LAKE VIEW PARK

GROUP MEMBERS:

 M.Siraj Khalid
 Asad Bashir
 Waqas Arif
 Abdur Rehmen
INTRODUCTION

 The Capital City of


Islamabad has
impressive natural
landscape and healthy
environment, which can
be further improved
and beautified by
providing parks, play
fields and similar
infrastructure facilities
Introduction Cont’d
 Keeping in view the
excessive burden of
visitors at existing
picnic spots, the CDA
decided to provide an
additional recreational
facility in the vicinity
of Rawal Lake in the
form of Lake View
Park
HISTORY OF THE PROJECT:

 LAKE VIEW PARK


concept was first
initiated by Mr.
Kamran Lashari,
Chairman CDA at
that time
 Before lake view
park there was just a
linkage road
between old murree
road and Rawal Lake
History Cont’d
 The initial project was just to create a
recreational park that would cost not more
than Rs.10 crores which would be having a
parking lot and few sit outs

 later a loud thinking was given and it was


decided to expand the investment in this
project so as to make it one of world’s best
picnic spots
History Cont’d
 Chief land scape architect of CDA Mr.
Sheikh Saeed made the design of present
lake view park but before implication of it
he died
 After pre-qualification M/S Mansoor
Mazhar & associates were appointed as
designer cum contractor cum developer
(constructor) for this project.
History Cont’d
 CDA was responsible for
sponsoring, execution &
operation and
maintenance of the
project
 Capital Development
Authority (CDA) had
constructed and opened;
the Rawal Lake
recreational park, spread
on the 22 acres of land
History Cont’d
 The first phase of Lake View Park, in the
vicinity of Rawal Lake, at the cost of Rs
357 million, has been completed and
opened for public.
 Date of Start for Phase 1: 30-12-2005
 Completion date for phase 1: 30-05-2008
 Executing agency was Mansoor Mazhar
and associates.
DEVELOPER OF THE PROJECT
 CDA appointed M/S
Mansoor Mazhar
Associates as consultant
cum Designer cum
Contractor for Phase-I.
 The firm is led by Mr.
Mansoor Mazhar, who is
a renowned architect
having hundreds of small
to large projects on his
credit
 Architecture
 Planning
 Urban Design
 Land Development
 Interiors
 Landscaping
 Construction
 Surveying
 Project: Bahria Twin Towers-Under
Planning - Bahria Town, Islamabad.
 Project: Tricon House (25 Storey Building)
- Under construction - Tricon, Lahore.
 Project: Lahore Centre-Construction
Completed - Gulberg Lahore.
 Project: DIVINE Center - Construction
Completed - Defence Road Lahore.
Cont’d
 Project: MEGA Tower - Under Construction -
Main Boulevard, Gulberg Lahore.
 Project: Office building in Lahore (11 storey
180,000 sq.ft.) - Clint Umar Kasuri
 Project: Corporate office building in Lahore (6
storey with 35,000 sq. ft) - Client: Khalid
Shafiq Mill
 Project: Corporate office building in Lahore (5
storey with 9,000 sq. ft) - Client: MICCOP Ltd.
 Project: Paragon City, Gullberg Lahore and
working as designer there.
 The sponsor of the
project lake view park
is Capital
Development
Authority.
 CDA is responsible for
sponsoring, execution
& operation and
maintenance of the
project.
 Blue mask Contractors which are currently
working on the on-going project of walk-in
aviary at Lake View Park
 Plants and flowers consultants
 General public
 Rizwan Baig consultants for second phase.
 The Capital
Development
Authority (CDA) came
into existence on June
14, 1960, first by an
executive order issued
on June 24, 1960
entitled the Pakistan
Capital Regulation,
which was then
superseded by the
CDA ordinance issued
on June 27, 1960
Cont’d
 Initially the
administration of the
Authority and its
functions were handed
responsibility to a board
consisting of three
members: the Chairman,
Financial Advisor and one
other Member with the
commissioner Rawalpindi
acting as an ex-officio
Member
Cont’d
 The CDA board is now composed of the
Chairman and Members of Planning,
Finance, Administration and Engineering
 City Maintenance.
 Citizens Satisfaction.
 Availability of indispensable necessities.
 Further expansion of city with the passage
of time, making amendments to meet
requirements of that time.
 To keep city and its environment clean.
Cont’d
 Acquire land and undertake works in "Specified
Area".
 Planning and execution of development
schemes.
 Procure plants machinery instruments and
materials
 Enter into contracts.
 Carry out studies, surveys and research.
 Removal of any works obstructing in schemes
 Rehab/Renovation/Improvement of Street Light
system at National Library IBD .
 Rehab/Renovation/Improvement of Street Light
system in St No. 57, 59, 49, 56, 47 & 48 F-6/4
Islamabad
 Rehab/Renovation/Improvement of Street Light
system at different locations in F-6/1 .
 Rehab/Renovation/Improvement of Street Light
system at different locations in F-6/3 St-1 School
Road.
Cont’d
 Provision of High Mast Poles at Different
Parks & Markets in F-6 Islamabad.
 Provision of High Mat Poles at different
parks & markets in F-7 and Parbat Road F-
7/1.
 Rehab/Renovation/Beautification of
Argentina Park G-6 Islamabad.
 Rehab/Renovation/Improvement of Street
Light system at Pitras Bukhari Road H-8.
Cont’d
 Office Building for Wafaqi Muhtasib
Secretariat.
 City Hall/ CDA Head Quarter Building.
 Construction of Pedestrian underpass at
Aabpara Market on Suharwardy Road.
 Mini Fair Price Shops in Various Sector of
Islamabad.
Strengths:
 One of the world’s best picnic spot.

