0% found this document useful (0 votes)
86 views

Practical Process Control Using Control Station

Slide on Practical Process Control Using Control Station

Uploaded by

ShayanAli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

Practical Process Control Using Control Station

Slide on Practical Process Control Using Control Station

Uploaded by

ShayanAli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 33

Practical Process Control

Using Control Station


Prof. Doug Cooper
Chemical Engineering Dept.
University of Connecticut (Storrs)

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
1. Fundamental Principles of Process Control
Motivation for Automatic Process Control
 
 Safety First:
– people, environment, equipment
 
 The Profit Motive:
– meeting final product specs
– minimizing waste production
– minimizing environmental impact
– minimizing energy use
– maximizing overall production rate

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
“Loose” Control Costs Money
Process: Gravity Drained Tank Controller: Manual Mode

4.4
7 0 operatingconstraint
Process: Gravity Drained Tank Controller: Manual Mode

4.2
4.2
6 0

4.0
4.0
5 0
Mor e Pr o f it a bl e O perMora t ioe nPr o f i t a ble O per a t i o n

poorcontrolm eans
3.8
3.8
4 0 largevariability,so
theprocessm ustbe
operatedinaless
3.6
3 0
processvariable profitableregion

3.4 60 80 100 120 140


Time (mins)

 It takes more
80
material
100
toTime120(mins)make a 140product160thicker, so greatest
profit is to operate as close to the minimum thickness
constraint as possible without going under
 It takes more processing to remove impurities, so greatest
profit is to operate as close to the maximum impurities
constraint as you can without going over
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Tight Control = Most Profitable Operation
Process: Gravity Drained Tank Controller: Manual Mode

4.20
7 operatingconstraint
Process: Gravity Drained Tank Controller: Manual Mode

4.2
4.00
6

4.0
tightcontrolperm its
3.80
5
operationn earthe
processvariable
constraint,which
M or e Pr o fi ta bl e Oper aMtioorn e Pr o fi ta bl e Oper a tio n

3.8
4
3.60
m eansm oreprofit

3.6
3
3.40

3.4 80 100 120 140 160


Time (mins)

80 100 120 140 160


 A well controlled process has less variability in the
Time (mins)

measured process variable, so the process can be


operated close to the profitable constraint

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
An introductory example

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Consider Heating a House

Thermostat Temperature
controller sensor/transmitter
set point
TC TT
heat loss
(disturbance)
Control
signal

fuel flow
furnace 1. Measurement
valve
2. Computation/
Decision

Copyright © 2002
3. Action
Douglas J. Cooper
All Rights Reserved
Automatic Control is
Measurement  Computation  Action
Error

 Is house cooler than set point? ( T Setpoint  Thouse > 0 )


Action  open fuel valve

 Is house warmer than set point? ( TSetpoint  THouse < 0 ) 


Action  close fuel valve

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Feedback Control Loop Block Diagram:
Components and Variables for home heating

Controller Manipulated House


Controller output fuel flow to temperature
error signal furnace

Set Point T
+ Thermostat Fuel Valve Home Heating
TSP - Process

Comparator Heat Loss Disturbance

house temperature

Q d
measurement
signal

Tm Temperature T
Sensor/Transmitter

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Terminology

 Control Objective
 Controlled Process Variable
 Measured Variable
 Set point
 Error
 Controller Output
 Manipulated Variable
 Disturbances

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
General Feedback Control Loop Block Diagram

“Actual” controller
Manipulated Controlled
Controller Controller Process Process
error output variable variable

Set Point Final


+ Controller Control Process
ySP(t) - (t) o(t) Element m(t) y(t)

Comparator Disturbance
d(t)
measured variable
(feedback signal)

Measurement
ym(t) Sensor/Transmitter
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Examples
 Measurement Sensors:
temperature, pressure, pressure drop, level,
flow density, concentration

 Final Control Element:


solenoid, valve, variable speed pump or
compressor, heater or cooler

 Automatic Controllers:
on/off, PID, cascade, feed forward, model-
based Smith predictor, multivariable, sampled
data, parameter scheduled adaptive control

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
3. Graphical Modeling of Dynamic Process Data
Process Behavior and Controller Tuning
 Consider cruise control for a car vs a truck
– how quickly can each accelerate or decelerate
– what is the effect of disturbances (wind, hills, etc.)
 Controller (gas flow) manipulations required to maintain set point
velocity in spite of disturbances (wind, hills) are different for a car
and truck because the dynamic behavior of each "process" is
different
Dynamic behavior 
how the measured process variable responds over time to changes in
the controller output and disturbance variables

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Understanding Dynamic Process Behavior
 To learn about the dynamic behavior of a process, analyze
measured process variable test data

