Content: MPT FTTH Project Operation Team Presentation

The document describes the structure and responsibilities of MPT's FTTH project team. It includes the following key points: 1. The team structure consists of a project manager, engineers, technicians, and line workers organized into three teams to complete installations. 2. Daily activities include site surveys, material supply, drop cable installation, optical network terminal configuration, and testing to activate subscriber connections. 3. The process for new installations includes laying drop cable, connecting to splitters, setting up the access termination box, measuring optical power, configuring the ONT, and testing the network connection.

Uploaded by

Aung Thein Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
351 views44 pages

Content: MPT FTTH Project Operation Team Presentation

The document describes the structure and responsibilities of MPT's FTTH project team. It includes the following key points: 1. The team structure consists of a project manager, engineers, technicians, and line workers organized into three teams to complete installations. 2. Daily activities include site surveys, material supply, drop cable installation, optical network terminal configuration, and testing to activate subscriber connections. 3. The process for new installations includes laying drop cable, connecting to splitters, setting up the access termination box, measuring optical power, configuring the ONT, and testing the network connection.

Uploaded by

Aung Thein Oo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 44

MPT FTTH Project Operation Team Presentation

Content
MPT FTTH Team Structure
OM

DyGM 

Project Manager Finance HR/Admin


 

 
Doc Control Project Engineer(NZA) Project Engineer(ZNW)

Kissflow Team

Site Engineer(1) Site Engineer(1) Site Engineer(1) Survey(1)

Technician(1) Technician(1) Technician(1) Materials Supply

Line-Man (2) Line-Man (2) Line-Man (2) Reporting


MPT FTTH Manpower

No Name Position Education Experiences

1U Zarni Win Project Engineer BE - EC  

2U Nay Zaw Aung Assistant Site Engineer BE - EC  

3U Kyaw Sann Lwin Junior Engineer BE - EC (Thesis) Almost one year in FTTH
4U Toe Shwin Ko Junior Engineer G.T.I (EC) Almost one year in FTTH
5U Aye Chan Lwin Junior Engineer BE-EP Fresher
6U Naing Ye Aung Junior Engineer BE-EC Experience in Micro Wave(BTS)
7U Yin Thein Project Technician Grade (11) Old Service in MPT
8U Aung Kyaw Swar Line Man Third Year (Bot.,) North Dagon
9U Aung Zin Htet Line Man Third Year (Bot.,)  Fresher
10U Naing Win Htike Line Man Grade (11)  Fresher
11U Ye Wint Kyaw Line Man Grade (11) FTTH in Fortune and South Dagon
12U Tin Tun Aung Line Man B.Sc (Physics) South Dagon
13U Swan Khant Htet Paing Line Man Grade (11)  Fresher
14U Hla Aung Line Man Grade (11)  Fresher
15U Shine Htet Aung Line Man Grade (11)  Fresher
MPT FTTH Skill Requirement
MPT FTTH Team Structure
Proposed to MPT Team(1)
Technician(1)
Engineer
Labour(2)
Team(2)
Technician(1)
Project
Engineer
Engineer
Labour(2)
Team(3)
Technician(1)
Engineer
Labour(2)
MPT FTTH Introduction
Our Capabilities

1. Project Coordination and Kissflow using (Field+Doc)


2. QC and document control (Field+Doc)
3. Survey Feasible check, Installation and activation
4. Maintenance
5. Report

Our Capacity
1. Day 1 capacity  1 Teams (1xEngineer, 1xTechnician, 2xHard Labour)
2. We can do 4 circuit CID activation per a day by one team.
3. We can maximize up to 12 circuit CIDs activation per a day by three teams.
MPT FTTH Activation
Team Assignment

Phase State and Region Area Number of FAT Number of subscribers Teams

Tamwe 152 152*16=1432 356

Phase02,03 and04 Yangon Kamaryout 24 24*16=384 95

Thingangyun 190 190*8=1520 380


MPT FTTH Daily Activities
Technical Implementation work Technical Site Survey and Materials Supply

