Material Variance: Unit 2 Standard Costing (MA-06101355)

The document provides information to calculate material variances for a manufacturing process. It gives the standard and actual quantities and costs of materials A, B, and C used to produce 10 units. There is a material cost variance of Rs. -2,225, a material price variance of Rs. 1,875, and a material usage variance of Rs. 350. The material mix variance is Rs. 900 unfavorable and the material yield variance is Rs. 1,250 favorable.

Uploaded by

mahendrabpatel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views12 pages

Material Variance: Unit 2 Standard Costing (MA-06101355)

The document provides information to calculate material variances for a manufacturing process. It gives the standard and actual quantities and costs of materials A, B, and C used to produce 10 units. There is a material cost variance of Rs. -2,225, a material price variance of Rs. 1,875, and a material usage variance of Rs. 350. The material mix variance is Rs. 900 unfavorable and the material yield variance is Rs. 1,250 favorable.

Uploaded by

mahendrabpatel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Material Variance

Unit 2 Standard Costing


(MA-06101355)
Practical 1
• The standard mix to produce one unit of product is as follows:   
• Material A    60 units @ Rs. 15 per unit = Rs.     9,00
• Material B    80 units @ Rs. 20 per unit = Rs.    1,600
• Material C    100 units @ Rs. 25 per unit = Rs.    2,500         
240 units                         Rs.  5,000
During the month of April, 10 units were actually produced and
consumption was as follows:
• Material A    640 units @ Rs. 17.50 per unit = Rs.    11,200
• Material B    950 units @ Rs. 18.00 per unit = Rs.    17,100
• Material C    870 units @ Rs. 27.50 per unit =Rs.     23,925       
2,460 units             Rs.     52,225
Calculate all material variances
Solution
Material Standard for 10 units Actual for 10 units
 
A
B
C
Total
Solution
Material Standard for 10 units Actual for 10 units
  Unit Rate Amt. Rs. Unit Rate Amt. Rs.
(SQ) (SP) (AQ) (AP)

A
B
C
Total
Solution
Material Standard for 10 units Actual for 10 units
  Unit Rate Amt. Rs. Unit Rate Amt. Rs.
(SQ) (SP) (AQ) (AP)

A 600 640
B 800 950
C 1,000 870
Total
Solution
Material Standard for 10 units Actual for 10 units
  Unit Rate Amt. Rs. Unit Rate Amt. Rs.
(SQ) (SP) (AQ) (AP)

A 600 15 640 17.5


B 800 20 950 18
C 1,000 25 870 27.5
Total  
Solution
Material Standard for 10 units Actual for 10 units
  Unit Rate Amt. Rs. Unit Rate Amt. Rs.
(SQ) (SP) (AQ) (AP)

A 600 15 9,000 640 17.5 11,200


B 800 20 16,000 950 18 17,100
C 1,000 25 25,000 870 27.5 23,925
Total
Solution
Material Standard for 10 units Actual for 10 units
  Unit Rate Amt. Rs. Unit Rate Amt. Rs.
(SQ) (SP) (AQ) (AP)

A 600 15 9,000 640 17.5 11,200


B 800 20 16,000 950 18 17,100
C 1,000 25 25,000 870 27.5 23,925
Total 2,400   50,000 2,460   52,225
Solution
• (1) Material Cost Variance = (SQ X SP) –(AQ X AP)
=Rs. 50,000 – Rs.52,225 MCV  
= Rs. -2,225(A)
• (2) Material Price Variance =(SP X AQ) – (AP X AQ) OR
= (SP- AP) X AQ
Material A = (15‐ 17.50) x 640 = Rs. 1,600 (A)
Material B = (20 – 18 ) x 950 = Rs. 1,900 (F)
Material C = (25 – 27.50) x 870 = Rs. 2,175 (A)
MPV = Rs.1,875 (A)
Solution
• (3) Material Usage Variance = (SQ X SP) – (AQ X SP) OR
= (SQ- AQ) X SP
Material A = (600 – 640) x 15 = Rs. 600(A)
Material B = (800‐ 950) x 20 = Rs.3,000 (A)
Material C = (1,000 – 870 ) x 25 = Rs. 3,250 (F) MUV
                                            = Rs.350 (A)
• CHECK POINT
• MCV = MPV + MUV
• Rs. 2,225 (A) = Rs. 1,875 (A) + Rs.350 (A
Solution
• (4) Material Mix Variance = (RSQ X SP) – (AQ X SP)
Revised Standard Quantity = (TAQ / TSQ) X SQ
2460x600
Material A = = 615 Units
2400
2460x800
Material B = = 820 Units
2400
2460x1,000
Material C = = 1,025 Units
2400
• Material A = (615 ‐ 640) x 15 = Rs.375 (A)
• Material B =(820 ‐ 950) x 20 = Rs. 2,600 (A)
• Material C = ( 1,025 ‐ 870) x 25 = Rs. 3,875 (F)
• MMV = Rs. 900(F)
Solution
• (5) Material Yield Variance = (SQ- AQ) X SC
• SC= Total SC ÷ Total SQ
• =50000/2400 = 20.83
• MYV = (2400 – 2460) X 20.86
• MYV = 1250 (A)

• CHECK POINT
• MVV= MMV + MYV
• -350 = 900 + (-1250)