The method study will guide you to select the right method to perform
any operation and then we can proceed for next operation as well to
find out the causes of delay in the
process of stitching.
METHOD IMPROVEMENT
Once the method study is done, one looks for better ways to
save time and less effort by the operator. This could be done by
improving work motions / provide work aids like gauges ,
folders , attachments , trolleys , movers, tracks or machine
automation.
TIME STUDY
The recording of time of each operators conducted by the
engineer is termed as time study. Once the time is
recorded, allowances for fatigue, machine delays ,
personal and other times are added .
This time is termed as SAM ( Standard Allowed Minutes)
or SMV ( Standard Minute Value ).
Time study calculates the standard minutes for any
specific operation and it is the average for one cycle of an
operation that we would measure over a typical day if we
had;
1. A skilled operators
2. Plenty of works
3. Workplace and machinery
4. Output with correct level of quality
5. Expected delays due to process
IDLE TIME
During the course of production, it is observed that
operators are idle and wait for production , this idle
time is loss of time and production.
CREATIVE PRODUCTION PLANNING
Example : if a factory has 100 machines and working hours are 8 hours
per day and 26 days per month . the efficiency level of operators is
observed to be at 80% .
Answer:
Ans. 330 hours of available capacity – 500 hours of required capacity = -170 hours
OEE= a x q x p
Ans. =(500*48*60)/30=48000garments/week
SMV/SAM ?
Standard Minute Value (SMV) is the time
allocated through work measurement for an
operation to be completed at 100% rating
Ans:
SMs produced =1500x.30=450 SM
Operator’s performance
Operator performance
Example