LNG Easy Pvt. LTD: Pioneers of Small Scale LNG Distribution Through Virtual Pipeline

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 49

LNG Easy Pvt.

Ltd
Pioneers of Small Scale LNG Distribution
through Virtual Pipeline

PetroChina

International
Gas Shortage Situation in Pakistan
An Overview

• Gas accounts for more than half of Pakistan’s total energy


consumption. Gas Consumption 9.8 million consumers
• IPP’s are consuming 38% - General industry 9% - Captive
power 8%

• Pipeline Capacity is Limited to 1200 mmcfd

• North-South Pipeline will take 3 Years to build

• The shortfall will reach 4,800 mmcfd by FY2028


• Changing the source fuel for Captive Power or Going for load
enhancement from DISCOS is not only very time consuming but also
requires investment in terms of infrastructure, equipment and pre-
payments.
LNG Easy Pte. Ltd Singapore
• LNG Easy World’s First Plug & Play LNG Mobile Filling Platform MFP or Floating Jetty.

• LNG will be directly Transferred from SSLNG ships of 15,000 to 30,000 CBM to Cryogenic
ISO tanks.

• Subsequently ISO tanks will be transported to the destination by Rail & Road.

• LNG Easy provides End to End Turnkey LNG Solutions


MIDSTREAM
•LNG Easy already has Supply Sales & Purchase Agreements of over 1.5
Million Tons with World Renowned LNG Giants

Trafigura Pte Ltd Petronas LNG Ltd. Petro China Shell LNG
(Middle East) International

450,000 Tons 370,000 Tons 260,000 Tons 1 Million Tons


MOU
with
Petro
China
Term Sheet for 260,000 Tons per Annum the Sale &
Purchase of LNG from Petro China
Master Sale & Purchase Agreement of
from Petronas LNG Ltd
Master Sale &
Purchase
Agreement
from Trafigura
Pte Ltd
MIDSTREAM
LNG Easy through its Proprietary Mobile Filling Terminal is
Operational in Myanmar, Bangladesh, Vietnam and China having
Capacity of 1.2 Million Tons
• LNG Easy’s Proprietary Mobile Filling Platform (offshore Jetty)
supplying 50 MMCF/Day of Gas to 750 Megawatt Power Plant for V-
Tech Power in Thanlyin, Myanmar. The cargo is discharged through
STS transfers
LNG Easy Bangla Ltd Bangladesh

LNG Easy Bangla


Ltd
• Is a J/V between Bhola Eco Economic Zone and
LNG Easy Pte Ltd of Singapore.
• It will bring LNG into Bangladesh using unique MFP
floating jetty which we already establish in Myanmar.

Private & Confidential


www.lngeasy.com 2
LNG Easy World’s First Plug & Play LNG Mobile Filling
Platform MFP or Floating Jetty.
Karachi Port Operations
Downstream
Transportation of LNG in LNG Easy’s
owned Cryogenic ISO Tanks
Stacking of ISO Tanks
ISO Tanks Movement in Pakistan
LNG being Transported on Road in Malaysia
LNG Easy Pte. Ltd Singapore
LNG being Transported on ISO tanks at Malaysia, Singapore border

LNG Easy Pte. Ltd Singapore


PetroChina
Our Upstream & Downstream International
Partner
Middle East

Our Transport Partners


• Our Logistics Partner is
already engaged in freight of
POL Products Strictly
adhering to Safety
Standards prescribed by
Authorities
MOU

LNG Easy Pvt. Ltd


To provide the sa
most re
LNG EASY INTEGRATED TURNKEY LNG
SOLUTIONS FOR OFFGRID AND/OR PIPELINE
CUSTOMERS
• HOUSING

• OFF GRID INDUSTRIES

• DEVELOPMENT OF HOUSING SOCIETIES AT OFFGRID


LOCATIONS

• INDUSTRIAL CAPTIVE POWER UNITS FACING PRESSURE


ISSUES

• BACKUP FOR PIPELINE SHORTAGES


Regasification skid
• Capacity: typically 200 m3/hr,
350, and 800-1500m3/hrs.

• Each Regas station can provide


the requisite pressure of Natural
Gas for Industries, weather be it
Captive Power, Boilers or
Furnaces

Private & Confidential

Makers: BTCE, Furui, HQHOP, Zhonghe, CYY


Storage &
Regasification skid
• Each Regas station can serve
a small community

Private & Confidential


Pipeline Small scale regas or LNG cylinders

Laying of Gas grid connecting


clusters of residents
Private & Confidential

For village’s consumption


LNG EASY DOWNSTREAM SOLUTIONS
Mini Grid Solution for Off Grid Domestic Customers
Rega
s(3) fillthe
Once cargo is delivered, it will be: (1) regased and inject into mini-grid; (2) put into storage tanks;
into smaller cylinders.

Private & Confidential


Gas
pipeline
After regas, it goes to the pipeline.

Private & Confidential

7
Refilling Station Small Cylinders

The LNG cylinders come in 995L, 475L, 275L, 200L, 180L, 160L and 98L.

Private & Confidential


Large Housing Complex
Residential Area

Mini-grid
inside Pressure regulation

residential
compounds

Pipeline
Water heating
Private & Confidential
LNG EASY INTEGRATED INDUSTRIAL
SOLUTIONS
Industrial Unit Captive Power
200-400 cubic maters / hour
Integrated Gasification Skid

500-650 cubic maters / hour


Integrated Gasification Skid
HOUSING SKID MOUNTED MOBILE PLUG N PLAY SOLUTION
An Overview of the Quality of Piped Gas
compared to Pure LNG without Pollutants
CURRENT GAS PRICES

S. No User / Slab Rs. / MMBTU USD $ / MMBTU

1 RLNG AVERAGE PRICE 2019 1621 10.15


RLNG AVERAGE PRICE 2020 1405 8.80
2
In 2019 The Prices were Depressed due to Pandamic

RLNG PRICE FEBRUARY 2021 1520 9.52

3 Expected to Increase to 2019 Level and Above


As it was Witnessed in November/December 2020 LNG Price being quoted
to Government of Pakistan for LNG Tenders by LNG Prodicers and Traders

LNG EASY PRICES ARE COMPETITIVE TO THE AVERAGE PRICE OF RLNG


BEING SUPPLIED BY THE GOVERNMENT
4 Offering 2 Years Fixed Contracts Leading to 5 year contracts with
competitive rates tied to Brent

INDUSTRIAL CAPTIVE POWER UNITS


Price in Rs. per mmbtu Cost of Electricity from
RLNG 1520 Rs. 12.10 per unit
LESCO Industrial Tarriff Rs. 15.46 per unit
on Incremental
New Incnetive Scheme by Govt. Rs. 12.96 per unit
Load
Way Forward

• KINDLY SUBMIT EOI BY 19TH FEBRUARY