0% found this document useful (0 votes)
135 views8 pages

MKV Fenne: Pit Navigator Control of Secondary Air Control at

The PiT Navigator software system from Powitec controls secondary air distribution at various plants to optimize combustion processes. At the MKV Fenne plant, it reduced excess air from 1.28 to 1.15, saving on coal and flue gas handling costs. Plant operators confirmed that PiT Navigator met expectations and improved flexibility. It has also increased boiler efficiency by 0.3% at the Tiefstack plant in Hamburg and reduced unburned carbon in ash by 0.8-1.2% at the Seocheon plant in South Korea.

Uploaded by

bobcandy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views8 pages

MKV Fenne: Pit Navigator Control of Secondary Air Control at

The PiT Navigator software system from Powitec controls secondary air distribution at various plants to optimize combustion processes. At the MKV Fenne plant, it reduced excess air from 1.28 to 1.15, saving on coal and flue gas handling costs. Plant operators confirmed that PiT Navigator met expectations and improved flexibility. It has also increased boiler efficiency by 0.3% at the Tiefstack plant in Hamburg and reduced unburned carbon in ash by 0.8-1.2% at the Seocheon plant in South Korea.

Uploaded by

bobcandy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 8

PiT Navigator control of secondary air

Control at MKV Fenne

The graphs
show the
manipulation of
the secondary
air per burner

Page 1, July 2005 www.powitec.de


Results in the plant MKV Fenne

Since summer 2005 the following optimisation targets


was reached and are used for the payment to Powitec:
- Optimisation lambda, from 1,28 down to 1,15
Additonal process performance:
- Reduced slagging on the burner mouth /
optimised boiler availability
- Increased flexibility in charge of used coal types /
larger coal band
Dirk Kiehn, Production Manager:
“Steag Saarenergie confirms that the PiT Navigator
reaches their expectations and is very satisfied with the
system performance and benefits.
The Powitec system is flexible and very easy to use and
our operators have high confidence in it!”
Page 2, July 2005 www.powitec.de
Target at Fenne plant, Germany
Target Prio 1:
- Lambda: n 1,28 -> 1,15

First basis for Performance Reduction of excess air from 1,25 to 1,24 means:
Contracting payment  Reduction of flue gas amount (198 kg/sec)
Quality function Lambda: of 1,6 kg/sec
This 1,6 kg/sec must be not upheated any
more around 150°C
30 €/h

 Reduction 289 kJ/sec


 Considering a coal with CV=29,3 MJ/kg, means
a reduction of 36 kg coal/h
 Considering a coal price of 50 €/t this finalises
in 1,80 €/h less costs!
1,24
1,80 €/h
0 €/h

1,14 1,25
Lambda

Page 3, July 2005 www.powitec.de


PiT Navigator at Vattenfall Tiefstack plant, Unit 1
Tiefstack Power Plant, Hamburg, Germany
operated by HEW, Vattenfall group
2 x 252 MW units, import coals, Base-load
2 front wall firing boilers with 6 burners (3 mills
/levels).
PiT Navigator controls the combustion air
distribution per burner since June 2004 with 6
cameras totally.

Result: 0,3% increase of boiler efficiency

Mill 30

Mill 20

Mill 10

Air left Air right

PiT Multisensor
air
Page 4, July 2005 coal www.powitec.de
South Korea: Seocheon TPP, Komipo

Seocheon Thermal Power Plant Unit 1 & 2


2 x 215 MW units, Anthracite coal, Base-load

Seocheon Thermal Power Plant, was the first


power plant which was constructed to use the
low-grade high ash (50%) domestic coal. It is
operated by Korean Midland Power Ltd (Kepco).

The capacity is 400,000 kW (200,000 kW x 2). Plant #1


was completed in 1983; and Plant #2 in 1983 by
DOOSAN, Retrofit 2004/2005 (both units) by
FW/ABB.

PiT Navigator controls the combustion air


distribution per windbox (4pcs.) since May 2005
with 4 cameras per boiler with 40 burners.

Result: 0,8% (TPP1) and 1,2% (TPP2) less of


unburned carbon in ash

Page 5, July 2005 www.powitec.de


2 Slag tap fired boilers, each with 4 PiT Multisensors

PiT Multisensor

Page 6, July 2005 www.powitec.de


PiT Navigator system for tangential fired units ABB-CE

500 MW boiler ABB-CE style;


Proposal with 6 cameras totally
4 cameras for the flame cyclone
2 cameras for slagging monitoring
PiT Navigator control’s level-wise aux.air dampers
in a limit of +/- 5 % air

AUX AIR
DAMPER (FF)

MILL F

PiT Multisensor view direction


air
coal
Page 7, July 2005 www.powitec.de
Corporate Profile:

Powitec Intelligent Technologies GmbH, based in Essen, Germany, was established in 2001.
In close cooperation with the Technical University of Ilmenau, the company develops software systems for customers in cement
manufacturing, waste incineration, hazardous waste disposal and power generation.
These systems are selflearning and optimize combustion processes.
Powitec provides software as well as hardware products and builds facilities all over the world. Powitec solutions deliver benefits such
as energy efficiency, reduced emissions, improved availability, reductions in the use of primary and secondary fuels and quality
management.

For more information please visit our web side www.powitec.de or contact our sales office:

Powitec Intelligent Technologies GmbH


Im Teelbruch 134 b
45219 Essen, Germany
Fon: +49 (0)2054-93762-0
Fax: +49 (0)2054-93762-22
E-Mail : [email protected]

Page 8, July 2005 www.powitec.de