Optimal Resource Management of Building Projects: University of Engineering and Technology Peshawar (Jalozai)

Three students - Syed Mohsin Ali, Khizer Sawar, and Saddam Hussain - presented their project on optimal resource management of building projects to their supervisor Engr. Waqar Ahmad at the University of Engineering and Technology Peshawar. They introduced their project, which involved selecting a plan for residential buildings, listing activities in MS Project, studying S-curve cost analysis and resource leveling, and their next steps of identifying critical activities, achieving the S-curve, and applying resource leveling techniques to activities.

Uploaded by

Mohsin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views8 pages

Optimal Resource Management of Building Projects: University of Engineering and Technology Peshawar (Jalozai)

Three students - Syed Mohsin Ali, Khizer Sawar, and Saddam Hussain - presented their project on optimal resource management of building projects to their supervisor Engr. Waqar Ahmad at the University of Engineering and Technology Peshawar. They introduced their project, which involved selecting a plan for residential buildings, listing activities in MS Project, studying S-curve cost analysis and resource leveling, and their next steps of identifying critical activities, achieving the S-curve, and applying resource leveling techniques to activities.

Uploaded by

Mohsin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 8

University of Engineering and Technology Peshawar (Jalozai)

Optimal Resource Management of Building Projects

Presented By:
SYED MOHSIN ALI Reg No.16JZCIV0121
KHIZER SAWAR Reg No.16JZCIV0125
SADDAM HUSSAIN Reg No.16JZCIV0137

SUPERVISOR:
Engr. Waqar Ahmad

Department of Civil Engineering


University of Engineering and Technology Peshawar (Jalozai)

Introduction:
What we have done up to now.?
 Select a plan for residential plates.
 Enlist different activities in Ms.Project.
 Study S Curve Cost analysis.
 Study Resource levelling.

What will we do next.?


 To identify critical activities for cost analysis.
 Achievement of S curve.
 To apply Resource levelling Techniques to Activities.

Department of Civil Engineering


University of Engineering and Technology Peshawar (Jalozai)

Basement Layout of Residential plates:

Department of Civil Engineering


University of Engineering and Technology Peshawar (Jalozai)

Basement Layout of Residential plates:


:

Department of Civil Engineering


University of Engineering and Technology Peshawar (Jalozai)

Ground floor Layout of Residential Building:

Department of Civil Engineering


University of Engineering and Technology Peshawar (Jalozai)
Activities list in Ms Project:

Department of Civil Engineering


University of Engineering and Technology Peshawar (Jalozai)
Work Breakdown structure: