Introduction To 5S

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 98

Introduction to 5S

Contents

1. What is 5S?

2. Planning Stage

3. Implementing Stage

4. Sustaining Stage

01-2
How mess occurs at workplace?

Not necessary now, but maybe


Necessary in the future Unnecessary

01-3
Why it is important

Motion Over Produced

5S Eliminate Transportation
7 Waste

Inventory Waiting

Correction
Over Processed
01-4
5S Benefits to YOU

 It will make your workplace a safer, cleaner a


nd more pleasant place to work
 Make your job more satisfying.
 Eliminate overburdens and disappointment.
 Make it easier to communicate with everyone
you work with
 Gives you an opportunity to give creative inp
ut how your work place should be

01-5
01-6
What is 5S ?

1. Sort Seiri

2. Set-In-Order Seiton

3. Shine Seisou

4. Standardize Seiketsu

5. Sustain Shitsuke
7
What is 5S ?

1. Sort
 Remove all items from the workplace that are not
needed for current production or administrative
operation.
“only what is needed, only in the
 Keep

amount needed, and only when it is needed”.


Red Tag Discard
No Tag
Keep it

8
What is 5S ?

Why Sort is important?


 Space, time, money, energy
and other resources can be
managed and used most
effectively
 Problem and the work
flow are reduced.
 Communication between
employees is improved.
 Product quality

01-9
What is 5S ?

2. Set-In-Order
 Arranging needed items in the way easy to use and
so that easy to find and put away(visual
management)

10
What is 5S ?

Set in order
 Arrange needed items so;
 it is easy to use.
 label them so that anyone can find them easily and put th
em agin.
 Set-in-order is important because it eliminates;
 Time spent searching for an item
 Motion wastes
 Difficulty returning item to its original place
 Excess inventory
 Reduce damage
 safety

01-11
What is 5S ?

 There are two strategies correspond to set-in


-order;

1. Visual Control
2. Motion Economy

01-12
What is 5S ?

1. Visual Control Strategy


A visual control is any communication device
used in the work environment that tells us at a
glance how work should be done.
 We can implement standardization in such a
way that all standards are identified by visual
control.

01-13
What is 5S ?

Visual Control Techniques


 common visual control techniques;
1. Signboard strategy
2. Painting strategy
3. Color-code strategy
4. Outlining strategy
5. Visual Management Board (Kaizen
board) Strategy

01-14
What is 5S ?

1. Signboard strategy
signboards are used to identify what, where a
nd how many
There are three types of signboards
 Location indicator
 Item indicator
 Amount indicator
What is 5S ?

2. Painting strategy
Is a method for identifying locations on floors
and walk ways

01-16
Cont,d

01-17
What is 5S ?

3. Color-Coding strategy

01-18
What is 5S ?
4. Outlining strategy

01-19
What is 5s?
5. Visual Management Board (Kaizen bo
ard) Strategy
 Kaizen Board
 Standard size 2 times flipchart paper

Staff performance Improvement/


Staff performance success corner
maintenance tool

Problem/idea corner Solution corner

01-20
What is 5S ?

2. Motion Economy Strategy


 The process of removing motion waste involve
s eliminating unnecessary motion from existin
g operation.
 By locating items in the best location possible,
we can minimize motion waste.

01-21
What is 5S ?

Implement Motion Economy


 Below are three examples of elimination moti
on waste;
1. Keep frequently needed items close to you an
d rarely needed items away.
2. Frequently needed items are arranged for eas
y retrieval ergonomically.
3. Keep the processes close to each other and el
iminate zig-zag motion between them.

01-22
What is 5S ?

Ex: 30 Second Rule


Tool Box

01-23
What is 5S ?

3. Shine Seisou

24
What is 5S ?

What is Shine

 Shine means keep everything clean.

 When we Shine, we can’t avoid inspecting the


item at the same time. Therefore Shine and Ins
pect come together.

Page 25 of 65
What is 5S ?

Benefits from Shine


 Clean and comfortable workplace.
 Increase visibility to defects when it occurs.
 Helps to maintain safer workplace.
 Good working environment increase morale.
 Early detection of machinery and equipment fa
ilure.

Page 26 of 65
TAKE FIVE
Take five minutes to think about the following qu
estion & to jot down your answer.

