Nestlé Continuous Excellence: Goal Alignment

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 38

Nestlé Continuous Excellence

Goal Alignment
Basic Problem Solving “Go-See Think Do and BDA”
Coaching Calibration
Updated 12/28/16

Mike Karpe 2016


Agenda
Review and Changes for 2017
Calibrate to the Coaching Tools
Understand the Deliverables of GSTD
Review Common Mistakes

Go-See Think Do 2
What Is a Coach?
Does Does Not
• Ask open ended questions • Steer team to a solution
• Keep team following the • Actively participate in
tool GSTD/BDA beyond coaching
• Coach each section and not • Take actions from
just at the end GSTD/BDA
• Use evaluation tool as the • Need to have knowledge on
guide the problem
• Challenge root cause
Current GSTD
Assessors
What they are: Advanced Problem Solving Experts able to certify
coaches and conduct official GA calibrations

Process: Conduct calibration, align to expectation of FRM 1299,


conduct a certification through observation.

Current Assessors

Go-See Think Do 4
Changes/Updates

Go-See Think Do 5
BDA / GSTD Has Merged Into One Form

Go-See Think Do 6
Roles and Responsibilities

Team Operator Mechanic GSTD BDA


GSTD BDA Coach Coach
Leader Leader
IR X X X X
(GoSee)
BDA X X
Think X X X X

DO X X X X

Go-See Think Do 7
Sign-off on Assessment Tool

Process Owner

BU Leader

Op’s Manager

Go-See Think Do 8
Focus will be on RTL
The GSTD/BDA should be started immediately
when the problem occurs. Without it we loose the
evidence we can collect during the GEMBA

Go-See Think Do 9
Metrics Reported

 80% of GSTD’s will be launched real time


(within the shift the trigger was met).
 80% of GSTD’s will be operator led
 80% of GSTD’s launched were completed
and turned in
 80% effectiveness of GSTD’s completed

Go-See Think Do 10
Hands On

Coach will provide a GSTD/BDA and their


coaching form for use during calibration
• Calibrate to GA requirements
Discuss Findings with original Coaching
sheet

Go-See Think Do 11
4 Mandatory Deliverables of GSTD/BDA

Results-were they achieved (verification step)


Standardization-new activities captured in a
standard to keep changes in place
Reapplication-Training done with impacted team
and learnings applied to similar processes
throughout the organization
Capability building-team members gained
knowledge of problem solving tools and activities

Go-See Think Do 12
Problem Description

The problem description should be a brief


description of the problem and the trigger /
measure impacted

Go-See Think Do 13
Interim Correction

The interim correction is what you are doing to


continue safe quality production until the
GSTD/BDA is complete
The interim correction is not what you did to fix
what already happened
Action needs to be completed immediately if
possible
Go-See Think Do 14
Understand the Problem

Should be a map of the process including what


happened before and after the location of where
the problem occurred.
The location of the problem should be clearly
marked
Information was gathered through GEMBA

Go-See Think Do 15
Problem Statement

What-derived from the problem description


Where-derived from process flow
When-date and time
Who-person(s) involved in the occurrence
How much/many-number affected, how much
time, $ amount, what is relevant to the problem
Combine into one statement using all the 4W1H

Go-See Think Do 16
Standards Review

There needs to be a physical check of standards


Verification of standards are being followed
happens though Gemba
Verify training (DC or TA’s can do this)
Review standards as a team to see if they are
easy to understand
Verify all equipment is within specification
(maintenance can assist)
Go-See Think Do 17
Location of Failure (BDA)

FLOC number has properly been identified and


recorded on form
Work Order has been completed and number
recorded on form

Go-See Think Do 18
Restoration Activity and Process Adjustments
(BDA)

Form contains all activities and adjustments to


restore operation

Go-See Think Do 19
Replacement Components (BDA)

Failed components are kept, properly stored, and


accessible to the BDA team
Equipment and damage codes have been
properly identified and documented on the form

Go-See Think Do 20
Sketch of Failed Component (BDA)

A diagram of the failed component had been


documented (sketch and/or photo)
Outside forces have been included in diagram
(Air, Flow, Torque…)
Failure identified using arrows, circles…

Go-See Think Do 21
Impact Quantification (BDA)

Total loss has been calculated properly assessing


all loss factors necessary

Go-See Think Do 22
Gap Assessment (BDA)

Gaps have been identified by evaluating


difference between ideal conditions and current
conditions through GEMBA

Go-See Think Do 23
Brainstorming (GSTD Specific)

The team should have the proper resources


needed to conduct this session
The entire team needs to participate in
brainstorming / brainwriting

Go-See Think Do 24
Fishbone

BDA
Basic condition items transferred to fish bone
GSTD
All possible causes should be on diagram
Only crossed off through Gemba
All categories need to be explored or discussed
Circle ideas that can’t be ruled out through Gemba

Go-See Think Do 25
5 Why

First branch of the 5 why is a cut and paste from


the identified items off the fishbone diagram
Should be multiple branches off each 5 why
Each item is verified through Gemba
Root cause has been identified (circled, color
coded…)

Go-See Think Do 26
Action Plan

Action is not to create a standard, rather the


activity you wish to place in a standard
Actions should be detailed and directly linked to
root cause.
CAUTION- Gemba items are not actions
Needs to have one person from the GSTD/BDA
team assigned to each action with a reasonable
date or completion
Status of actions are recorded
Go-See Think Do 27
Verification of GSTD/BDA
Effectiveness

If unsuccessful go back to fishbone / 5why’s or


escalate
Happens after all actions are complete
Documented on GSTD/BDA form that verification
was completed
MANDATORY DELIVERABLE OF PROBLEM
SOLVING

Go-See Think Do 28
Standards Updated / Creation

After verification new/changed activities shall be


placed in a standard to obtain static results
MANDATORY DELIVERABLE OF PROBLEM
SOLVING

Go-See Think Do 29
Knowledge Transfer

All relevant areas have transferred knowledge


Learnings have been escalated for transfer
outside the facility where necessary

Go-See Think Do 30
Problem Solving Team
Involvement / Capability Building

Were all core team members present at each


meeting and involved in all steps

Go-See Think Do 31
General Form Completion

The team has accessed the correct resources to


determining and address root cause creating
sustainable solutions
All actions that have not been closed are
captured on the appropriate OR

Go-See Think Do 32
Common Errors
The interim correction IS NOT what you did to fix
what already happened.
Interim correction IS what you will do to prevent
reoccurrence until GSTD/BDA completion

Go-See Think Do 33
Common Errors
Action items are assigned to ONE TEAM
MEMBER
Ongoing is not an acceptable status

Go-See Think Do 34
Common Errors
Failure to achieve all DELIVERIABLES

Results
Standardization
Reapplication
Capability

Go-See Think Do 35
Most Common Error
Single Most Common Error

Not using the criteria in each section of the


coaching tool to assist in coaching and
scoring the GSTD/BDA

Go-See Think Do 36
Where Can I Find the Form & Assessment Tool

Go-See Think Do 37
After GSTD Completion
Place a copy on board(s) GSTD/BDA impacted
Give the DOR a copy of the GSTD/BDA for final
review
Give either the DOR copy to NCE after review or
provide an additional copy along with the
coaching form for recording and retention.

Go-See Think Do 38