13-2
Arnold’s Muffler Shop
Waiting cost when the cost is based on time in the
system:
Total (Total time spent waiting by all
=
waiting cost arrivals) x (Cost of waiting)
(Number of arrivals) x
=
(Average wait per arrival)Cw
Total
waiting cost = (W)Cw
If waiting time cost is based on time in the queue:
Total
waiting cost = (Wq)Cw
13-3
Arnold’s Muffler Shop
13-4
Arnold’s Muffler Shop
Arnold estimates the cost of customer waiting
time in line is $50 per hour.
Total daily
waiting cost = (8 hours per day)WqCw
= (8)(2)(2/3)($50) = $533.33
Arnold has identified the mechanics wage $7 per
hour as the service cost.
Total daily
service cost = (8 hours per day)mCs
= (8)(1)($15) = $120
So the total cost of the system is:
Total daily cost of
the queuing system = $533.33 + $120 = $653.33
13-5
Arnold’s Muffler Shop
Arnold is thinking about hiring a different
mechanic who can install mufflers at a faster rate.
The new operating characteristics would be:
= 2 cars arriving per hour
= 4 cars serviced per hour
2 2
L 1 car in the system
42 2 on the average
1 1
W 1/2 hour that an average car
42 spends in the system
13-6
Arnold’s Muffler Shop
2 22 4
Lq 1/2 car waiting in line
( ) 4( 4 2) 8(1) on the average
1
Wq hour 15 minutes average
( ) 4 waiting time per car
2
0 .5 percentage of time
4 mechanic is busy
2
P0 1 1 0.5 probability that there
4 are 0 cars in the system
13-7
Arnold’s Muffler Shop Case
The customer waiting cost is the same $50 per
hour:
Total daily
waiting cost = (8 hours per day)WqCw
= (8)(2)(1/4)($50) = $200.00
The new mechanic is more expensive at $20 per
hour:
Total daily
service cost = (8 hours per day)mCs
= (8)(1)($20) = $160
So the total cost of the system is:
Total daily cost of
the queuing system = $200 + $160 = $360
13-8
Arnold’s Muffler Shop
13-9