What are some of the Sort, Set in order and Shi


ne routines that are already part of your life?

01-27
What is 5S ?

4. Standardize Seiketsu

28
What is 5S ?

What is Standardize
 Standardize is the method you use to maintain the
first three pillars (Sort, Set in order and Shine)
 Make it a rule to perform given work in the given
manner.
 Standardize is different from the first three pillars b
ecause it is a method used to sustain the first three
pillars rather than housekeeping activity.
What is 5S ?
Benefits from Standardize
 The basic purposes are to;
1. Lead to workplace standardization
 prevent setbacks in the first three pillars
 Make implementing them a daily habit
 Ensure that all the three pillars are maintained in t
heir fully implemented state.
2. Lead to work standardization
 Muda elimination
 Quality improvements
 Cost reduction
 Delivery time improvements
 Process improvements
What is 5S ?

5. Sustain Shitsuke

Means making a habit of properly maintaining correct


procedures
What is 5S ?

Some techniques to sustain


 5S Slogan
 5S poster
 5S newsletter and kaizen board
 5S audit
 awarding systems
 Big cleaning day
 5S month
 Benchmarking tour
What is 5S ?

What is next ?
Planning Stage

Steps for planning


1. 5S organization structure
2. Recognition of current condition
3.   Deciding activity range
4. Goal setting
5.   Planning stage
6.   Budgeting
7. Kick-off
Planning Stage

1. 5S Organizational Structure

Chairman

5S Promotion Office

5S Committee Members 5S Committee Members 5S Committee Members 5S Committee Members


(leader, members) (leader, members) (leader, members) (leader, members)
Planning Stage

5S Promotion office duties

 Prepare over all 5S implementation plan at

company level.
 Follow up standardize 5S activities at the
company.
Perform any other 5S related activities.

Organize &Training
Planning Stage

2. Recognition of current condition

 byusing 5S Checklist and 5Scheck list.xls


 Photography (Next page)
Planning Stage
Photography  
(1) Fixed-point Observation Type
Fix the location of the camera
and do photo shoots at the same
place both before and after
KAIZEN.

Before KAIZEN After KAIZEN


Planning Stage
(2) Random Type

39
Planning Stage

3. Decide Activity range

Limiting
Company
to Shop
-wide
Limiting to
Selecting Production
model shop Division

Limiting
to group Others

Variety of Alternatives
40
Planning Stage

Decide 5S promotion blocks.


Sample
Block A

Block B Block C

Block D

Block E
Block F
Planning Stage
4. Goal setting
1
Recognition
5S
Of
Of current 22
Committee
condition

Evaluation
Evaluation
33

Setting goal 4

Post
Planning Stage
Sort Activity Plan Sheet (Sample)

01-43
Planning Stage

01-44
Planning Stage
2) Setup of activity time
In case of 5S activity on Sustaining Stage (e.g. Cleaning)

Type of cleaning Time Frequency (timing)

Minor operation before/after working


Daily cleaning 5 – 10 min.
hour at each shop

Weekly cleaning 15 – 30 min. Weekend

Monthly cleaning 30 – 60 min. End of month

Big cleaning days 2 – 4 hrs. Before national holidays

In case of necessity for assistance


Location which is not easy to clean 1 – 2 days
request to other division
Planning Stage

3) Training plan
5S Committee

46
Planning Stage

6. Budgeting
It is necessary to prepare a budget for 5S activity because
it costs money.
Planning Stage
7. Kick-off (Declaration of 5S activity)

Inform all Assemble all


employees employees
of kick-off

Kick-off
Explain
Declare
the activity
the policy
Implementation Stage

Implementing So
rt Activity

01-49
Implementation Stage
Procedure For Sort Activity
Preparation

Necessary items Unnecessary items

Making a Shop Stock List Red Tag Strategy

Quantification Evaluation of unnecessary items

Set-in-order activities Disposal of unnecessary items

Shine Activity In parallel

Set-In-Order activity
Implementation Stage

Implementing Se
t-In-Order Activit
y
01-51
Implementation Stage
Procedure For Set-In-Order Activity
Set targets for Set-In-Order Activity

Decision of location, Storage, Indication method

Preparation of tools for Set-In-Order Activity

Decision of schedule and work allocation

Implementation of Set-In-Order

52
Implementation Stage

Implementing Sh
ine Activity

01-53
Implementation Stage

Determine shine target area

Determine shine assignments

Determine shine methods

Preparing proper tools for shine

Start to shine

54
Implementation Stage

Implementing St
andardize Activi
ty
01-55
Implementation Stage

 Standardize means to set up rules for Sort, Set-in-


order and Shine Activities

It is all about
“Make up the rules and follow them!”

