Shear wall
• It is constructed by steel bar and concrete;
• most of the time shear wall constructed surrounding the building to
protect shear force that comes from the besides load.
• Shear wall is a reinforced concrete structure that is designed when
there is basement floor.
Purpose of shear wall:
To resist lateral earth pressure, wind pressure/weathering and earth
quake.
It also used as column bracing member to decrease
slenderness/sway-ness of frame and,
To resist ground moisture, to resist passage of heat &sound.
Freedom from maintenance & durable.
Hollow concert block work
For our site HCB was manufactured out of the site for external and
internal wall construction. The size of blocks used on our site:
HCB with dimension 40cm*20cm*20cm used for external walls
and external walls.
HCB with dimension 40cm*20cmm*15cm used for partition.
HCB with dimension 40cm*20cm*10cm was used for toilets.
Formwork
Formwork is a temporary structure that is required to support and
form concrete members.
Requirements of formworks:
Strong enough to support dead and live loads.
Rigid enough to restrain movement.
Tight joints to avoid leaking.
Easy for sequential removal.
Cheap and available material and re-usable.
Material Used For Construction
In order to execute the construction of building they are used
different construction materials; including Cement, Sand ,Aggregates,
& Steel.
Measuring The Ingredients Of Concrete
1, Measure by weight
2, Measure by volume
The amount of both fine and coarse aggregate could be measured in
two ways.
1, Measure by weight
This is a method where a beam balance or scale balance is used to
measure and adjust the right quantity (in grams, kilograms…) of sand
and aggregate.
For a mix ratio by volume of 1:2:3 (1 cement, 2 sand & 3 aggregate)
the ratio could be converted in to weight as follows.
1 bag/sack of cement weighs 50Kg
Therefore the sand should weigh 2*50Kg = 100Kg and
The aggregate should weigh 3*50Kg = 150Kg.
Measure by Volume
This method is highly practiced in the site where I practiced in.
• 40cmx50cmx13cm— struck volume is used when it is desire to
achieve C-35 concrete
• 40cmx50cmx16cm— struck volume is used when it is desire to
achieve C-30 concrete
• 40cmx50cmx18cm— struck volume is used when it is desire to
achieve C-25 concrete
• 40cmx50cmx20cm—struck volume is used when it is desire to
achieve C-20 concrete
Overall Internship Benefits And Experiences.
The overall benefit and experience of this internship
program is:
Improving my Practical Skills
Upgrading Interpersonal communication skills
Upgrading my Theoretical Knowledge
Improving My Team work Skills
Improving My Leader ship Skills and management
Conclusion
The Curriculum used for higher education system has new
features that involve practical and theoretical courses and the
internship semester in fifth first semester.
The main objective of the internship program is to enable the
intern to experience the practical activities carried out on site
(working environment) and correlate it with the theoretical
background gained through learning in four years class time.
Other objectives include if problems exist to identify its cause
and take engineering measures to solve it, to get accustomed to
the working environment, to be governed by the rule and
regulation of the employer, to be more of team worker.
Recommendation for the Company
• The company workers should have responsible to help the intern
students; to help them.
• The company should have improve pays in order to satisfactory
payment for its employer.
• They should have organize their construction material in good
condition. Sometimes they place formworks and metal scaffolding
in inappropriate area.
Recommendation for the University
• Preparing on timely format of internship as much as possible.
• Receive money for students immediately us they release the
campus.
• It is better to give field trip before the internship program.
• Inform for the students their advisor before they release the
campus.
THANK YOU