Site Analysis

site analysis of the given site for the 2019 competition for the cricket stadium conducted by insdag

Uploaded by

Namitha Praveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views15 pages

Site Analysis

site analysis of the given site for the 2019 competition for the cricket stadium conducted by insdag

Uploaded by

Namitha Praveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 15

INSDAG – CRICKET

STADIUM

ANALYSIS
SITE
GHAZIABAD , UTTAR PRADESH

LOCATION POPULATION (2011) POPULATION DENSITY LITERACY RATE


46,61,452 3,967 Inhabitants 85 %
per sq km.
CLIMATIC CONDITIONS

TEMPRATURE RAINFALL

SUMMER – The temperature varies from 25 – 39 Wettest months (with the highest rainfall)
it is almost high throughout the year. are July and August (236.2mm). 
April – October. Driest months (with the lowest rainfall)
WINTER – The temperature varies from 7 – 19 are November and December (10.2mm).
it is lowest from the month of
October – march.
SUN PATH AND WIND DIRECTION
ACCESSIBILI
TY

NEAR BY HOSPITALS NEAR BY INSTITUTIONS DELHI RAILWAY STATION INTERNATIONAL AIRPORT METRO
30 KM 40 KM 5.9 KM

SKYLINE
GHAZIABAD BUILDING BYLAWS
• ABOVE 1000 OR 5000KM GROUND COVERAGE IS MAX 50%
• COMPULSORY RAIN WATER HARVESTING FOR ALL COMMERCIAL BUILDINGS
• SOLAR PANEL INSTALLATIONS – 30% OF POWER CONSUMPTION
• PERGOLAS AND CANTILEVERS NOT MORE THAN 20 SQM (RCC)
• HEIGHT RESTRICTIONS – RESIDENTIAL – 12 M MAX
COMMERCIAL BUILDINGS – 24 M
• AMENITY PLOT LAW – LAND CANNOT BE USED FOR AN0Y OTHER PURPOSES OTHER THAN THE
ASSIGNED TASK
• GATP (GHAZIABAD ARCHITECT AND TOWN PLANNERS)
• ANCILLARY BUILDING LAW – THAT MEANS A BUILDING SUB SURVIENT TO THE PRINCIPLE BUILDING
CAN BE BUILT ON THE SAME PLOT
EX – GUARD ROOMS IN APARTMENT
• ALTERATION LAW – NO CHANGES CAN BE MADE AFTER THE FINAL PLAN IS APPROVED IN TERMS OF
HEIGHT OR LAND GRABBINGS FROM SIDES
• MAXIMUM FAR IS 1.50
STREET PATTERN AND ROAD NETWORK
Main roads connecting the site which is being constructed newly.
Internal roads connecting the site from the settlement areas .
Hindon river that flows adjacent to the site .
SEWER LINE – CONNECTING TO THE
SITE

• The sewer line is being constructed newly connecting to the raj nagar extension
• It runs right next to the boundary of the site
MAP DEMARKATING THE LANDUSE AROUND THE SITE AREA

AGRICULTURE LAND

RESIDENTIAL AREA

INDUSTRIAL AREA
HINDON RIVER - NETWORK
• RIVER IS TO THE WEST OF THE SITE
• THERE IS NO BUILT SPACE NEAR TO THE RIVER DUE TO THE
CHARACTERISTICS OF THE SOIL PRESNT
• THE WATER USED FO THE IRRIGATION TO THE LAND IS FROM
HINDON RIVER .
MAP DEMARKATING THE LANDSCAPE AROUND THE SITE A

pictures taken on site showing


the agricultural land around the
site and the green pocket inside
the site boundary
SECTION LINE AT A

B A
SECTION LINE AT B

• FLAT LAND , NO ROCKS OR


ANY OBSTACLES IN
BETWEEN
• NOT MUCH CONTOURS
PRESENT ON THE SITE
• NO WATER BODY PERSENT
IN THE SITE

TOPOGRAPHY
• FERTILE SOIL DUE TO THE
AGRICULTURAL LAND
• NOT MUCH TREES PRESENT ON THE
SITE
CENTRE EDGE
MAP

THOSE CAN BE USED AS THE ENTRY POINTS BECAUSE THESE HAS THE GREEN DIVISION IN BETWEEN AND IT IS OPEN TO
THE MAIN ROAD
OPEN SPACE
NETWORK

THIS IMAGES SPEAKS ABOUT BUILT AND


UNBUILT AREAS .. THE RED DOT DEMARKATES
THE BUILT PERCENT IN THE SITE
AND THE SURROUNDING IS OPEN AND UNBILT
THANK YOU