0% found this document useful (0 votes)
211 views25 pages

Configuration EISU100V2

This document provides instructions for configuring an EISU100V2 device. It outlines setting the laptop and EISU IP addresses, running configuration software to modify server settings, configuring the network, VLANs, and sensor channels on the EISU. Specific steps are given for adding temperature, humidity, infrared and current sensors, as well as downloading protocols for intelligent devices like rectifiers and power meters. Port and channel configurations are also specified.

Uploaded by

faisl almgrbye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
211 views25 pages

Configuration EISU100V2

This document provides instructions for configuring an EISU100V2 device. It outlines setting the laptop and EISU IP addresses, running configuration software to modify server settings, configuring the network, VLANs, and sensor channels on the EISU. Specific steps are given for adding temperature, humidity, infrared and current sensors, as well as downloading protocols for intelligent devices like rectifiers and power meters. Port and channel configurations are also specified.

Uploaded by

faisl almgrbye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 25

PO3 Project

• ZNV
Configuration for EISU100V2
1. Laptop IP address setting

* EISU100V2 default IP address is


192.168.0.88

* so laptop IP &Subnet mask should


be:

IP:192.168.0.200
Subnet:255.255.255.0
2. Running EISUConfig

1. Double click the software


2. After open the software follow
this points:
1. click the button of “Scan Sever
IP”, EISU IP should be appeared in
the list.
2. Double click the EISU IP , server
IP address will be modified .
3. Type the password “11111111”
4. Login
CN_ZXM10-EISUConfigiTower-V1.11.004-20181228.zip

Note : If you use Window 10, this software does not support
this version
3. Network Configuration

Get the IP list for PO3 project team :

1. Set IP address according to the IP list


2. Set subnet mask
3. Set gateway
4. Set EISU time
5. Set Para
4. VLAN Information Configuration

Need to get the VLAN ID(each site has the


different VLAN ID)

1. Read VLAN

2. port property :
LAN1 ---- TRUNK
LAN3 --- ACCESS -- VLAN ID is xxxx , Tag is xxxx
CPU --- ACCESS -- VLAN ID is xxxx , Tag is xxxx :Attention
Avoid to fail , before setting VLAN , confirm .1
the VLAN information is correct
3. Set VLAN. After finishing the IP address , set VLAN .2
information
:Warning
The incorrect configuration may cause
.EISU100V2 access fault
5. Sensor Channel Configuration

For the configuration channel following picture:


Environment device
Add Temperature and Humidity .1
Add infrared sensor .2
Add A/C current sensor .3
Intelligent device
Rectifier(ZXDU68) Protocol downloading .1
Powermeter (DTSD3366) Protocol Downloading .2
IIC Infrared Information Controller Protocol Downloading .3
Battery Group Monitoring Unit (HVBMU-1) Protocol Downloading .4
Li Battery(ZXDC48 FB) Protocol Downloading .5
Protocol Downloading)DTH( .6
After finish add protocols and channels checking data •

Channel Data checking .1 •


Rec (ZXDU68) data checking .2
Power (DTSD3366)Data checking .3
: Channel Resource

Outdoor:Intelligent
device:Rectifier :COM2Powermeter:COM4Envirement :
Smoke 103Temperature 3Humidity 4Indoor site:Intelligent
device:Rectifier :COM2Powermeter:COM4IIC:COM6Envirement
: Door 101Smoke 103water 105A/C current1# 1A/C
current2# 2Temperature 3Humidity 4Infrared 7DG running
status 110DG start voltage 5
: EISUConfig COM & Channel relationship *

:Indoor site
:Intelligent device
Rectifier :COM2
:Outdoor Powermeter:COM4
:Intelligent device IIC:COM6
Rectifier :COM2
Powermeter:COM4 :Environment
Door 101
:Environment Smoke 103
Smoke 103 water 105
Temperature 3 A/C current1# 1
Humidity 4 A/C current2# 2
Temperature 3
Humidity 4
Infrared 7
DG running status 110
DG start voltage 5
Thanks !

Eng. Mohammed Kabar

You might also like