Progress Status Report Aug, 2020: Project Overall

The document provides a progress report for the ABC Building project from August 2020. It shows that the overall project completion is currently at 36% complete, with 389 elapsed days out of a planned 793 total days. This has resulted in a total delay of 23 days. Phase 1 of the project is 55% complete with 45 days of delay, while Phase 2 is 50% complete with a 23 day delay. The engineering work is 74% complete while procurement is 62% done. Various construction work packages range from 10% to 88% completion.

Uploaded by

Books Thiru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views10 pages

Progress Status Report Aug, 2020: Project Overall

The document provides a progress report for the ABC Building project from August 2020. It shows that the overall project completion is currently at 36% complete, with 389 elapsed days out of a planned 793 total days. This has resulted in a total delay of 23 days. Phase 1 of the project is 55% complete with 45 days of delay, while Phase 2 is 50% complete with a 23 day delay. The engineering work is 74% complete while procurement is 62% done. Various construction work packages range from 10% to 88% completion.

Uploaded by

Books Thiru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 10

ABC Building Project Calendar

Progress Status Report


Aug, 2020

00 5%
Project Overall
Elapsed Days  Planned Completion Date: 31 st May 2021
Remaining Days 36%  Actual Completion Date: 23 June 21
160
160  Elapsed Days: 389 D
480 Delays 58%
 Remaining Days: 304 D
 Total Delay: 23 D

320

3%
Phase 1
elapsed days
 Planned Completion Date: 31 st Mar 2021
 Actual Completion Date: 15 Apr 21
Remaining Days
43%
55%
 Elapsed Days: 386 D
delay
 Remaining Days: 227 D
Elapsed Days Remaining Days Total Delay  Total Delay: 45 D

389 D 304 D 23 D
1%
Phase 2
Elapsed Days Remaining Days  Planned Completion Date: 31 st May 2021
 Actual Completion Date: 23 June 21
Delays
49% 50%  Elapsed Days: 389 D
 Remaining Days: 304 D
 Total Delay: 23 D
ABC Building Progress Outlook
Progress Status Report
Aug, 2020 ABC Building Project

Engineering Construction

Shop Drawings Procurement Phase 1 Phase 2 Externals

Shop Drawings Work Packages

Concrete W.P &


Works Insulation
Achieved
74 88%
Works
Remaining 60%
%
Conveying Mechanical Electrical
Procurement System Works Works
2% 37% 35%

Achieved 62 External Finishing


Works
Works
Remaining % 10% 22%
ABC Building ff
Progress Status Report k-o
ic
Aug, 2020
e c tK
j g n
Pro etin uctio
Me n str
l-19 g Co
- Ju tin
09 a r
St rks
Wo P
-19 f ME
A ug g o
01- a r tin g
St rks shin
i
Wo F in
20 of
Jan ng
tur
e
16- ti
Milestones
r c
Sta rks Str
u
Wo no
f
eb -20 e tio
F l
01- mp
Co orks a pe
sc
W a nd
0 L
o v-2 g of
N rtin
09- t a
S rks
w o n g & orks
a r-21 Testi ing w
g
30-
M
a rtin ission ate
t
S mm n D
C o l e tio
pr -21 Co mp
A
15- j ect
Pro
1
ay-2
M
31-
ABC Building Time Management
Progress Status Report
Aug, 2020 Jul-19 Oct-19 Jan-20 Apr-20 Jul-20 Oct-20 Jan-21 Apr-21 Pl. Finish Ac. Finish Delay Item
31-May-21 16-Jun-21
                                                23 Total
                                                1-Apr-21 15-May-21 44 Phase 1
                                                31-May-20 30-Sep-20 122 Structure
Time Schedule                                                 15-Jun-20 15-Oct-20 122 Insulation & WP
1-Mar-21 15-Apr-21 Mechanical
update  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  1-Mar-21 15-Apr-21
45
45 Electrical
                                                1-Apr-21 15-May-21 44 Finishing
Elapsed Days 15-Mar-21 14-Apr-21
                                                30 Doors & Windows
389 D                                                 1-Feb-21 22-Mar-21 49 Conveying Sys
                                                22-Mar-21 1-Apr-21 10 External
Remaining Days                                                 31-May-21 16-Jun-21 16 Phase 2
304 D                                                 30-Jul-20 7-Nov-20
14-Aug-20 22-Nov-20
100 Structure
                                                100 Insulation & WP
Total Delay                                                 30-Apr-21 9-Jun-21 40 Mechanical
30-Apr-21 30-May-21 Electrical
23 D  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  31-May-21 16-Jun-21
30
18 Finishing
                                                14-May-21 3-Jun-21 20 Doors & Windows
                                                2-Apr-21 21-May-21 49 Conveying Sys
                                                21-May-21 31-May-21 10 External
                                                31-May-21 16-Jun-21 16 Landscape
                                                22-Mar-21 7-Apr-21 16 Hard-scaping
                                              31-May-21 16-Jun-21 16 Softe-scaping
ABC Building 100,000,000.00 89,352,170.
47
10,000,000.00
81,843,208. 9,000,000.00
67
Planned Value
100,000,000.00

90,000,000.00
Progress Status Report 80,000,000.00 Earned Value
8,000,000.00 80,000,000.00
Aug, 2020 Acc. PV
7,000,000.00 Acc. EV 70,000,000.00
60,000,000.00
6,000,000.00 60,000,000.00
40,000,000.00 5,000,000.00 50,000,000.00

Work 20,000,000.00
4,000,000.00

3,000,000.00
40,000,000.00

30,000,000.00

Performance -
PV EV 2,000,000.00

1,000,000.00
20,000,000.00

10,000,000.00

- -

89.3% 1.00
1.00
Planned Schedule Performance Line
0.97 0.97

0.94
Planned Value 0.94 0.93
0.92
89,352,170.4 0.91 0.91
0.90
0.91
0.89 0.89 0.89 0.89
0.88
0.87

0.85
81.8%
Completed
The Project is behind the schedule according to the comparison
Earned Value SPI made to the accumulative planned value against the
accumulative earned value from the project start up to this
81,842,008.4 0.92 update. However, the performance line is showing that there
was a trend for a good performance during the last 4 months.
ABC Building
Progress Status Report
Aug, 2020
Progress Narrative
 100% Excavation work completed on 20 Aug 19, and the work moved to piles execution
on 21 Aug 19
 Piles Execution has completed 100% on 11 Nov 19. 1050 Pile achieved within 90 days
 In 12 No 19, the structural Skelton works have been started, and up to date, the progress
of the structure works recorded 100% work done in phase 1. Structure works for phase
2
recorded 85%. The structure works for annex building still under progress with about
25% Achievement.
 30,000 m3 Concrete has been casted & 3000 Tone of steel rebar have been
fixed and assembled.
 Block works started on 10 Jan 20 and 97% completed up to date
 Water Proofing Activities are running in parallel with the concrete works. For foundation , it
is estimated that 95% of the WP works are completed.
 Electrical works started on 16 Jan 20 in phase 1, the work started by installing the
conduits and cable tray for in the ground floor, and the work achieved up to date is almost
95% in phase 1.
 Electrical Work has reached to the stage of installing cables and wires in phase 1 & 2 with
progress achievement reached up to 25%
 Mechanical works started on 20 Jan 20 by installing the Water Supply and drainage
pipes which reached up to 76% in phase 1 & 22% in phase 2
 HVAC work started on 23 Jan 2020 in phase 1 with 33% completed up to date. Phase 2
recorded 15% in ground floor..
ABC Building Time Management
Progress Status Report
Aug, 2020 50
45
44
39 40
40
35

30
Delay Accumulation 24

Delay Analysis 20
10 12 11 13
10
10 9
3
0
Total Delay = 35 days 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec 1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug

Q1=12 d Q2=10 d Q3=39 d Q3=35 d


COVID-19 = 20 Progress
delay = 9 The first 3 months By the month of
days days of the project
COVID-19 For the month of
Jan. 2020, the impacted with 20 Aug, 2020
have recorded up total delay days in the - Total delay is 35
to 10 days due to reached to 10. project total d
VO & Bad Authorities a progress delay there is 4 days delay, and by the - COVID Delay is
Changes = weather = Approval = progress month of May, 20 days
4 days 0 days 2 days
recovery and 4 2020, the overall - VO impact is 4
days due to the delay has Days
VO made for reached up to 44 - Authorities
level days. Approval for a
modifications night-shift
concrete casting
2 days
- Progress delay
impacted with 9
days
Structural Package Finishing Package Elec. Package
ABC Building 35,000,000.00 30,570,783.30,570,783.

30,000,000.00
80 80
30,000,000.00

23,878,738.
25,000,000.00 04
16,000,000.00

14,000,000.00 13
13,676,801.
12,646,192.
78
Progress Status Report 19,794,706. 12,000,000.00
Aug, 2020 25,000,000.00 20,000,000.00
96
10,000,000.00
20,000,000.00
15,000,000.00 8,000,000.00
100,000,000.0089,352,170.
47 81,843,208. 15,000,000.00
67 6,000,000.00
10,000,000.00
80,000,000.00 10,000,000.00
4,000,000.00
5,000,000.00
60,000,000.00 5,000,000.00 2,000,000.00

- - -
40,000,000.00 ACC. PV ACC. EV ACC. PV ACC. EV ACC. PV ACC. EV

20,000,000.00
Package 100% Completed Package 40% Completed Package 80% Completed

-
Acc. PV Acc. EV

Mech. Package
16,000,000.00 W.P Package Ex. Finish Package
13,785,504. 2,500,000.00
81 12,934,653. 6,000,000.00 5,417,530
14,000,000.00 2,022,812.6 .00
87 9
2,000,000.00 1,786,474.1
5,000,000.00
81.5% 12,000,000.00

10,000,000.00
0

4,000,000.00
3,874,058
.56
1,500,000.00
Completed
8,000,000.00
3,000,000.00
6,000,000.00 1,000,000.00

Structueal WP 2,000,000.00
4,000,000.00
Mechanical Electrical 500,000.00
Finishing Façade & CW 2,000,000.00 1,000,000.00

- - -
ACC. PV ACC. EV ACC. PV ACC. EV ACC. PV ACC. EV

Package 80% Completed Package 90% Completed Package 25% Completed


ABC
Building
Progress Status Report
Aug, 2020

Ahmed Abdelfattah
Project Control & Planning manager
www.ahmed-Fattah.com
ABC Building
Progress Status Report
Aug, 2020

Photo Backfilling under the slab on grade is 99%


Structural works is completed The second floor slab has been 100%
ongoing with 25% Completed for for the second building, and the work completed on 22 Aug 20, and the

Gallery the first building is being prepared to block works process of curing is under progressing

RC columns for the Annex Building Metal Duct Material Delivered Block Works is under progress for the
100%, and the fabrication is under Building #01 with progress reached to
have ben casted with 68%
Completed , and the curing process progress with 33% Completed 45%
is under progress