PresentationBIM Softwares

BIM softwares allow for 3D modeling of construction projects, improving coordination and collaboration. The key benefits of BIM include reduced costs and risks through better planning, visualization of the design before construction begins, improved scheduling and clash detection to reduce rework. BIM also enables improved safety planning, prefabrication to increase productivity, and facility management after project completion. BIM represents an evolution from hand drafting to computer-aided design and 3D modeling tools.

Uploaded by

Mo Black
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views26 pages

PresentationBIM Softwares

BIM softwares allow for 3D modeling of construction projects, improving coordination and collaboration. The key benefits of BIM include reduced costs and risks through better planning, visualization of the design before construction begins, improved scheduling and clash detection to reduce rework. BIM also enables improved safety planning, prefabrication to increase productivity, and facility management after project completion. BIM represents an evolution from hand drafting to computer-aided design and 3D modeling tools.

Uploaded by

Mo Black
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 26

BIM Softwares

Prepared by: Prepared by : Ehsan Hassan


Building Information Modelling
Ehsan Hassan Civil Engineer BIM
Table Of Contents

Problems in What is What are the Construction


BIM ? benefits of Modeling , Time ,
Construction Industry with BIM Cost , Sustainability
Industry BIM ?
and management

BIM Coordinator
Tools
1-problems in construction

• Poorly coordinated Design Documents

• Change Orders & Rework

• Delays & Cost Over Turn

• Claims & Litigation

• Greater Risk
Coordination

• Current tools and work flow


doesn’t support coordinated
Work which increases cost and
Time of the project as well as
Decreases its quality .

• Changes to the building design


Result in coordination errors.
Change order

• Inability to visualize the final product


At the design phase leads to changes
In design in the construction phase causing
Delays and extra cost .
Delays & Cost Over turn

• Manual quantity estimation is a time


Taking process with low accuracy.

• Majority of the projects are over


Budgeted

• Design change effect on the budget


Is not easily reflected.
Claims & Litigation

• Coordination and collaboration issues


Between different stake holders causing
Dissatisfaction of everyone .
Greater Risk

• Unsafe practices and absence of


Safety procedures and planning
At site causes injuries and loss of lives .
Building Information
Modeling

Building Information Modeling (BIM) is an


intelligent 3D model-based process that gives
architecture, engineering, and construction (AEC)
professionals the insight and tools to more efficiently
plan, design, construct, and manage buildings and
infrastructure.

According to Autodesk website


Drafting Evolution • Hand Drawing

• Computer Aided Design (CAD)

• BIM Softwares
Influence Of BIM On Construction
Industry

BIM Benefits

1. Better Collaboration
and Communication 

BIM improves communication among architects, clients, contractors,


And other relevant parties involved in the project. That’s because BIM
Relies on a “single source of truth” system; this means that all of the
Relevant information including models, estimates, and design notes
Are shared and stored from one place.
2. Model-Based Cost
Estimation 

firms are realizing that including estimators earlier in the planning


stage allows for more effective construction cost estimation, which has
led to the growth of model-based cost estimating (also known as 5D
BIM).
3. Preconstruction
Project Visualization

By using BIM, you can plan and visualize the entire project
during preconstruction, before the shovel hits the ground.
Space-use simulations and 3D visualizations allow clients to
experience what the space will look like offering the ability
to make changes before construction start.
4. Reduced Cost and
Mitigated Risk

Closer collaboration with contractors can lead to reductions in tender risk


premiums, lower insurance costs, fewer overall variations, and fewer
opportunities for claims.

Better overview of the project before starting allows for more prefabrication
and reduces waste on unused materials. Prefabricated elements can be easily
bolted in place rather than created on-site. Labor costs spent on
documentation work and miscommunications are reduced.
5. Improved
Scheduling/Sequencing

In the same way that many of these benefits save money,


They save time by reducing the time of project cycles and
Eliminating construction schedule setbacks. BIM allows design
and Documentation to be done at the same time, and for
documentation
To be easily changed to adapt to new information such as site
conditions.
6. Increased Productivity and
Prefabrication

BIM data can be used to instantly generate production


drawings or databases for manufacturing purposes, allowing
for increased use of prefabrication and modular construction
technology. By designing, detailing and building offsite in a
controlled environment, you can diminish waste, increase
efficiency, and reduce labor and material costs.
7. Safer Construction Sites

BIM can help improve construction safety by pinpointing hazards


before they become problems, and avoid physical risks by visualizing
and planning site logistics ahead of time. Visual risk analysis and
safety evaluations can help ensure safety over the course of the
project execution.
8. Improved Coordination and
Clash Detection

BIM allows you to better coordinate trades and


subcontractors, detecting any MEP, internal, or
external clashes before construction begins. Will the
electrical conduits clash with a steel beam? Do the
doorways have enough clearance?
By avoiding clashes, you reduce the amount of rework
needed on any given job. With BIM, you have the
opportunity to plan it right before you build onsite. You
can avoid last-minute changes and unforeseen issues by
enabling easy reviewing and commenting across
multiple disciplines.
9. Better Builds

The increased reliability of a coordinated model


leads directly to greater building quality.
By sharing common BIM tools, more experienced
team members work together with builders
through all phases of the project, providing better
control over technical decisions around design
execution.
The optimal ways to construct a project can be
tested and chosen early in the project, and
structural deficiencies can be identified before
building.
10. Stronger Facility
Management and Building
Handover
The information in a model also empowers operation of the
building after construction is over, providing an ROI well after
project completion.
Using construction software, an accurate, ongoing digital
record of building information is valuable for facilities
management and renovators for the entire lifecycle of the
building.
Data can be sent into existing building maintenance software for
post-occupancy use. Using a tool such as Autodesk’s BIM 360
Ops, contractors can transform building handover by
connecting BIM data generated during design and construction
to building operations.
BIM Maturity Levels
• 3D Drawings , safety models and logistics models.
3D

• Scheduling ,time phasing ,planning and detailed


4D simulation.

• Estimating real time cost and quantity extraction.


5D

• Sustainability and the life cycle of the project.


6D

• Operations and Facilities Management.


7D
End of presentation
Any question?

Contact info
Ehsan Hassan
Business development Engineer
Building Technology Labs
Building No. 7 Elbostan, Street, Cairo Governorate 11799
Tel:
Cell:
Email:
Website:

You might also like