 Ideal Location

 Entertaining Activities like horse riding,

battle fields, water sports, Dirt Bikers


which no other park has in this territory.
 It is the biggest park with respect to area

in the respected territory.


Cont’d
Weakness:
 Maintenance of the park is one of the weakness
because of its vast area.
 No proper security checking.

Opportunities:
 A bridge linking between old lake view and lake
view park as it will give a great view to the
public.
 Another opportunity is to make a bowling arena
in the near future besides of other entertaining
games
Cont’d
Threats:
 The only threat to it is any Natural disaster

like flood in the dam can cause a lot of


damages to the park.
 Due to lack of security any unwanted

incident can occur.


 Chairman Mr. Tariq Mahmood Khan
 Member Finance Mr. Saeed-ur-Rahman
 Member (P&D) Mr. Syed Tanveer Hussain
Bokhari
 Member Engineering Mr. Tahir Shamshad
 Member Environment Mr. Mazhar Hussain
 Member Estate Brig. (R) Mr. Asad Munir
Cont’d
Chairman Office
 Coordination Directorate
 Project Management Office
 Public Relations Directorate
 Sports & Culture Directorate
 Security Directorate
 Computer Directorate
Cont’d
Estate Wing
 Directorate of Law Opinion
 Directorate of Building Control - II Civil
 Building Control Directorate
 Estate Management - I
 Estate Management - II
 Enforcement Directorate
 Directorate of Land & Rehabilitation
 Law Directorate
 Directorate of One Window Operation
Cont’d
Engineering Wing
 Directorate of M.Q.C
 Bulk Water Management Directorate
 Central Engineering Laboratory
 Coordination Directorate (Parliament House)
 General Services Directorate
 E&M (Development)
 E&M (Maintenance Directorate )
Engineering Wing Cont’d
 Maintenance Directorate
 MPO Directorate
 Programming & Evaluation Directorate
 Directorate of Parliament Lodges & Hostels
 Road Directorate (North)
 Road Directorate (South)
 Sector Development Directorate
 Special Project Directorate
 Water & Sewerage Development Directorate
 Works Directorate
 Water Supply Directorate
Cont’d
Environment Wing
 Environment Directorate (West)
 Municipal Administration Directorate
 Environment Directorate (East)
 Environment Directorate (Regional)
 Environment Directorate (Urban/West)
 Sanitation Directorate
 Directorate of Parks
 Zoo & Wildlife Management Directorate
Cont’d
Planning & Design
 Directorate of Society
 Traffic Engg. & Transport Planning Cell
 Architecture Directorate (Design Wing)
 Regional Planning Directorate
 Structure Directorate
 Urban Planning Directorate
Cont’d
Finance Wing
 Internal Audit Directorate
 Accounts Directorate
 Finance Directorate
 Revenue Directorate
INTEGRATION MANAGEMENT :
 Concept was first initiated by Mr. Kamran
Lashari, Chairman CDA at that time. He
was aware that Islamabad should not be
branded as a dull city and that they must
make it more attractive.
 Before lake view park there was just a
linkage road between old murree road and
Rawal Lake
Integration Mgt. Cont’d
 The initial project was just to create
vicinity that would cost not more than
Rs.10 crores which would be having a
parking lot and few sit outs but later a
loud thinking was given and it was
decided to expand the investment in this
project so as to make it one of world’s
best picnic spots
Integration Mgt. Cont’d
 Chief land scape architect of CDA Mr. Sheikh
Saeed made the design of present lake view
park but before implication of it he died. After
pre-qualification M/S Mansoor Mazhar &
associates were appointed as designer cum
contractor cum developer (constructor) for this
project
 CDA is responsible for sponsoring, execution &
operation and maintenance of the project.
 The scope of the project initially was not huge
as it was suggested just to make some sit outs
and parking lot for the public just to enjoy the
recreational view of the dam.
 Later on the scope was increased to a public
park at bigger scale. As CDA had been working
in big projects so they had the capabilities to do
such a big project and they initiated it by the
help of Kamran Lashari the Chairman of CDA at
that time.
Cont’d
 Scope of the project changed after the
hurdle in the form of Chief Landscape
Architect Sheikh Saeed’s death. After
which the project was awarded to M/S
Mansoor Mazhar & associates who made
ammendments to the architect/design
previously made by Sheikh Saeed.
Cont’d
Scope of work includes:
 Soft landscaping & Protection Works
 Light poles and decorative lights
 Children Playing fixture
 Foot Paths
 Jogging tracks
 Car parking for 1030 vehicles
 Bar B Q
 Food Courts
 Benches/tables
Cont’d
 Golf Carts(6 in number)
 Open theatre
 Promenade
 Masjid (1 in number)
 Waiting Halls
 First Aid/Lost & found Center
 Battle Fields.
 Entertainment hubs(Hotels, Shopping Malls etc)
 Golf Club
Cont’d
 Horse Riding
 Walk in Aviary
 Ladies club
 Arts and craft village.
 Boating (25 boats)
 Tourist trains(2 in number)
 Scooters(25 in number)
 Miscellaneous works
 The time which was allocated was 4.5 years for
both phases but due to flooding in Rawal Dam
sometimes they had to wait for 2 months to
restart the work as they had no other
alternative.
 For first phase allocated time was 2.5 years and
it was beautifully done within that time despite
of floods due to which they had to stop the work
for quite a long time but due to highly efficient
workers they came up with those breaks and
succeeded in completing the project on time.
Capital cost estimates are: Rs. 357.644 million
for first phase and Rs.1100 million for second
phase and it is managed or distributed in these
departments:

