Pavement Design and Construction: Traffic Analysis
Pavement Design and Construction: Traffic Analysis
CONSTRUCTION
Traffic Analysis
Primary Pavement Design Inputs
Traffic
Pavement Material
Subgrade / Foundation
Layer Material Properties
Environment / Climate
Traffic
Traffic Analysis
Geometric design
All types of vehicles from non-motorized to motorized
From light to heavy vehicles
Pavement design
Only vehicles causing significant damage to pavement
Usually total vehicles weight greater than 3 Tons
Types of Traffic Data
5 6 7 8
9 10 11
12 13
Axle and Tire Configurations
Ac
Ac (0.3L) 2 (0.4 L)(0.6 L) 0.5227 L2 L
0.5227
Example for Dual Wheel Setup
67 kN 27 kN
15,000 lb + 6,000 lb =
0.49 ESALs
0.48 ESAL 0.01 ESAL
BIG TRUCK
151 kN 151 kN 54 kN
34,000 lb + 34,000 lb + 12,000 lb =
2.39 ESALs
1.10 1.10 0.19
ESAL Comparison
Acme Van
Lines
3,500- 1
5,000
Load Equivalency Factor
1
G/ 18 = -0.1761/1.3709 = -0.12845
LEF = 7.67 7.
0.1305
AASHTO LEF for Pt = 2.5 (SA - Flexible)
Pavement Structural Number
Axle
Load, 1 2 3 4 5 6
kips*
3584
Truck Factor 2.76 (for 1300 truck counts)
1300
LEF Example
Assume a logging truck has three axles:
Truck tractor
o Steering axle (single axle) = 14,000 lb (62.2 kN)
o Drive axle (tandem axle) = 34,000 lb (151.1 kN)
Trailer
o Pole trailer axle (tandem axle) = 30,000 lb (133.3 kN)
The total equivalent damage by this truck is (p t = 3.0, SN= 3):
If a pavement is subjected to 100 of these trucks each day (in one direction) for 20
years (5 days per week), the total ESAL for this truck would be: (5 day/7 day)(365
days/year)(20 years)(100 trucks/day)(2.41 LEF/truck) = 1,256,643 ESAL
Truck Factor (Tf) for 165 Trucks
Axle Load Traffic EALF Number of Axles Total ESAL
Single Axle
Under 3000 0.0002 0 0.000
3000-6999 0.0050 1 0.005
7000-7999 0.0320 6 0.192
8000-11999 0.0870 144 12.528
12000-15999 0.3600 16 5.760
26000-29999 5.3890 1 5.389
Tandem Axle
Under 6000 0.0100 0 0.000
6000-11999 0.0100 14 0.140
12000-17999 0.0440 21 0.924
18000-23999 0.1480 44 6.512
24000-29999 0.4260 42 17.892
30000-32000 0.7530 44 33.132
32001-32500 0.8850 21 18.585
32501-33999 1.0020 101 101.202
34000-35999 1.2300 43 52.890
255.151
400000
300000
Projected number of
single axles
200000
100000
0
2000 2010 2020 2030 2040
Year
Home Problem # 1
An 8-lane divided highway is to be constructed on a new alignment.
Traffic volume forecasts indicate that the AADT in both directions
during the 1st year will be 12,000 with the following vehicle mix:
2 Axle passenger cars (1 kip/axle) = 50%
1 + 2 (tandem) axle trucks (6 + 28 kips/axle) = 33%
1 + 2 + 3 axle trucks (6 + 20 + 40 kips/axle) = 17%
The vehicle mix is expected to remain the same throughout the
design life. Expected annual traffic growth is 4%. Determine
ESAL for 20 year design period.
Questions ???