Installing Procured & Drawing of Power Transformer: Module - 5
Installing Procured & Drawing of Power Transformer: Module - 5
Power Transformer
MODULE -5
1. INTRODUCTION
This part of Manual lists the typical drawings submitted by manufacturer to the customer for
approval and reference.
The purpose of these drawings is to ensure that transformers being planned for manufacture
meet the guaranteed technical particulars as per order, functional requirements as per
customer specifications and interfaces at site.
The Manual lists up the minimum details required in drawings and can be used as a check list
for manufacturers, customers and consultants while preparing, verifying and approving these
contract drawings.
2. LIST OF CONTRACT DRAWINGS
Drawings list should have the revision status and date of
submission / approval. Technical objectives
1. Rating & Diagram Plate
2. General Arrangement drawing for Transformer
3. List of Accessories
4. Bill of Materials
5. Foundation Plan
6. Bushing Details
7. Transport Dimensions
8. General Arrangement Drawing of Marshalling Box/ Cooler Control
RTCC Remote Tap Control Cubical Panel DM Digital Metering Panel
3. GENERAL GUIDELINES
a. All drawings shall be “to scale”
b. Drawings can be either in first angle or third angle projection. Angle of projection
shall be mentioned in drawing. Preferred projection is First Angle Projection.
c. Title block shall contain customer reference (Customer name, A1,B1 ets” number),
Transformer MVA rating and voltage.
d. All drawings may be either in A3 or A4 size for easier up-keeping.
e. Drawings shall also be submitted in soft form.
4. MINIMUM DETAILS REQUIRED IN DRAWINGS
4.1 Rating & Diagram Plate
Rating & Diagram Plate drawing shall be in line with the guide lines in
Transformer Manual.
Plate can be made in one part or two. In case of two plates, cross reference
shall be given in both sheets.
Keep blank columns to fill after testing for % Impedance, measured losses,
weight schedule and oil volume for first filling at site.
Weight schedule shall contain:
(a) Core - coil assembly weight
(b) Tank & fittings weight
(c) Oil weight
(d) Total Weight,
(e) Transport weight
(f) Net copper weight
Implementation
Tasks/activities
Procedures
Tools/technology
Project change control process