Analysis General For Clients
Analysis General For Clients
Analysis General For Clients
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
1. Department Structure
1. Department Structure
Contents
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
2. Project Information Package
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
3. Data Checks and Transformation
The recorded data is checked for quantity and quality using several
graphics such as:
• Memory Consumption
• Data Quantity
• Odometer Data
• Electronic Status
• Rotation
• Channel Statistics
• Speed
• Magnetization Level
• Calculated Wall Thickness
3. Data Checks and Transformation
Magnet @ 12:00
Valve @ 0.00 m
Contents
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
4. Weld and Feature Searches
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
5. Multiple Survey Type Data Correlation
CDP
EGP
5. Multiple Survey Type Data Correlation
CDP data
recorded in 2001
CDP data
recorded in 2011
Contents
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation, and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
6. Marker Evaluation
BM5
Above
Ground
Marker box
Upstream (internal Downstream
(external antenna) (external
antenna) antenna)
U I D
Ground
Surface
Recorded
Data
6. Marker Evaluation
BM6/BM7
Above
Ground
Marker box
(internal
antenna)
Ground
Surface
Recorded
Data
Contents
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
7. Database Setup and Overview Log
The weld search and feature search result in two primary databases that
will be used to identify all events detected during the inspection.
The ‘reference’ database includes all detected weld locations and
eventually contains all installations, long seam orientation, spiral weld
connection, bends and markers as well.
7. Database Setup and Overview Log
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
8. Weld, Installation and Feature Verification
WELD Secondary
channels
NOT A WELD
Primary
channels
8. Weld, Installation and Feature Verification
-REFERENCE: Installations
The installations are identified in a similar manner, based on their
‘pattern’ on the sensor data:
Secondary Channels
Valve center
Flange Primary Channels
Hot Tap
Tap
10:30
11:00
11:30
12:00
clock position
00:30
01:00
01:30
02:00
09:30
10:00
10:30
11:00
11:30
clock position
12:00
00:30
01:00
01:30
02:00
02:30
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
9. Integration of XYZ data results
In case the inspection tool was equipped with a gyro unit, ROSEN can
provide clients with (XYZ) coordinates for all events recorded. These
coordinates can also be visualized within GoogleEarth® with a direct link
implemented in ROSOFT:
Contents
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
10. Calculation and Output
*
SMYS = Specified Minimum Yield Strength (hardness)
(S)UTS = Ultimate Tensile Strength (> collapse)
(S)UTS > SMYS
10. Calculation and Output
Pipeline Company
28” Crude Oil Pipeline
Launcher to Receiver
Contents
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
11. Inspection Survey Report
• Management Summary
• Pipeline Data
• Field Work Activity Report
• Data Quality Description
• Inspection Results
in the form of:
– Lists
– Graphs
– Statistics
11. Inspection Survey Report
1. Department Structure
2. Project Information Package
3. Data Checks and Transformation
4. Weld and Feature Searches
5. Data Distance Correlation (AFD, CDP, EGP/XGP, XYZ)
6. Marker Data Evaluation
7. Database Setup and Overview Log
8. Weld, Installation and Feature Verification
9. Integration of XYZ Survey Results
10. Calculation and Output
11. Inspection Survey Report
12. Electronic Data Reporting
12. Electronic Data Reporting