GSM KPI Analysis: Presented By: Bhupendra Jha
GSM KPI Analysis: Presented By: Bhupendra Jha
Presented By:
Bhupendra Jha
Major KPI
SDCCH Service Rate ( 100%)
SDCCH Congestion ( < 5%)
TCH Service Rate (100%)
TCH Congestion( including and Excluding Handover) (< 5%)
Call Drop Rate (<2%)
Traffic Erl.
Radio Switch Rate ( More is Better).
TCH Assignment and Allocation Failure (< 5%)
Handover Success Rate (>95%)
SDCCH and TCH Service Rate
These two Index is due to unavailable SDCCH
and TCH time Slots.
It indicates the Service Status of Our Network.
It mainly due to Faulty TRX, Down Site or Link
between TRX and BSC lost.
SDCCH Congestion
Insufficient capacity
Interference
Inappropriate Parameter Settings ( e.g. CRO,
CRH, Periodic Location Update Timer)
TCH CONGESTION
Insufficient Capacity
Large Interference
Coverage
Inappropriate Parameter Settings ( cell
Reselection, CRH, Min MS Access level)
Parameters to reduce congestion
• 1. TCH Traffic Busy Threshold(%)
2. RXLEV_ACCESS_MIN
3.Balance Traffic Allowed
4. Load HO Allowed
Call Drop
Call Drop due to Radio Link Failure
Call Drop due to LAPD Link Failure
Call Drop Due to Handover Failure
Call Drop Reasons
Equipment Hardware Fault
Poor radio Signal, Causing Poor coverage
Interference
Inappropriate Parameter settings (handover
Parameter)
Unstable transmission
TCH Assignment Success
After BSC receives the ChannelActivationAck message during
the channel allocation process, it sends the IMMEDIATE
ASSIGN COMMAND message on downlink SDCCH, and it is
recorded as a TCH assignment attempt. The TCH assignment is
mainly performed between BSC and MS, and BTS only
transparently transfers relevant commands. After BSC receives
the Establish Indication message from BTS, the TCH
assignment succeeds; otherwise, the TCH assignment fails.
This process mainly involves the radio interface and is
interfered by indefinite factors, thus the assignment failure
rate is high.
Low TCH Assignment Success Rate
• Probable Reasons
• 1.No Dominant Serving Cell
Action:Check coverage plots, perform drive tests.
Solution:Add new base station.
•
2.Severe Congestion on the TCH
Action:Check failed TCH allocation for assignment due to congestion.
Check failed TCH allocation for handover due to congestion .
Check TCH congestion.
• 3.Interference
Interference, disturbance on BCCH or target TCH frequency.
Action:Check Interference.
Solution:Improve frequency plan and decrease interference.
4.Faulty Transceiver
Action:Check BTS Error Log.
Solution:Replace or repair faulty equipment.