01-56
Implementation Stage

Standards for Sort

 Red Tag Rules


• When to Red Tag
• How to Red Tag
• What’s go on the Red Tag
• more…
 Rules for the Red Tag Holding Area
• When to clear out
• How to dispose of items
• more…
01-57
Implementation Stage
Standards for Set-in-order
•Which items
•Where
•How many
•Who replenishes
•Return all items…
•What to do when items are missing
•Visual standards – signs, lines, labels and color codi
ng
more…

01-58
Implementation Stage
Standards for Shine
 Clean and Inspect (C&I)
 Show the task, person responsible, items
needed, frequency, desired workplace
 Where to keep cleaning supplies,
how to replenish when finished
more…

01-59
Implementation Stage

Implementing Su
stain Activity

01-60
Let’s sustain the gains !

The Questions Is

“How to Sustain ?

61
Let’s sustain the gains !

1. Patrolling
a. Top management Patrol
Must
 Check Up the activities Comprehensively
 Give emphasis on sustaining of the activity
 consider committees feedback

62
Let’s sustain the gains !

Making a round tour


of workplace

63
Let’s sustain the gains !

b. 5S Committee members and Promotion


office Patrol
Must
 Evaluate “5S Check List”
 Record problems on”5S check
findings”
 Tack picture of 5S problems

64
Let’s sustain the gains !
c. Mutual patrol
 Check mutually among 5S groups
d. Self patrol
 5S leader and members check the results of activity b
y themselves.
e. Checklist patrol
 Point out the problems by themselves at site as well a
s evaluate the results and encourage members to urge K
AIZEN.
f. Camera patrol
 Visibly highlight the problems and progress of the activity
using photographs.

65
2. Use Slogan and Poster of 5S Activity
 It encourage all the participants.

< Samples of slogan >
“Refresh yourself and workplaces by 5S activity.”

“Let's maintain current 5S activity and KAIZEN for tomorrow”

“We polish “Our Minds” as well us our factories”

01-66
< Sample of poster >

01-67
Let’s sustain the gains !

3. Awarding System

 awarding for 5S promotion results according to


evaluation is recommended.
Awards may be

- For Good performance


- Award for efforts
- Award for good Ideas

Prize winner - Group


- Individual 01-68
Let’s sustain the gains !

Promotion results must be shared by all the members

01-69
Thank
K
I

You
E

01-70
* Sort-Red Tag
1. Sort activity                                      No.
                              
Red Tag
Red Tag Sample Name of applicant: Date
Name of item: Quantity:
Part No.:
Location:

Classification
□1.Material  □2. Part   □3. Inventory in-process   □4.Product   
□5.Equipment/facilities □6.Cutting tool   □7.Jig  □8.Fixing  
□9.Others

A: Reason for item of 1 to 4


□a. Miscalculation/mistakes in sales/production plan □b. Order cancellation
□c. Design/specification change     □d. Design error
□e. Order error                □f. Receipt error (Insufficient
inspection)
□g. Machining error             □h. Assembly error
□ i. Obsolescence, Long time storage □j. Others
B: Reason for item of 5 to 9
□k. Ageing □l. Out of order
□m. No longer applicable □n. Others

71
* Sort-Red Tag

Red Tag Sample

Front Back
01-72
* Sort-Red Tag

Red Tagging Procedure


1. Sort Necessary and unnecessary items
2. Decide Red tag Holding Areas
3. Attach red tag to unnecessary items
4. Taking unnecessary things to “Red tag Holding Areas

5. Decision Making
6. Listing all unnecessary things in the Unused Article Li
st
7. Listing all necessary things in the Shop Stock List
01-73
* Sort-Red Tag

