Project Management Essentials-4
Project Management Essentials-4
Ahad Nazir
Critical Path Method
Free Float is the amount of
The difference between late time that an activity can be
CPM calculates the Total float is the amount of
finish and early finish or delayed without delaying
theoretical early & late start time that an activity can be
late start and early start is the early start date of any
and finish dates of each delayed without delaying
called float or Total Float of immediate successor
activity of the project the project finish date
the activity activity within the network
path
Forward Backwar
Float
Pass d Pass
Critical
Path
Forward Pass
Early Finish Date
Early Start Date (ES) Duration Forward Pass
(EF)
• Earliest possible • Activity Duration • Earliest possible • Starting at the
point in time an Estimate time the activity can beginning of the
activity can start, finish network
based on the • Establishes the early
network logic and start and finish dates
any schedule for each activity
constraint • Progressing to end
of the network
• ES + Duration – 1 =
EF OR ES +
Duration=EF if you
take start of 1st
activity to be zero
Forward Pass
Backward Pass
Late Start Date (ES) Late Finish Date (EF) Backward Pass
• Latest possible point • Latest possible time • Starting at the end of
in time an activity can the activity can finish the network
start without delaying without affecting the • Establishes the late
the successor activity activity successor start and finish dates
for each activity
• Progressing towards
the start of the
network
Backward Pass
Free Float and Total Float
Free Float/Slack: Amount Total Float/Slack: Amount
of time an activity can be of time an activity can be
Late Dates-Early Dates =
delayed without delaying delayed without affecting
Total Float
the early start date of its a project’s required due
successor date