Six Sigma: Statistically Visualized
LOWER SPEC. LIMIT UPPER SPEC. LIMIT
PROCESS MEAN
1.5σ shift SIX SIGMA PROCESS 1.5σ shift
6σ 5σ 4σ 3σ 2σ 1σ 0 1σ 2σ 3σ 4σ 5σ 6σ
Six Sigma Roadmap
Define
1
Build project from
nonconformance,
feedback & audits
Measure
SIX SIGMA IMPROVEMENT SIX SIGMA DESIGN (DFSS)
Collect measurements
Define Define
2
Measure Control/Verify Measure
Monitor live
Analyze dashboards Analyze
Improve Analyze Design
Analyze processes
Control online (OLAP) Verify
4
Improve/Design
Correct, design train &
3
document
Design for Six Sigma (DFSS)
D EFINE Define project goals
Customer analysis/
risk assessment
Assemble team
M EASURE Capture vice of customer Determine project schedule Determine risk assessment
A NALYZE Develop CTQ’s Review project schedule Review risk assessment
D ESIGN Develop models Determine CTQ’s
O PTIMIZE Review CTQ’s Tolerance testing Design optimization
V ERIFY
Product comparison against
initial specifications
Document development
Six Sigma 7X7 Toolbox
QUALITY CONTROL
DESIGN TOOLS STATISTIC TOOLS PROJECT TOOLS LEAN TOOLS CUSTOMER TOOLS MANAGEMENT TOOLS
TOOLS
Check forms (including
Robust design Factorial attempt Network plan Standardization Kano-Model Decision tree
measure plan)
Quality Function Development
Skill analysis Project & team description Waste analysis Requirement structuring Histogram Affinity diagram
(QFD)
TRIZ Regression analysis CTQ-Analysis Shortage analysis House of quality Pareto-Diagram Relations diagram
Pugh concept
Multivariate analysis Tree diagram Flow diagram Taguchi loss function Cause-and-effect diagram Tree diagram
selection
Statistical tests
FMEA / VMEA Skill analysis Supply chain matrix Customer interviews Graphic comparison Matrix diagram
(ANOVA, ANOM)
Fault tree analysis
Hypothesis testing Cost-benefit analysis Set-up time analysis Customer surveys Relations diagram Matrix-Data-Analysis
(FTA)
Tolerance design Gage R&R analysis Control charts Red-Tag-Analysis Conjoint analysis Control charts Network plan technique
Six Sigma Methodology - DMAIC
Collect relevant data about the Determine the optimum values for key
process and the problem contributing process inputs
MEASUR IMPROV
E E
D M A I C
ANALYZ CONTRO
DEFINE
E L
Define the problem and the ideal in terms Identify the cause-effect relationship between Establish standards to sustain
of the target to achieve inputs and outputs. improvements in the long run.
The 5 Phases of DMADV
01 02 03 04 05
DEFINE MEASURE ANALYZE DESIGN VERIFY
• Project team or determine • Identify & segment • Implement customer req. • Create detailed design • Review performance of the
project charter customers into design concept • Develop robust design new product of the process
• Determine objective & • Identify & analyze • Rate design concept (QFD, with optimal target (piloting)
scope of project customer req. TRIZ…) value/cost benefit ratio • Implementation of work
• Interface to other • Compare existing product • Evaluation under • Apply DOE preparation & production
processes/define sector & with internal/external application of FMEA • Continuously monitor
provide resource benchmarking (target costing…) results of new process
• QFD for CTQ’s