CSFB Audit/ Flash CSFB/RIM - CSFB Main parameter ABT WO raised for implementation WO raised /
audits Pending at L2 end
TRX/CPICH/RS Power settings and audits for all RATs ABT Planned Planned
Paging audits - checks for high PPS LACs and discards ABT In Progress In Progress Paging Discrards cases will be
raised
Very Early Assignment audit and implementation - CST Discrepencies WO will be
Improvement ABT In Progress In Progress raised
No RACH
Accessibility RACH audit - To improve the RRC SR ABT No RACH parametric discrepancy observed. parametric
discrepancy
observed.
Tilt Audit (extremely high and low tilts, high tilts
mismatch between technologies. mismatch between ABT Planned Planned
DCS and 900 tils)
4G/2G site tac/LAC mapping to be checked (Should be
no Island) ABT Planned Planned
CST Time Improvement - To check for parametric audits/ ABT Planned Planned in Week 40
changes
Sector Addition Cases and New Sites Recommendations
- To check on basis of coverage/ load/ complaints if new ABT In Progress
sectors required
Total 321
HO Forbid Relations Audit - Ensure logical relations NOT ABT Total 321 relations rectified. WO raised for relations WO will be raised for 2nd
in forbid 2nd phase implementation (WO 571622) rectified and phase implementation
Mobility implemented
Major city neighbor audit from the Mentor and Working Done | WO to be
implement missing neighbors < 1km ABT Total 237 relations to be added. raised
Summary of Audits / Activities Week
Category Tasks ABT Remarks Week 37 Week 38 Week 39 Week 40
41
Carrier Aggregation Check Discrepancies shared for 27 cases. WO to be raised
Sector Swap cases identified on total 2 sites .Issue has Sector Swap cases identified on 2 Sector swap DT Verification done,
been raised with OAN team for rectification, multiple sites ABT0286/ABT1709 , Issue has removed by OAN Sector swap removed on JV Planned again for
To identify sector swaps activities has been done . been raised with OAN team for || DT Verification 1 site ABT0286 while still swap removal on
rectification, planned persist on ABT1709 ABT1709
alarm identified on
Alarms Identified & escalated multiple Alarms total 2 sites with Fresh working will
high aging || TT be shared
raised
L2100 RET Mapping working 28 cells, L2100 coverage mapped to L1800 to alleviate Done
loading.
MLB Audit - Parametric Audit No major discrepancy observed. Done
ABT City 2G/3G/LTE Dec-21 vs Sept -22
Comparison
ABT City ABT City ABT City
2G KPIs Dec '21 Sept '22 LTE KPIs Dec '21 Sept '22 3G Dec '21 Sept '22
CS Traffic 31742.1 31417.04 ERAB Setup SR 99.63 99.43 CS Traffic @ BI 10425.55 10647.58
PS Traffic (GB) 71.7 47.85 PS DCR 0.18 0.18 PS Traffic @ BI GB 3187.84 2984.85
HoSR 97.54 97.36 HHO SR (intra) 99.21 99.11
DCR 0.89 1.22 DL Avg USER Throughput 2.83 2.84
TCH Blocking 0.005 0.01 Latency 514.34 114.55
SDDCH Blocking 0.002 0.01 ENPM_Inter_Freq_OHOSR_ 98.85 99.11
CSSR 99.64 99.49 Data Vol GB 35901.50 42213.15
KPI Improvement
SRVCC enabled on Problematic Cells
PRE POS
T