks City ABT Remarks Week 37 Week 38 Week 39 Week 40 Week 41

CSFB Audit/ Flash CSFB/RIM - CSFB Main parameter ABT WO raised for implementation     WO raised /    
audits Pending at L2 end
TRX/CPICH/RS Power settings and audits for all RATs ABT Planned       Planned  
Paging audits - checks for high PPS LACs and discards ABT In Progress     In Progress Paging Discrards cases will be  
raised
Very Early Assignment audit and implementation - CST Discrepencies WO will be
Improvement ABT In Progress     In Progress raised  

No RACH
Accessibility RACH audit - To improve the RRC SR ABT No RACH parametric discrepancy observed. parametric        
discrepancy
observed.
Tilt Audit (extremely high and low tilts, high tilts
mismatch between technologies.  mismatch between ABT Planned       Planned  
DCS and 900 tils)
4G/2G site tac/LAC mapping to be checked (Should be
no Island) ABT Planned       Planned  
CST Time Improvement - To check for parametric audits/ ABT Planned       Planned in Week 40  
changes
Sector Addition Cases and New Sites Recommendations
- To check on basis of coverage/ load/ complaints if new ABT In Progress          
sectors required

Coverage Bad event Analysis/ Sector swap Coverage patches


Improvement cases/Coverage/Throughput patches are Sector swap cases Bad event are identified and Throughput patches/Field
Pre Detailed DT ABT identified & recommendations will be added identified and Analysis in recommendations optimization will be done with  
against each patch in report. Field raised with OAN progress are added against recommended actions/ Audit
optimization will be done with recommended each patch in of logical sites.
actions/ Audit of logical sites. report

Total 321
HO Forbid Relations Audit - Ensure logical relations NOT ABT Total 321 relations rectified. WO raised for   relations   WO will be raised for 2nd  
in forbid 2nd phase implementation (WO 571622) rectified and phase implementation
Mobility implemented
Major city neighbor audit from the Mentor and Working Done | WO to be
implement missing neighbors < 1km ABT Total 237 relations to be added.       raised  
Summary of Audits / Activities Week
Category Tasks ABT Remarks Week 37 Week 38 Week 39 Week 40
41
Carrier Aggregation Check Discrepancies shared for 27 cases.       WO to be raised  

Sector Swap cases identified on total 2 sites .Issue has Sector Swap cases identified on 2 Sector swap DT Verification done,
been raised with OAN team for rectification, multiple sites ABT0286/ABT1709 , Issue has removed by OAN Sector swap removed on JV Planned again for
To identify sector swaps activities has been done . been raised with OAN team for || DT Verification 1 site ABT0286 while still swap removal on  
rectification, planned persist on ABT1709 ABT1709

LTE Switches Audit - Main Throughput/ User Experience WO raised, Implementation on


enhancement switches audit Implementation on Hold hold        

IOI found on total 3 sites


Identified & Escalated High interference cases for all ABT0286/ABT1709/ABT0681 . 2 out of 3 external Fresh working will
Escalate high interference cases RATs.  Frequency clashes have been cases are raised on   be shared  
checked on top worst cases. WO portal
raised for Frequency retuning
External Nbr Def - To check for Intra-Inter RAT External 63 2G External cell relations for ABT sites Discrepancies     WO raised / Pending at    
Definition removed L2 end
Inter RAT Co-located / Zero Neighbor Audit - Ensure
colocated cells addition with Blind HO priority set to 3 Done     Done    
LTE Co-located IRAT Audit (Blind HO Priority for CSFB) Discrepancies removed on 94 cells.     Done    
ABT City sites BW capping issue Raised to concerned team to increase BW on 4 sites.     Done    
Retainability
3414 collocated relations verified. No discrepancy
LTE Co-located/ Zero Neighbor Audit (Intra-Inter Freq) observed. Done        
SRVCC taking place on 48 cells. Further changes as per First Batch of 28 Cells raised and 2nd Batch raised and Further batches
VoLTE & SRVCC parameter/Switches audit/Zero SRVCC test case raised implemented   implemented planned  

alarm identified on
Alarms Identified & escalated multiple Alarms   total 2 sites with   Fresh working will  
high aging || TT be shared
raised

Detailed working done Working will be


for HOSR Improvement/ done for other
Longer Trends Degradations of KPIs (Analysis/Escalations) In Progress     Top WCL identified and Major Contractual  
raised for HC KPIs.

TT raised for Top 4 sites


2G TRX Level hardware issues escalation - Escalate HW HW issues Identified & Escalated with OAN || TT Raised (ABT0681/ABT1869/ABT3979/ABT7 Fresh
    working/Reminder  
issues 004) for detailed HC. will be shared

L2100 RET Mapping working 28 cells, L2100 coverage mapped to L1800 to alleviate Done        
loading.
MLB Audit - Parametric Audit No major discrepancy observed.   Done      
ABT City 2G/3G/LTE Dec-21 vs Sept -22
Comparison
ABT City ABT City ABT City
2G KPIs Dec '21 Sept '22 LTE KPIs Dec '21 Sept '22 3G Dec '21 Sept '22
CS Traffic 31742.1 31417.04 ERAB Setup SR 99.63 99.43 CS Traffic @ BI 10425.55 10647.58
PS Traffic (GB) 71.7 47.85 PS DCR 0.18 0.18 PS Traffic @ BI GB 3187.84 2984.85
HoSR 97.54 97.36 HHO SR (intra) 99.21 99.11
DCR 0.89 1.22 DL Avg USER Throughput 2.83 2.84
TCH Blocking 0.005 0.01 Latency 514.34 114.55
SDDCH Blocking 0.002 0.01 ENPM_Inter_Freq_OHOSR_ 98.85 99.11
CSSR 99.64 99.49 Data Vol GB 35901.50 42213.15
KPI Improvement
SRVCC enabled on Problematic Cells

Working in Progress to Improve HOSR/Call Efficiency


ABT LTE External Cell Audit
Audit conducted for LTE ABT External cells. (LTE/UTRAN/GERAN). Audit conducted for LTE Co-Site Intra & Inter Frequency NBRs.
Most of the definitions are as per standard with few discrepancies No discrepancy observed with all co site NBRs added currently in
observed for 2G as below. both Intra & Inter Frequency scenario.

4G >4G  :: MO :: EUTRANExternalCell Discrepancies Count Check Count


PCI 0 Co Site Intra Freq NBRs Required 1062
EARFCN 0 Co Site Intra Freq NBRs Added 1062
TAC 0 Discrepancy 0
4G >2G  :: MO :: GERANExternalCell Discrepancies Count Co Site Intra Freq NBRs Required 2352
RAC 0 Co Site Intra Freq NBRs Added 2352
LAC 16 Discrepancy 0
BCCH ARFCN 15
NCC 13
BCC 16
4G >3G  :: MO :: UTRANExternalCell Discrepancies Count
Downlink UARFCN 0
RAC 0
PSC 0
LAC 0
BW Capping
BW Capping observed on following sites only in ABT city.

*eNodeB Name Site ID


LTE_ABT1159__S_Jhugiaan ABT1159
LTE_ABT1451__S_Narian ABT1451
LTE_ABT2587__S_JamiaGhousia ABT2587
Field Optimization
• Majorly coverage holes / Gaps  are observed due to high inter site  distance .
• Sector Swap is observed on 2 sites & raised with operations.
• Coverage patches are identified and recommendations are added against each patch in detailed report.
• There is some issue in Data throughput some script issue showing variation in results (Verification in
progress)
• Field optimization will be done with recommended actions.
Sector Swap Cases – Abbottabad
Sector Swap is observed on ABT0286/ABT1709 , Issue was raised with OAN team for rectification multiple activities has been done . Swap removed
on 1 out of total 2 sites. Joint visit is planned with Ops team for on spot rectification

City SITE ID Sector Technology TT ID Status


Abbottabad ABT0286__H_MuqaddasPlaza 1&3 2G/3G/L18 TT # 238616 Raised and resolved
Abbottabad ABT1709__S_Abottabad1N 1&2 2G TT # 239,150 As per OAN, it is resolved. But issue still persist JV planned

PRE POS