On site Installation and Activation On


1. site Survey
Survey for targeted area
1. Drop Cable Laying/Installation 2. Survey for Last-mile reach ability
2. Drop Cable connection to FAT/Second Splitter 3. Survey for feasible check
3. ATB setting-up and drop cable connection to ATB
4. Optical power measurement at ATB
Material Supply
5. VIP check for connectors 1. Collecting materials form MPT office
6. ONT setting-up and Patch Cable connection (ATB to ONT) 2. Purchasing materials
7. ONT Configuration(SSID and Password)
Issue
8. Network Testing and 1. Technical issue (IP conflict, Port conflict)
9. Reporting 2. Technical support (for fresher)
MPT FTTH Technical Implementation

1. Drop Cable Laying/Installation

First of all, we have to do cable laying/installation from second splitter to access point of electrical power
at customer’s house.

Drop Cable FAT Access point


Route
(electrical power)

Note : We must not to do attaching drop cable to Electrical pole (EPC).


MPT FTTH Technical Implementation

2. Drop Cable connection to FAT/Second Splitter( 1:16 )

At the second step, we have to do termination and splicing for drop cable to connect to FAT.

Splicing Connected to Drop Cable


point Splitter Port connection

Termination
point
MPT FTTH Technical Implementation

3. ATB(Access Termination Box) setting-up and drop cable connection to ATB

After finished drop cable laying from FAT to Customer’s house.

Splicing Set-Up to
point wall
MPT FTTH Technical Implementation

4. Optical power measurement at ATB

We will use MT9090 µOTDR to measure Optical power level. We have to use 1310nm and 1490nm since this network is
GPON Network.

 Connect MT9090 µOTDR to ATB by using Patch Cable(SC/PC-SC/APC)


 OTDR powering on and Go to Power Meter Mode
 Select wavelength(1310nm/1490nm) using F1 Key

1310nm 1490nm
MPT FTTH Technical Implementation

5. VIP Check for connectors


MPT FTTH Technical Implementation

6. ONT(Optical Network Terminal) setting-up and Patch Cable connection (ATB to ONT)

In this step, check LED indicator of PON and LOS. If the ‘’LOS” LED indicator is red, check connection of Patch cable(ATB to
ONT),if else check VIP and need to do cleaning connector using cleaning kit(STICKLERS). If the “PON” LED indicator is green in
stable, it is access Internet.

‘’LOS” LED “PON” is green


cleaning
indicator is red in stable
MPT FTTH Technical Implementation

7. ONT Configuration

In this step, we have to do configuration of Wi-Fi SSID name and PASSWORD, set Number of Associated Devices, etc…

 Open internet browser (Mozilla Firefox or Google Chrome or IE)


 Go to Web address bar and type the web address/IP address (see the base of ONT for IP address)
 Enter User name and Password (see the base of ONT for User name and Password)
 Go to WLAN page to do configuration of Wi-Fi SSID name and PASSWORD, set Number of Associated Devices, etc…
 After that click the “apply” under WLAN page
MPT FTTH Technical Implementation

Info for address,


user name and
password,
default SSID and
Password
MPT FTTH Technical Implementation

User name
Type and
192.168.1.1 Password
MPT FTTH Technical Implementation

Password/
Key SSID
Name

After all
click
“Submit”
MPT FTTH Technical Implementation

8. Network Testing

In this Network Testing, we need to do testing of PING, Speed test, etc…

PING Test :
 Open computer and go to “Run” (Press both of window key and R key at the same time).
 Type “cmd” in the “Run” box, and will appear C:\Windows\System32\cmd.exe box
 PING google.com, youtube.com and dota2.com in the C:\Windows\System32\cmd.exe

Speed Test :
 Open internet browser (Mozilla Firefox or Google Chrome, ie, etc…)
 Go to Web address bar and type “speedtest.net”
 Select “MPT” Sever and Click “GO”
MPT FTTH Technical Implementation
 Open computer and go to “Run” (Press both of window key and R key at the same time)
 Type “cmd” in the “Run” box, and will appear C:\Windows\System32\cmd.exe box

Type “cmd”
MPT FTTH Technical Implementation
 PING google.com, youtube.com and dota2.com in the C:\Windows\System32\cmd.exe

Type “ping google.com”

Type “ping youtube.com”

