Completion Engineering
Completion Engineering
Completion Engineering
Completed well
Well Completion
Common Tools
Production packer:
No-go nipple:
It is just above the entry guide.
Its ID less than the ID of the tubing.
Well Completion
Common Tools
Blast joint:
It can be installed in the tubing opposite open and flow
perforations. and it has a large thickness.
To help prevent tubing damage from the jetting action of the zone
perforations.
Well Completion
Common Tools
Landing nipples:
To provide a specific landing location for subsurface flow control
equipments, or to set the gauges.
Dual String
DRILLING ENGINEERING
1- Objective.
2- Types of drilling rigs.
3- Rig components.
4- Drill string design.
5- Rotary drilling bits.
6- Mud Engineering.
7- Casing & Cementing design.
9- Blowout preventer (BOP).
10- Hole problems.
DRILLING A WELL
1-Objective …
To provide a conduit (a hole) from the Sub-surface
OPERATE, ORGANIZE
AND MANAGE ALL THE
ABOVE
(A DRILLING RIG)
17
Rig Components
Rig Components
Hoisting system
Rig Components
Rig Components
Kelly and Rotary table
Rig Components
Derrick
4-Drill String Design
Drill String :
A combination of Bit, Drill Collars, Drill Pipe & drilling jar & stabilizers & shock
absorber & the kelly.
Stabilizers are
installed within the
column of drill
collars. To make the
bit in the straight
direction. and to
minimize the
bending of the
string.
Drill String Design
Reamer
Reamer is used to enlargement the hole.
Drill String Design
Drill pipes
5- Rotary Drilling Bits
26
Rotary Drilling Bits
Definitions
Functions
Operations
Casing
Definition:
1- Collapse
2-Burest
3-Tension
Casing
Casing
Casing sizes
1- Conductor casing
2- Surface casing
3- Intermediate casing
4- Production casing
5- Liner casing
Casing
Inspection of Cuttings & Open Hole Logging before Casing
36
Casing
Run in hole with Casing pipes
Cementing
Cement is used to :
42
Blow out preventer
Rams of BOP:
1- Pipe ram
2- Blind ram
3- Shear ram
4- Variable-bore rams
10-Hole Problems
Pipe sticking
Lost circulation
Kicks