Optimizing Chilled Water Systems
Optimizing Chilled Water Systems
Optimizing Chilled Water Systems
70
60
PRESSURE PSIG
50
45 PSID 38 PSID 12 PSID
40
30
20
10
0
PUMP CLOSE LOAD REMOTE LOAD
VFD
LOAD
LOAD
100 GPM 100 GPM
5 PSID 5 PSID
DP
5 PSID 5 PSID
28 PSID 2 PSID
Hydronic Fundamentals
Variable Flow System Dynamics
Options to Consider:
– No balancing valves, no balancing
– Automatic differential pressure control valves to control
differential pressure at close loads
– Pressure-independent control valves
Options NOT to Consider:
– Balancing valves at variable speed pumps
Hydronic Pumping Conclusions
1.050
ECWT
1.000
85 deg F
80 deg F
0.950 70 deg F
60 deg F
0.900
KW/to n n
0.850
0.800
0.750
0.700
0.650
0.600
0.550
20% 30% 40% 50% 60% 70% 80% 90% 100%
Chille r Pe rce nt Lo a d
VFD Effect on Part Load Chiller Efficiencies
1.10
1.00
0.90
0.80
0.70
KW/ton
0.60
0.50
0.40
0.30
0.20
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Percent Chiller Load
Chilled Water Plant Design
Optimize equipment sizing, selection and
operation to efficiently provide chilled water to
the loads under various load conditions
Consider maintenance when selecting and laying
out equipment
Select a plant configuration that best suits the
system requirements
Do not make control sequences too complicated
- the plant operator must understand the
sequences
Chiller Selection
DP
750 tons
Load
Load
750 tons
Load
Load
Off
Load
4000 GPM
VFD
Load
51° F 42° F
Secondary
42° F
Pumps LOAD
1600 GPM 1500 TONS
57° F
FM
2400 GPM
Variable Primary Flow
TYPICAL Part Load Operation - 1500 Tons
DP
DP
750 tons
Auto isolation valves
preferred to dedicated pumps:
Load
Load
Load
Off
Load
2400 GPM
42° F Load
VFD
Primary Pumps
On VFDs 42° F LOAD
NO FLOW 1500 TONS
57° F 57° F
FM FM
Evaporator flow
– Typically minimum 3 fps extended
– Rate of change limits (usually maximum 30% per minute)
Complexity of control
– Not as fail-safe - what if bypass valve fails at low flow?
– Must avoid abrupt flow shut-off (e.g. valves interlocked with
AHUs all timed to stop at same time)
– Flow fluctuation when staging chillers on
CHW TES integration can be difficult
Thermal Storage