PACHEM GLOBAL PVT LTD
HSE Improvements
PHTHALIC ANHYDRIDE PLANT
Plot # 25, Phase 1, FIEDMC M-3 Industrial City
Faisalabad, Pakistan
HSE SOPS
These SOP’s are Completed and Implemented.
1. HSE Policy 12. Smoking Policy
2. PPE’s Procedure 13. General Safety Rules For employees
3. Instructions on Hazardous Substances 14. Fire Regime at Plant
4. Acid and Alkalis 15. Compressed Gas Cylinder Safety
5. Crane Safety 16. First Aid
6. Forklift Safety 17. Gas Hazardous Work in Vessel
7. Hot work 18. Hazardous work
8. Induction Training 19. Electrical Safety
9. Road Transport Safety 20. Respiratory Protection
10. Work at Height 21. Cold Work Procedure
11. Loading and Unloading
Fire Extinguisher
Fire Extinguisher has been installed around OX tank, Oil Heater, Substation,
CCR, Laboratory, flaker area. For process area fire extinguisher PR has been
raised and on arrival at site they will be installed on immediate basis. Some
Pictures are attached here.
Laboratory substation O-Xylene O-Xylene Pump Area
Oil Heater
Fire Alarm System
Fire Alarm System has been operational. Training for Fire Alarm system has also
been done and their record has been updated.
Housekeeping
Housekeeping has been done in different areas. Remaining house keeping in
progress. Deputed 4 persons at plant site for housekeeping only. Some areas
pictures are as under
Work Permit System
Work Permit system has been implemented at site. Their implementation ensured on
daily basis by HSE officer. Their record maintained by HSE Department in documented
form. If somebody violate of any part of work permit it will be declared “Near Miss”. HSE
department shall issued a warning letter or imposed a fine.
First Aid
First aid Box is updated at site. First aid box is placed at Main Gate, HSE
Office, CCR. HSE department gives first aid to employee in case of any
burn, cut etc. Record of First aid items is updated.
Sign Boards
Sign boards have been given for printing. Some of pictures as under.