Type “ping dota.com”


MPT FTTH Technical Implementation
 Open internet browser (Mozilla Firefox or Google Chrome, IE, etc…)
 Go to Web address bar and type “speedtest.net”
 Select “MPT” Server and Click “GO”

Select “MPT”

Click
“GO”
MPT FTTH Technical Implementation

Working Standard
MPT FTTH Technical Implementation

9. Reporting

Finally we have to report to KISSFLOW user with flowing “Reporting Materials”

1. Inside FAT photo


2. Outside FAT photo
3. ATB photo
4. ONT base photo
5. ONT Up-Side photo
6. VIP result
7. Optical power meter
8. Speed test
9. PING test
10. AN photo with customer’s sign and filled required info (ATB power meter, internet speed, Date, etc…)
11. Customer Feedback photo
MPT FTTH Reporting
1. Inside FAT photo
MPT FTTH Reporting
2. Outside FAT photo
MPT FTTH Reporting
3. ATB photo
MPT FTTH Reporting
4. ONT base photo
MPT FTTH Reporting
5. ONT Up-Side photo
MPT FTTH Reporting
6. VIP Result
MPT FTTH Reporting
6. VIP Result
MPT FTTH Reporting
7. Optical Power Result
MPT FTTH Reporting
7. Optical Power Result
MPT FTTH Reporting
8. Speed test
MPT FTTH Reporting
9. PING test
MPT FTTH Reporting
8. AN photo with customer’s sign and filled required info (ATB power meter, internet speed, Date, etc…)
MPT FTTH Reporting
9. Customer Feedback photo
MPT FTTH Team Performance
Strength
•PPE & HSE (Zero Accident)
•Working high Certificate (All employee)
•OTDR(Anritsu), Splicer(FITEL), VIP(Anritsu), VFL
•Proper clean solution such as cleaning kit (STICKLERS)
•Using Fusion splicing method (better than mechanical splicing for long life)
•Proper labelling
•Using customer feedback form (take care our customer’s satisfaction)
•We can supply a complete solutions such as installation, project management, integration, testing & commissioning, etc.
•We have been trained by our partners and therefore, our skills are higher and more reliable.
•We promise good quality, reliable service and fair prices.
Weakness
•We still need to provide training for fresher(Line-Men and Engineers)
•Training to do OTDR measurement, troubleshooting and to meet up our TI standard and reporting
•Skills set up and reporting system
MPT FTTH Team Achievements
Team Achievement
•Zero Accident
•Team growth
•Client satisfaction

To Do Improvement
•Weekly project meeting(Every Saturday)
•Sharing information
•Review for every issues
Review for all projects
Thilawa GEPON project Eager Last-Mile transmission
•Project engagement >> Good •Project engagement >> Fair
•Expense >> Good •Expense >> No good
•Scope >> Clear •Scope >> Clear
•Planning and operation >> Good •Planning and operation >> Not Good
•Done successfully •Done successfully

YTP GPON project ABC (MPT FTTH Trial Project by Huawei)


•Project engagement >> Good •Project engagement >> Fair
•Expense >> Fair •Expense >> No good
•Scope >> Clear (have some SOW issue) •Scope >> Not Clear
•Planning and operation >> Good •Planning and operation >> Not Good
•Done successfully •Fail
Review for all projects
Skynet Head office optical network MPA
•Project engagement >> Good •Project engagement >> Good
•Expense >> Good •Expense >> Good
•Scope >> Clear •Scope >> Clear
•Planning and operation >> Good •Planning and operation >> Good
•Done successfully •Done successfully

Crown Beverage Mytel FTTH Project


•Project engagement >> Good •Project engagement >> Fail
•Expense >> Good •Expense >> No Good
•Scope >> Clear •Scope >> Not Clear
•Planning and operation >> Good •Planning and operation >>
•Done successfully •Fail
To Provide from Management Team
Our Wishes
•Project hunting
•Engagement
•Partnership
To Provide from Operation Team
Our Responsibilities
•TSSR
•Proposal
•Estimation of BOQ and Expense
•Operation
•Relative cooperation
Questions & Answer

Thank you
Zarni Win