2
Legal Bases
Section 70 of EPIRA
“NPC shall perform the missionary electrification function through
the Small Power Utilities Group and shall be responsible for
providing power generation and its associated power delivery
systems in areas that are not connected to the transmission
system”
Chapter IV of the Republic Act No. 9513 or Renewable
Energy Act of 2008
“Off-Grid Renewable Energy Development”
DOE Department Circular No. DC2018-08-0024
“Promulgating the Rules and Guidelines Governing the
Establishment of the Renewable Portfolio Standards for Off-Grid
Areas”
DOE Department Circular No. 2019-01-0001
“Prescribing the Omnibus Guidelines on Enhancing Off-Grid
Power Development and Operation”
3
I. NPC Priority Strategic Initiatives 2022-2026
Strategic Direction #1: Expand energy access
• Achieve
100% Electrification of targeted/identified un-electrified households in all missionary areas
• Provide sufficient power supply in Missionary Areas (Capacity Additions, RE Hybridization Proje
cts, Distribution Systems, Transmission Lines, and Substations)
• Support privatization efforts in the missionary areas
• Optimize disposal or divestment of SPUG assets upon entry of Private Sector
• Ensure Adequate Fund Sources for Sustainability and Improve Corporate Liquidity
• Rationalize tariffs and phase out of UC-ME subsidy in Missionary Areas
4
II. Update on Total Electrification
in Missionary Areas
STATUS OF HOUSEHOLD ELECTRIFICATION
IN MISSIONARY AREAS BASED ON 2015 CENSUS TOTAL NO. OF TARGET HOUSEHOLDS FOR ELECTRIFICATION
= 1,515,836 HHs (BASED ON 2015 CENSUS)
UN-
SERVED,
27%
UNSERVED HOUSEHOLDS
IN MISSIONARY AREAS
MI LU
SERVE ND ZO
D AN N
73% AO
47
51 %
%
QTP
NPP/DU 1.20% NPC (Mini-Grid)
13.01% 0.67%
NPC with
DU
36.74%
Gridable* Non-Gridable
No Program yet Particulars NPC's Ongoing 2022 New Capacity No Program yet
Particulars NPC's Ongoing 2022 New Capacity Sufficient Capacity/For
(Required Total Total
Projects Addition/New Area interconnection/QTP Projects Addition/New Area (Required Capacity)
Capacity)
NPC with DU, HHs 48,311 29,681 129,613 22,672 230,277 NPC with DU, HHs 10,036 6,970 39,371 56,377
Capacity, kW 14,650 8,460 4,500 27,610 Capacity, kW 1,270 880 8,500 10,650
Percentage, % 20.98% 12.89% 56.29% 9.85% 100% Percentage, % 17.80% 12.36% 69.84% 100.00%
*Subject to validation by the electric cooperatives if feasible for grid extension.
7
III. Missionary Electrification at a Glance
POWER GENERATION
DEPENDABLE ENERGY SALES (MWh)
REGION PLANTS AREAS
CAPACITY (MW) FY 2020
Luzon 90 83 308.2920 1,111,996.2401 Batanes
NPC-SPUG Plants 72 70 97.5280 203,443.3246
NPP/QTP/RE Developer 18 13 210.7640 908,552.9156 Cagayan
Apayao
Visayas 56 52 30.1840 110,936.2397
Kalinga Isabela
NPC-SPUG Plants 53 49 17.7200 38,790.8694
NPP/QTP/RE Developer 3 3 12.4640 72,145.3703
Mindanao 29 26 58.2310 214,693.3746 Aurora
Total Dependable
Operating Hours Total Plants Total Areas Total HHs
Capacity, MW Batanes
Antique
Iloilo
Cebu Leyte
Palawan
Bohol
Siqujor
Sultan Davao
Basilan Kudarat Del Norte
Sulu Davao
Tawi-Tawi Del Sur
Notes: a – Includes 16 Projects (4.55MW) as replacement to the 2x5MW Power Barges Resiliency Program. Updates of 2021-2025 MEP
b – (7 out of 11 areas for FY 2023) Solar PV capacities are indicative only subject to site investigation. 10
c - New projects for 2022 are expected to be completed by CY 2023.