 Golf Carts estimate is Rs.8 million.


 Soft Landscaping Rs.33.400 million.
 E&M works Rs.67.690 million.
 Parking, a Food court, service road cost is
Rs.146.809 million
Cont’d
 Salaries of Staff are Rs.5.504 million.
 Consumable store is Rs.2.202 million
 Work through contract is Rs.14.310 million.
 Fencing Cost is Rs.10.125 million
 Tube well Cost is Rs.6.00 Million.
 Wooden garden cost is 3.00 million.
 Round about at old murree road and carpeting
on existing road cost is Rs.10.00 million.
 The Quality check is through Internal
Audits as CDA has its own department for
it.
 They have their own testing labs for
engineering tests.
 Another Audit is done by Concurrent Audit
Lahore once a year this is external audit
 Communication was mostly done through
documentation and “work order book". In
this book daily work orders were written
or if any work is done uncaringly then the
Engineer of CDA would write that down on
that book and then get it signed by the
Labour or engineer of constructor working
over there at that time and will allocate
them the time span to get it fixed.
 The only risk is that of flood in Rawal dam
and for that they have got the labour
insured of constructors by ordering the
constructors to get their labours insured
themselves.
The projects in phase one has been almost
done whereas in second phase work is in
process.
 Soft landscaping & Protection Works
(done)
 Light poles and decorative lights (done)

 Children Playing fixture (done for first


phase but in process for second phase)
 Foot Paths (done)
Cont’d
 Jogging tracks(done)
 Car parking for 1030 vehicles(done)
 Bar B Q(done)
 Food Courts(done)
 Benches/tables(done)
 Golf Carts(done)
 Open theatre(done)
 Promenade(done)
 Masjid(done)
Cont’d
 Waiting Halls (done)
 First Aid/Lost & found
Center (done)
 Battle Fields. (in process)
 Entertainment
hubs(Hotels, Shopping
Malls etc) (in process)
 Golf Club (in process)
 Horse Riding Race course
(in process)
Cont’d
 Walk in Aviary (in process)
 Ladies club (in process)
 Arts and craft village. (in process)
 Boating (done)
 Tourist trains (done)
 Scooters (done)
 Miscellaneous works
 At present they are working on second phase
which is an extension to phase 1. These
extensions up to an area of 75-100 acres costing
Rs.1100 million in which consultant is Rizwan
baig and CDA will just provide the Infrastructure
that includes roads, water supply, and electricity
else all is privatized into different sectors where
private owners will invest money and will make
different entertainment sectors like:
Cont’d
 battle fields
 dirt bikers
 car racing for minors and mature
 golf club, ladies club,
 art and craft village
 horse riding
 Entertainment hub
Cont’d
 Walk in aviary which is additional project not included in
phase 1 or 2 as its total area is 4 acres costing Rs.71
million and it will be leased later on via Pre-qualification.
Its maintenance will be self generated as who so ever will
take it for lease will maintain it under checks of CDA
member environment.
 Capital Development Authority (CDA) has unveiled a plan
of running a train in the area that would be a 30-minute
ride. Although the train service is already operational, at
the moment it operates only from the parking lot to the
lakeside and back, a fairly short distance.
 As Lake View Park is a public park so CDA
itself doesn’t do any marketing or
advertising rather those who take different
sectors on rent for festivals etc and those
who have been leased different sectors
like boating scooting, they do marketing in
their own personal interest.
 Being university students of Bachelors,
information was given quite reluctantly by
the regarding personnel.
 Information providers were unwilling to
disclose the unofficial information.
 Unavailability of procurement
management information because officials
were reluctant to disclose any such
information.
Cont’d
 Despite of our full effort, Being students
and doing a project on Lake View Park for
the first time, we may have missed out
some further information needed for this
project.
 Due to lack of information available
regarding stake holders, analysis of them
was not possible.