WELCOME MESSAGE
”In a single hour, the amount of power from the sun that strikes the Earth is more
than the entire world consumes in an year” - US DOE
Humanity, and with it all life on earth, stands at a crossroad. Unprecedented growth
of the human population and the world economy since the Industrial Revolution have
put pressure on our planet. Series of environmental crises reach into every corner of
the globe. Together, we must join our hearts, minds and efforts to be the hero our
planet needs.
Ir. Nirinder Singh Johl
Managing Director SARE is aimed to be the pebble that will create ripples of change in the energy
TNBX Sdn. Bhd. landscape to be greener. I strongly believe we can create a better and greener future
A wholly owned subsidiary of
TNB
together. This is our responsibility and legacy for future generations.
TNB
X
Partnership
Together we can make the Establish strong partnership leveraging
difference on each others’ strengths
20% RE
BY 2025
Integrity Effectiveness
Professional Deliver strong results
relationship
among
partners
Business Plan 4
TNBX Services
Your Trusted Energy Partner
Business Plan 5
Understanding SARE
SARE with TNBX
Electricity is made at a The current is sent The electrical charge It reaches a substation, where the voltage is lowered It connects to your The electricity The electricity
generating station by huge through goes through high- so it can be sent on smaller power lines.It travels house and passes goes to the main travels through wires
generators. Generating transformers to voltage transmission through distribution lines to your neighborhood. through a meter switch board inside the walls to
stations can use wind, coal, increase the lines that stretch that measures how where breakers the outlets and
natural gas, or water. voltage to push the across the country. Smaller transformers reduce the voltage again to make much you use. or fuses protect switches all over
power long the power safe to use in our homes. These smaller the wires inside your building.
distances. transformers may be mounted on the poles, or sitting This will be billed your house from
on the ground. monthly according being
to the prevailing overloaded.
electricity tariff
regulated by
Energy
Commission of
Malaysia.
Bill = Units of
energy used X
regulated
Business Plan tariff 7
We have a brighter idea. Why don’t we generate clean electricity by installing solar PV
right on customers’ rooftop! Here is how Solar Energy Purchase (SEP) works..
Investor/asset owner will generate solar energy and sell to prosumer at an agreed solar rate per kWh generated throughout SARE contract
period. Prosumer can sell excess energy to TNB under NEM scheme.
Business Plan
*One-on-one offset means every 1kWh exported to the grid will be offset against 1 kWh consumed from the grid with gazetted tariff. The export charges are charged in descending
order (start from the highest applicable rate).
Understanding SARE for SEP
All parties’ interests are protected by SARE
Utility
Investor/Asset Prosumer
Owner
Engineering Procurement
Construction (EPC),
Companies registered as RPVI O&M Performance Businesses and government
with SEDA Covenants entities (non-residential
customers) in Peninsula
Malaysia
*RPVI = Registered PV Investor
Business Plan 9
Understanding SARE for SEP
Roles & Responsibilities
• Investor and/or Asset Owner (RPVI) will conduct energy audit, design and propose the optimum solar PV system for
installation.
• Investor and/or Asset Owner (RPVI) will invest, own and operate the solar system.
• Customer will sign a tripartite agreement called Supply Agreement with Renewable Energy (SARE) with the Investor
and/or Asset Owner (RPVI) and Tenaga Nasional Berhad.
• Customer will be invoiced based on agreement reached and financial understanding as documented in Appendix C of
the SARE agreement.
• Customer’s solar energy purchase will be billed on the same TNB email bill (e-bill) and subjected to terms & conditions
as stipulated in SARE.
• After the contract period ends, customer will own the solar PV system unless explicitly stated otherwise.
• Investor and/or Asset Owner (RPVI) will be bound via a contract with TNBX on agreed service convenants.