IV. 2022-2026 Missionary Electrification
Plan PARTICULARS 2022 2023 2024 2025 2026
I. Net Utility Revenue, Php Mn 2,723.63 2,920.96 3,187.02 3,162.40 3,495.59
J. UCME Requirements, Php Mn (OPEX) 18,656.34 18,778.55 19,690.92 19,957.70 20,826.85
a. NPC 8,432.53 7,894.79 8,339.34 8,147.49 8,588.67
b. NPP/QTP 10,223.81 10,883.76 11,351.58 11,810.21 12,238.18
K. NG and ICG Subsidy, Php Mn (CAPEX) 3,171.85* 3,783.44 4,910.17 5,306.45 1,493.54
NG ICG NG NG NG NG
Sub-total 1,273.43 1,898.42 3,783.44 4,910.17 5,306.45 1,493.54
a. Generation 1,273.43 679.53 2,210.67 2,262.01 2,252.45 907.54
1. SPUG Areas 385.52 368.56 869.00 1,226.00 775.00 67.00
i. New Projects 343.18 47.63 869.00 1,226.00 775.00 67.00
ii. Spill-Over 42.34 320.93
2. New Areas (Mini-Grid) 708.38 218.34 670.05 208.00 712.00 150.00
i. New Projects 481.20 82.30 670.05 208.00 712.00 150.00
ii. Spill-Over 227.18 136.04
3. Renewable Energy 179.53 92.63 671.62 828.01 765.45 690.54
i. Diesel-Solar Hybridization 179.53 71.46 522.53 828.01 765.45 690.54
ii. PV Mainstreaming (New Areas) 21.17 149.09
b. Transmission/Substation/Distribution Lines 613.06 1,572.77 2,648.16 3,054.00 586.00
1. 69KV Transmission Line Projects/
470.53 1,206.77.00 1,395.00 2,054.00 387.00
Distribution Lines
2. Substation Projects 142.53 366.00 1,253.16 1,000.00 199.00
c. Others 605.83
*Under 2021 and 2022 Budget. The rest are indicative only.
11
IV. 2022-2026 Missionary Electrification
Plan
Approved Projects under DOE’s TEP-1 CY 2021
Target No. of Project Cost
Project Coverage (Php)
Households
1.
993 ₱ 31,776,000.00
Solar Home System (SHS)/Photo-
voltaic (PV) Mainstreaming
2. Distribution Line Extension -
2,135 ₱121,399,155.00
Barangay Line Enhancement Prog
ram (BLEP).
3.
183 ₱ 1,455,948.00
Enhanced Nationwide Intensificati
on of Household Electrification (NI
4.
HE)Mini-Grid Scheme 3,563 ₱ 134,657,255.00
Total 6,874 ₱289,288,358.00
12
IV. 2022-2026 Missionary Electrification
Plan
Energy Sales, Gross Generation and Fuel Volume
800,000.00
700,000.00
600,000.00
500,000.00
400,000.00
kLiters
300,000.00
MWh
200,000.00
100,000.00
0.00
2016 2017 2018 2019 2020 2021* 2022 2023 2024 2025 2026
Historical Forecasted
Notes:
• *Data used for 2021 are actual of January to August and September to December projections.
• Justification for the increase in actual of 2021 and projection 2022
1. Entry of 17MW lease of gensets for Mindoro Province.
2. Increase in demand (additional household connections, increase in operating hours)
3. Incoming new areas.
13
IV. 2022-2026 Missionary Electrification
Plan
NPC’s Renewable Energy (RE) Roadmap 2021-2040
NPC’S RE PROGRAMS SHORT-TERM MEDIUM-TERM LONG-TERM OVERALL
AND PROJECTS (2022-2023) (2024-2025) (2026-2040) OBJECTIVES BY 2040
5 areas 4 areas
Wind Resource Utilize
Development Resource Pre- Project indigenous
Assessment construction Implementation and renewable
energy
5 areas
Mini/Micro Hydro resources
Resource Resource Pre- Project Reduce
Development Assessment construction Implementation dependence
Rural on imported
PV Pre- oil-based fuel
Netwo
Mains Paid
rk Reduce
PV Mainstreaming treami Meter
Servic production
ng ing
e cost
Reduce CO2
3,220 HH 2,181 HH
emissions
PV Mainstreaming Compliance to
(NPC) Provision of Solar
Home Systems (SHS) RA 9513 on
the Renewable
Portfolio
Solar Hybridization 11 Plants/ 17 Plants/ 17 Plants/ Standards
6 Plants/ 17 Plants/
of SPUG Diesel 745 kWp 1,655 kWp 3,610 kWp 2,760 kWp 2,600 kWp (RPS) for Off-
Power Plants Grid Areas
14
IV. 2022-2026 Missionary Electrification
Plan
Increase in Operating Hours Service (BASELINE 2015)
160
140
No. of SPUG plants
120
100
80
60
40
20
0
2015 Actual (as of 2022 2023 2024 2025
25 October
2021)
B. VISAYAS - - - - -
*Rental in Pulang Lupa, Occidental Mindoro and Bansud, Oriental Mindoro with capacity of 10 MW and 7MW, respectively.
The Contracts for the 10 MW in Occidental Mindoro and 4MW in Oriental Mindoro have been already awarded while the
remaining 3MW in Oriental Mindoro is for procurement process.
16
IV. 2022-2026 Missionary Electrification
Plan
3. Decommissioning Program
17
Action Requested
18
THANK YOU!!
19