Evaluation Tools For MASTER TEACHER
Evaluation Tools For MASTER TEACHER
Evaluation Tools For MASTER TEACHER
EVALUATION TOOLS
MEC Order No. 29, series
1979 and DECS Order No.
57, series 1997
CRITERIA FOR MASTER TEACHER
CREDIT POINTS FOR LEADERSHIP, POTENTIAL
and ACCOMPLISHMENTS
MEC Order No. 29, series 1979 and DECS Order No. 57, series 1997
A. Introduced any of the following which has been adopted or used by the school or
district..
as to the actual usage thereof in at least 50% of the districts in the division merits 20
points
With a certification issued by proper authorities (District level)
as to the actual usage thereof in at least 50% of the schools in the district merits 18
points
With a certification issued by proper authorities (School level)
as to the actual usage thereof in the schools in the district merits 15 points
MEC Order No. 29, series 1979 and DECS Order No. 57, series 1997
INCOME GENERATING PROJECT (IGP) must possess overall quality. The following
A.2 Title:
steps
must be observed:
A project proposal/feasibility study (for the IGP) must have been submitted to the
District Office(Elem) / School (Sec) and indorsed to the Division Office c/o the
Income Generating Project Committee (PRINCIPAL, PSDS, EPS-TLE, ASDS-In-Charge
and
SDS)
A.2.a An IGP with documentary evidence/proof of its impact on the family and/or
community where the pupil/student/s belongs and has been conducted and
completed for at least a year at the time of evaluation of documents (to substantiate
its impact), merits 20 points.
A.2.b An IGP which proves to bear an impact but has been conducted and completed for at
least 6 months merits 18 points, 4 months merits 16 points, 2 months merits 12
points.
A.2.c An IGP still on-going merits 10 points
A.2.d An IGP barely started (within a month) merits 6 points
A.2.e A Feasibility Study duly submitted with Approved Permit to conduct merits 4 points
MEC Order No. 29, series 1979 and DECS Order No. 57, series 1997
B.1 SUBJECT COORDINATORSHIP/s or GRADE CHAIRMANSHIP/s for at least one (1) year Details:
B.1.b A Workplan / action plan duly approved by the respective school head;
B.1.c A Accomplishment Report as to the quality & quantity of achievements, and which
report must be counter checked against the said workplan/action plan.
criterion, must be for a minimum of two (2) years and must likewise be supported by:
B.2.c A Accomplishment Report as to the quality & quantity of achievements, and which
C.1 With proper designation as chairman, duly approved school program, program
completed and with certification by proper authorities as to its completeness = 12 points
A duly approved Research Proposal, with the tools of research to be used = 1 point;(School level)
D.2 A research commenced and with a Report on the Study Conducted merits 6 points;(Division level)
A research commenced and with a Report on the Study Conducted merits 5 points;(District level)
A research commenced and with a Report on the Study Conducted merits 4 points;(School level)
D.3 A research defended orally merits 9 points;
D.4 A research with a Completion Certificate issued by proper authorities merits 12 points.
MEC Order No. 29, series 1979 and DECS Order No. 57, series 1997
school level:
F.3 Participants to the In-set training must be Teachers, or Identified Clientele (for ALS);
F.4 The training matrix, and outputs with evaluation and feedback/s as proof.
Division = 10 points Division = 10 points