 Process variable test data can be generated by suddenly


changing the controller output signal

 Be sure to move the controller output far enough and fast


enough so that the dynamic behavior of the process is clearly
revealed as the process responds

 The dynamic behavior of a process is different as operating


level changes (nonlinear behavior) so collect process data at
normal operating levels (design level of operation)

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Modeling Dynamic Process Behavior
 The best way to understand process data is through modeling

 Modeling means fitting a first order plus dead time (FOPDT)


dynamic process model to the data set:
dy (t )
P  y (t )  K P u (t   P )
dt

where:
y(t) is the measured process variable
u(t) is the controller output signal

 The FOPDT model is low order and linear so it can only


approximate the behavior of real processes

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
FOPDT
 When a first order plus dead time (FOPDT) model is fit to
dynamic process data
dy (t )
P  y (t )  K P u (t   P )
dt
 

 The important parameters that result are:


– Steady State Process Gain, KP
– Overall Process Time Constant, P
– Apparent Dead Time, P

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
PID Tuning
Guide

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
The FOPDT Model is All Important
 model parameters (KP, P and P) are used in correlations to compute initial
controller tuning values

 sign of KP indicates the action of the controller


(+KP  reverse acting; KP  direct acting)

 size of P indicates the maximum desirable loop sample time (be sure
sample time T  0.1P)

 ratio P /P indicates whether MPC (Smith predictor) would show benefit
(useful if P  P)

 model becomes part of the feed forward, Smith predictor, decoupling and
other model-based controllers

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Step Test
OpenOpen
LoopLoop
Step Step
Test Test
Process:Process:
CustomCustom
Process Process Controller: ManualManual
Controller: Mode Mode

60 60
StepTest
55 55
Process Varia ble
Process Varia ble

50 50

60 60

55 55
Contr olle r Outp ut
Contr olle r Outp ut

50 50

0 0 5 5 10 10 15 15 20 20
Time (miTinms)e (mins)

 The controller is set to manual mode


 Process starts at steady state
 Controller output signal is stepped to new value
Copyright © 2002  Measured process variable allowed to complete response
Douglas J. Cooper
All Rights Reserved
Process Gain From Step Test Data
 KP describes how much the measured process variable, y(t), changes
in response to changes in the controller output, u(t)
 A step test starts and ends at steady state, so KP can be computed
from plot axes

Steady State Change in the Measured Process Variable, y (t )


KP 
Steady State Change in the Controller Output, u (t )

where u(t) and y(t) represent the total change from initial to final
steady state
 A large process gain means the process will show a big response to
each control action

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
KP for Gravity Drained Tanks
Gravity Drained Tanks - Open Loop Step Test
Process: Gravity Drained Tank Controller: Manual Mode
3.0
2.8
2.6
2.4 y=(2.88- 1.93) m
Process Varia ble 2.2
2.0
1.8

60

55 u=(60- 50) %
Cont r olle r O utp ut

50

45
8 9 10 11 12 13 14 15 16 17 18
Time (mins)

y 2.88  1.93 m m
KP    0.095
u 60  50% %

Steady state process gain has a:


size (0.095), sign (+0.095), and units (m/%)
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
2. Hands-On Case Studies
Gravity Drained Tanks

manipulated variable
controller output
.

measured
process variable level sensor
& controller

disturbance
variable

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Non-Interacting Gravity Drained Tanks

TANK 1
dh1 h1 
  A   V1 ( t )
I.C.: t=0  h1 = h1s
dt R1
 
 
TANK 2
dh 2 h2  h1
  A   VP ( t ) 
I.C.: t=0  h2 = h2s
dt R2 R1

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Overall Time Constant From Step Test Data
OpenOpen
LoopLoop
Step Test
Step Test
Process:Process:
Custom Custom
Process Process Controller: ManualManual
Controller: Mode Mode

60 60
StepTest
55 55

Process Varia ble


Process Varia ble
50 50

60 60

55 55
Cont r olle r Out p ut
Contr olle r Outp ut

50 50

0 0 5 5 10 10 15 15 20 20
Time (miTinms)e (mins)

Time Constant P describes how fast the measured process


variable, y(t), responds to changes in the controller output, u(t)
P is how long it takes for the process variable to reach 63.2% of
its total change, starting from when the response first begins

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
P for Gravity Drained Tanks
1) Locate where the measured process variable first shows a clear initial response to the step change – call this time tYstart
From plot, tYstart = 9.6 min

Gravity Drained Tanks - Open Loop Step Test


Process: Gravity Drained Tank Controller: Manual Mode
3.0
2.8
2.6
2.4
Process Varia ble

2.2
2.0
1.8

60

55
Contr olle r O utp ut

50

45
8 9 10 11 12 13 14 15 16 17 18
Time (mins)

tYstart
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
P for Gravity Drained Tanks
2) Locate where the measured process variable reaches y63.2, or
where y(t) reaches 63.2% of its total final change