Example of Red Tag Items

Obsolete
equipment

Unused machinery
or equipment

Doubtful item

01-74
* Sort-Red Tag
A B
Disposal of unnecessary items

Office Storage

Holding Area

Holding Area Holding Area

75
* Sort-Planning Stage

1. 5S organization structure
2. Recognition of current condition
3.   Activity range
4. Goal setting
5.   Planning stage
6.   Budgeting
7. Kick-off

76
* Sort-Evaluation of unnecessary items

01-77
* Sort-Stock List

01-78
*Sort-Red Tag

“Red Tagged” Item


 An item with red tag is asking three questions;
 Is this item needed?
 If it is needed, is it needed in this quantity?
 If it is needed, does it need to be located here?
 Red tag item is subject to;
 Hold in a “Red Tag Holding Area” for certain time period to se
e whether they are needed.
 Disposed of.
 Relocated.
 Left exactly where they are.

01-79
*Set-In-Order - Decision of location and method

 First In First Out FIFO


 Setting Set-In-Order Rule
 Visual management

01-80
*Set-In-Order - Decision of location and method

Temporary
Storage

81
*Set-In-Order - Decision of location and storage method

01-82
*Set-In-Order - Decision of location and storage method

01-83
*Set-In-Order -Decision of display method
There are two types of indication.
 Indication by classification
 Indication by location [Process, Production line, Partition]
Indication by classification Indication by location
Spanner
Spanner

Scissors

Pincher

Pliers

Cart Cart
Common tools

01-84
*Set-In-Order -Decision of display method
Example ..

01-85
*Set-In-Order -Decision of display method
Standards for indication of fixed position

01-86
*Set-In-Order -Decision of display method
Example ...
fixed position Indications

01-87
*Set-In-Order -Decision of display method
Example ...

A1 A2 A3 A4 A5 A6 A7

A1 A2 A3 A4 A5 A6 A7

B1 B2 B3 B4 B5 B6 B7

B1 B2 B3 B4 B5 B6 B7

C1 C2 C3 C4 C5 C6 C7

C1 C2 C3 C4 C5 C6 C7

01-88
*Set-In-Order -Decision of display method
Indication of pathways

01-89
*Set-In-Order – Preparation Of Tools

90
**Determine shine assignments
5S assignment map. (Layout chart)
1. Demarcation for each teams
2. Who is responsible for each block
Sample
Production
Block A

RM
Material Finished
Machining Packing
Block
Block Block Block B YYYY
Painting
Goods
Block
Block A

Production
Carrying-in
Block B
route for
materials YYYY
Maintenance Stock Room
Sales Block Warehouse XXXX Shipping
Machining Block
Block B
Block&
Admin. Block 1
Block
Rest Room
Accounting
Block Production
Block
**Determine shine assignments

A 5S schedule should include at list


1 . Who is responsible
2 . Which area
3 . Which days and time allocated

01-92
**Determine shine assignments
Ex shine schedule

Type of cleaning Time Frequency (timing) Responsibility

Minor operation
Daily cleaning 5 – 10 min. before/after working hour Team A, Team B
at each shop

Weekly cleaning 15 – 30 min. Weekend Mr. X and Mr. Y

Monthly cleaning 30 – 60 min. End of month All employee

General cleaning several times 2 – 4 hrs.


Before consecutive All employee
a year holidays

In case of necessity for


Location which is not easy to
clean
1 – 2 days assistance request to other Team C
division
01-93
** Determine shine methods

Determine shine methods


 Choosing targets and tools:- define what will be cl
eaned in each area and what supplies and equipm
ent will be used
 Perform the five minute shine:- cleaning should be
practiced daily and should not require a lot time
 Creating standards for shine procedure:- peoples
needs to know what kinds of procedure to follow i
n order to use their time efficiently; Otherwise, the
y are likely to spend most of their time getting read
y to clean

01-94
** Determine shine methods
Developing Inspecting methods
(How and When)
Visual sense
Tactile sense
• dirt • Heat
• Breakage • Overcooling
• Missing parts • Bolt/nut loosening
• Oil leakage
• Water leakage

Smell sense Hearing sense


• Abnormal odor • Abnormal sound

01-95
** Start to shine

Example

01-96
** Start to shine

97
01-98
1