Substation Flow Chart 2

This document provides a summary of scope items for a joint venture between Taisei and DMCI for the North-South Commuter Railway Project CP01. The project involves construction of elevated structures and stations along the NSCR and PNR ROWs. The summary lists 22 scope items for the project, including bored piling works, box girder erection, land acquisition, excavation, retaining walls, drainage, building columns and slabs, plastering, doors and windows, and other civil and building works.

Uploaded by

ftma borja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views1 page

Substation Flow Chart 2

This document provides a summary of scope items for a joint venture between Taisei and DMCI for the North-South Commuter Railway Project CP01. The project involves construction of elevated structures and stations along the NSCR and PNR ROWs. The summary lists 22 scope items for the project, including bored piling works, box girder erection, land acquisition, excavation, retaining walls, drainage, building columns and slabs, plastering, doors and windows, and other civil and building works.

Uploaded by

ftma borja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TAISEI-DMCI JOINT VENTURE

North-South Commuter Railway Project CP01


PNR ROW

Elevated Structures 6 Stations, 5 MTS and DEPOT


ITEM SEQUENCE SCOPE REMARKS
1 Bored Piling Works Building ( Trevi)
2 Box Girder Erection Civil (Vsl)
3 NSCR ROW
3 Land Acquisition Building (Trevi)

NSCR ROW
4 Adjust Temporary Fence
16 2
5 Excavation ( Retaining Wall Footing)
16 6 Backfi ll 1st Layer
7 Retaining Wall
1
0 8 Mainline Drainage & Manhole
1
9 Backfi ll 2nd Layer
1 1 1
10 Built-up Column
1 14 1
11 Backfi ll 3rd Layer
1 1
1 1 1 Pile Cap,Tie Beam, Duck Bank, Small
1 12
13 catch Basin,Septic Tank
1
1 1 13 Backfi ll 4th Layer
12
14 SOG
5
15 Columns
7
16 Roof Beam,Roof Slab,Parapet Wall,Canopy
8 17 CHB including stiffener column & beam
4
18 Plastering
9 11 19 Cinder concrete
10 20 Door & Windows and mortar around it.
1
5 21
4

NSCR ROW
22
NSCR ROW
PNR ROW