Label time t63.2 as the point in time where y63.2 occurs


Gravity Drained Tanks - Open Loop Step Test
Process: Gravity Drained Tank Controller: Manual Mode
3.0
2.8
y63.2
2.6
2.4
Process Varia ble

2.2
2.0
1.8

60

55
Cont r olle r Outp ut

50

45
8 9 10 11 12 13 14 15 16 17 18
Time (mins)

tYstart t63.2
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
P for Gravity Drained Tanks
Gravity Drained Tanks - Open Loop Step Test
Process: Gravity Drained Tank Controller: Manual Mode
3.0
2.8
y63.2 =2.53m
2.6
2.4 y =0.95m
Process Varia ble 2.2
2.0
1.8

60

55
Cont r olle r Outp ut

50

45
8 9 10 11 12 13 14 15 16 17 18
Time (mins)

tYstart t63.2

 y(t) starts at 1.93 m and shows a total change y = 0.95 m

 y63.2 = 1.93 m + 0.632(y)


= 1.93 m + 0.632(0.95 m) = 2.53 m

 y(t) passes through 2.53 m at t63.2 = 11.2 min


Copyright © 2002
Douglas J. Cooper
All Rights Reserved
P for Gravity Drained Tanks
- The time constant is the time difference between tYstart and t63.2
- Time constant must be positive and have units of time
From the plot: P = t63.2  tYstart = 11.2 min  9.6 min = 1.6 min

Gravity Drained Tanks - Open Loop Step Test


Process: Gravity Drained Tank Controller: Manual Mode
3.0
2.8
y63.2 =2.53m
2.6
2.4 y =0.95m
Process Varia ble

2.2
2.0
1.8

60

55
P =1.6minutes
Contr olle r Outp ut

50

45
8 9 10 11 12 13 14 15 16 17 18
Time (mins)

tYstart t63.2
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Apparent Dead Time From Step Test Data
 P is the time from when the controller output step is made until
when the measured process variable first responds
 Apparent dead time, P, is the sum of these effects:
– transportation lag, or the time it takes for material to travel
from one point to another
– sample or instrument lag, or the time it takes to collect analyze
or process a measured variable sample
– higher order processes naturally appear slow to respond

 Notes:
– Dead time must be positive and have units of time
– Tight control in increasingly difficult as P  0.7P
– For important loops, work to avoid unnecessary dead time

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
P for Gravity Drained Tanks
Gravity Drained Tanks - Open Loop Step Test
Process: Gravity Drained Tank Controller: Manual Mode
3.0
2.8
2.6
2.4
Process Varia ble 2.2
2.0
1.8

60

55
Contr olle r Outp ut

50
P =0.4minutes
45
8 9 10 11 12 13 14 15 16 17 18
tUstep Time (mins)

tYstart

P = tYstart  tUstep
= 9.6 min  9.2 min
= 0.4 min
Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Workshop 1:
Exploring Dynamics of Gravity Drained Tanks

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Processes Have Time-Varying Behaviors
 The predictions of a FOPDT model are constant over time
 But real processes change every day because
– surfaces foul or corrode
– mechanical elements like seals or bearings wear
– feedstock quality varies and catalyst activity drifts
– environmental conditions like heat and humidity change

 So the values of KP, P, P that best describe the dynamic


behavior of a process today may not be best tomorrow

 As a result, controller performance will degrade with time


and periodic retuning may be required

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Processes Have Nonlinear Behaviors
 The predictions of a FOPDT model are constant as operating level changes
 The response of a real process varies with operating level
Example Nonlinear Behavior
Process: Custom Process Controller: Manual Mode
80
responseshapeisdifferent
C
70 at different operatinglevels
60
Process Varia ble

B
50
A
70
65
60
Contr olle r Outp ut

55 eventhoughcontroller
50 output stepsarethesame
2 4 6 8 10 12 14 16 18 20
Time (time units)

Copyright © 2002
Douglas J. Cooper
All Rights Reserved
Gravity Drained Tanks is Nonlinear
Nonlinear Behavior of Gravity Drained Tanks
Model: First Order Plus Dead Time (FOPDT) File Name: TEST.DAT
7
6 nonlinearprocess
5
4 variableresponse
Measure d Level (m )

3
2 constant param eter
1 FO PD Tm odel
90
80
70
60
Cont r o l e r Out p ut ( % )

50
equal u’s
40

0 5 10 15 20 25 30 35 40 45
Time

Gain (K) = 0.075, Time Constant (T1) = 1.15, Dead Time (TD) = 0.53 SSE: 206.0

A controller should be designed for


a specific level of operation!