• SARE is independent of the Net Energy Metering scheme. The Investor/Asset Owner will ideally recommend NEM
scheme only if there is possibility of export to the grid from the customer
Business Plan 10
Customer Identification
Market potential for SEP > 18,000 MW solar rooftop potential within Peninsular Malaysia as per recent study by SEDA conducted in
2018
Places of
worship
Transpor Hospitals
t
Universities
Telco
s
Hospitalities
Financial
Shopping Data
malls Government centers
Business Plan 11
SARE Work Flow
High level work flow
Business Plan 12
General Terms in SARE
Business Non-business
Solar solution via SARE contract Outright Purchase
Solar PPA Solar (Hybrid) Solar Lease Solar Cash Solar via Loan Solar via 0% (Credit
Card)
Business Plan 13
Registration and Regulation
Self Consumption NEM LSS (> 30MW)
TNB Registration √ √ √
SEDA Registration √ Provision of information
Maximum capacity 75% of MD 1kWp to 75% of MD) for last 1 LSS1 – 50MWp
year data or declared value) or LSS2 –
60% fuse rating/CT 30MWp
Business Plan 14
SARE
Contract
Flow Chart for SARE Contract
Business Plan 16
Download and submit SARE 01 Form via email
Business Plan 17
Information Required for SARE Contracting
(Main)
Page Information Required
1. Date of Agreement
Contract cover
Front page 2. Investor/Owner Company Name and Registration No
3. Customer* Name and Registration No (for Sdn Bhd)
*Note that the customer name must be the same as the existing TNB supply contract name
Business Plan 18
Information Required for SARE Contracting
(Appendices)
Appendix Information Required
Business Plan 19
SARE (Front page)
Agreement details
STEP 02
Date of agreement
TNB
Investor/Owner
Contracting
Sign SARE contract with Customer*
customer and submit
to TNBX
Business Plan
*Note that the Customer name must be the same as the existing TNB supply contract name 20
SARE (Page 1)
Agreement details
Investor/Owne
r Customer*
Business Plan
*Note that the Customer name must be the same as the existing TNB supply contract name 21
SARE (Page 3)
Agreement details
STEP 02
Customer’s premise
Solar DC size
Contracting
Sign SARE contract with
customer and submit
to TNBX
Business Plan 22
SARE (page 25 – Attention page)
Agreement details
STEP 02
Investor/Owner
Contracting
Sign SARE contract with Customer*
customer and submit
to TNBX
Business Plan 23
SARE (Page 30 – Signing page)
Agreement details
STEP 02
TNB
Investor/Owner
Contracting
Sign SARE contract with
customer and submit
to TNBX Customer*
Business Plan
*Note that the Customer name must be the same as the existing TNB supply contract name 24
SARE (Appendix A – System specifications)
Agreement details
STEP 02
Contracting
Sign SARE contract with
customer and submit
to TNBX
Solar specifications
Business Plan 25
SARE (Appendix B – Solar meter)
Agreement details
STEP 02
Meter 1
Solar Energy Meter
location
Contracting
Sign SARE contract with
customer and submit
to TNBX
Business Plan 26
SARE (Appendix C – Commercial terms)
Agreement details
STEP 02
SEP price
Contracting (after SARE)
Sign SARE contract with
customer and submit
to TNBX
Business Plan 27
SARE (Appendix D – Description of site)
Agreement details
STEP 02
Contracting
Sign SARE contract with
customer and submit
to TNBX
Business Plan 28
SARE (Appendix E Attachment – Buyout table)
Agreement details
STEP 02
Contracting
Sign SARE contract with
customer and submit
to TNBX
Business Plan 29
NEM Application
SEDA’s NEM Application Process
High level work flow
Business Plan 31
Revenue Management
We design billing features ensuring Asset Owners’
investments are protected whilst providing good experience
In vo icin g & C o le ctio n F eatures:
t o cu s tom ers
Elements Features
Type of bill Online email bill
Frequency Monthly
Solar rate Fixed
Increasing
Decreasing
Contract tenure As per Asset Owner’s contract with customers
Minimum monthly charge As per Asset Owner’s contract with customers
Payment reminder Automated payment reminder on bill
Customer interface Coming soon:
myTNB
Self Service Portal (SSP)
Customer payment scheme Zero upfront + monthly bill on energy generated
Upfront capex instalment on bill + monthly bill on energy generated
Business Plan 33
We design billing features ensuring Asset Owners’
investments are protected whilst providing good experience
N
I TE G R AT ED BI LL
to c u s t o m e r s
Business Plan 35
Thank
You
Get in touch with us:
[email protected]
Level 13, Wisma TNB Jalan Timur, PJ
Selangor