KAIZEN

Objective Name of the Employee / Team Department

Introduction of AAC Blocks Abhinav Tewari PROJECTS

Patri Dileep PROJECTS

Vikram Singh PROJECTS


Before Implementation (As – Is Process)
Current Practice / Concern :

1. Earlier Red Bricks of size 230mm x 115mm x 75mm were used for the construction of sub-station buildings.
2. Red Bricks are resistive to fire for 2 Hrs.
3. More water is wasted on curing process.
4. No Energy saving (In terms of Heating & Cooling Load)
5. No reduction in dead weight, hence no saving in steel & concrete.

Please use this space for Snapshot or Please use this space for Snapshot or
Drawing Drawing
After Implementation
Changes Made / Solution:

1. Now, AAC (Autoclave Aerated Concrete) Blocks of size 625mm x 240mm x 75mm are being utilized in the
construction of substation buildings.
2. Autoclaved Aerated Concrete(AAC) Blocks are made out of Fly ash, Cement, Lime, Gypsum, Aluminium Powder &
Water. Making these blocks does not cause any environmental pollution. Talking about AAC blocks, we can say that
these blocks are smooth and almost 8 times bigger than the normal bricks and yet, lighter than the normal bricks by
a huge margin.

Please use this space for Snapshot or Please use this space for Snapshot or
Drawing Drawing
Impact Parameters
Select / Highlight the Impact Parameters:

P – Productivity

Q – Quality

C - Cost

D - Delivery

S – Safety

M – Morale

Customer Satisfaction

Climate Change

Innovation

Any Other (Please Specify):


Impact Parameter (Self Audit)
Target (mentioned in the
Actual
Impact Parameter Online Form) (In % or No's)
(In % or No's)
AAC Blocks are resistive to fire for 6-7 hrs. 90% 90%
Less water is used in curing process. 100% 100%
Energy Savings of approximately 30% for heating and cooling 25% 25%
Reduction in dead weight leading to savings in steel and concrete. 80% 80%
THANK YOU