Chapter 5: CPU Scheduling: Silberschatz, Galvin and Gagne ©2009 Operating System Concepts - 8 Edition

The document discusses different CPU scheduling algorithms including first-come first-served, shortest job first, priority scheduling, round robin, and multilevel queue scheduling. It provides examples and comparisons of each algorithm.

Uploaded by

Manohar Datt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views26 pages

Chapter 5: CPU Scheduling: Silberschatz, Galvin and Gagne ©2009 Operating System Concepts - 8 Edition

The document discusses different CPU scheduling algorithms including first-come first-served, shortest job first, priority scheduling, round robin, and multilevel queue scheduling. It provides examples and comparisons of each algorithm.

Uploaded by

Manohar Datt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 26

Chapter 5: CPU Scheduling

Operating System Concepts – 8th Edition Silberschatz, Galvin and Gagne ©2009
Chapter 5: CPU Scheduling
 Basic Concepts

 Scheduling Criteria

 Scheduling Algorithms
Basic Concepts
 Maximum CPU utilization obtained with multiprogramming

 CPU–I/O Burst Cycle – Process execution consists of a cycle of CPU execution and I/O wait

 CPU burst distribution


Alternating Sequence of CPU and
I/O Bursts
Histogram of CPU-burst Times
CPU Scheduler
 Selects from among the processes in ready queue, and allocates the CPU to one of them
 Queue may be ordered in various ways
 CPU scheduling decisions may take place when a process:
1. Switches from running to waiting state
2. Switches from running to ready state
3. Switches from waiting to ready
4. Terminates
 Scheduling under 1 and 4 is non preemptive
 All other scheduling is preemptive
 Consider access to shared data
 Consider preemption while in kernel mode
 Consider interrupts occurring during crucial OS activities
Dispatcher
 Dispatcher module gives control of the CPU to the process selected by the short-term scheduler; this
involves:
 switching context
 switching to user mode
 jumping to the proper location in the user program to restart that program

 Dispatch latency – time it takes for the dispatcher to stop one process and start another running
Scheduling Criteria
 CPU utilization – keep the CPU as busy as possible

 Throughput – no of processes that complete their execution per time unit

 Turnaround time – amount of time to execute a particular process

 Waiting time – amount of time a process has been waiting in the ready queue

 Response time – amount of time it takes from when a request was submitted until the first response is
produced, not output (for time-sharing environment)
Scheduling Algorithm Optimization Criteria

 Max CPU utilization


 Max throughput
 Min turnaround time
 Min waiting time
 Min response time
First-Come, First-Served (FCFS) Scheduling

Process Burst Time


P1 24
P2 3
P3 3
 Suppose that the processes arrive in the order: P1 , P2 , P3
The Gantt Chart for the schedule is:

P1 P2 P3

0 24 27 30

 Waiting time for P1 = 0; P2 = 24; P3 = 27


 Average waiting time: (0 + 24 + 27)/3 = 17
FCFS Scheduling (Cont.)
Suppose that the processes arrive in the order:
P2 , P3 , P1
 The Gantt chart for the schedule is:

P2 P3 P1

0 3 6 30

 Waiting time for P1 = 6; P2 = 0; P3 = 3


 Average waiting time: (6 + 0 + 3)/3 = 3
 Much better than previous case
 Convoy effect - short process behind long process
 Consider one CPU-bound and many I/O-bound processes
Shortest-Job-First (SJF) Scheduling
 Associate with each process the length of its next CPU burst
 Use these lengths to schedule the process with the shortest time

 SJF is optimal – gives minimum average waiting time for a given set of processes
 The difficulty is knowing the length of the next CPU request
 Could ask the user
Example of SJF
ProcessArriva l Time Burst Time
P1 0.0 6
P2 2.0 8
P3 4.0 7
P4 5.0 3
 SJF scheduling chart

P4 P1 P3 P2

0 3 9 16 24

 Average waiting time = (3 + 16 + 9 + 0) / 4 = 7


Determining Length of Next CPU Burst
 Can only estimate the length – should be similar to the previous one
 Then pick process with shortest predicted next CPU burst

 Can be done by using the length of previous CPU bursts, using exponential averaging

1. t n  actual length of n th CPU burst


2.  n 1  predicted value for the next CPU burst
3.  , 0    1
4. Define :
 Commonly, α set to ½
 Preemptive version called shortest-remaining-time-first

 n 1   t n   1    n .
Example of Shortest-remaining-time-first
 Now we add the concepts of varying arrival times and preemption to the analysis

ProcessA arri Arrival TimeT Burst Time


P1 0 8
P2 1 4
P3 2 9
P4 3 5
 Preemptive SJF Gantt Chart

P1 P2 P4 P1 P3

0 1 5 10 17 26
 Average waiting time = [(10-1)+(1-1)+(17-2)+5-3)]/4 = 26/4 = 6.5 msec
Priority Scheduling
 A priority number (integer) is associated with each process

 The CPU is allocated to the process with the highest priority (smallest integer  highest priority)
 Preemptive
 Nonpreemptive

 SJF is priority scheduling where priority is the inverse of predicted next CPU burst time

 Problem  Starvation – low priority processes may never execute

 Solution  Aging – as time progresses increase the priority of the process


Example of Priority Scheduling
ProcessA arri Burst TimeT Priority
P1 10 3
P2 1 1
P3 2 4
P4 1 5
P5 5 2
 Priority scheduling Gantt Chart

P2 P5 P1 P3 P4

0 1 6 16 18 19

 Average waiting time = 8.2 msec


Round Robin (RR)
 Each process gets a small unit of CPU time (time quantum q), usually 10-100 milliseconds. After this time
has elapsed, the process is preempted and added to the end of the ready queue.
 If there are n processes in the ready queue and the time quantum is q, then each process gets 1/n of the
CPU time in chunks of at most q time units at once. No process waits more than (n-1)q time units.
 Timer interrupts every quantum to schedule next process
 Performance
 q large  FIFO
 q small  q must be large with respect to context switch, otherwise overhead is too high
Example of RR with Time Quantum = 4

Process Burst Time


P1 24
P2 3
P3 3

 The Gantt chart is:

P1 P2 P3 P1 P1 P1 P1 P1

0 4 7 10 14 18 22 26 30
 Typically, higher average turnaround than SJF, but better response
 q should be large compared to context switch time
 q usually 10ms to 100ms, context switch < 10 usec
Time Quantum and Context Switch Time
Turnaround Time Varies With
The Time Quantum

80% of CPU bursts should


be shorter than q
Multilevel Queue
 Ready queue is partitioned into separate queues, eg:
 foreground (interactive)
 background (batch)
 Process permanently in a given queue

 Each queue has its own scheduling algorithm:


 foreground – RR
 background – FCFS

 Scheduling must be done between the queues:


 Fixed priority scheduling; (i.e., serve all from foreground then from background). Possibility of
starvation.
 Time slice – each queue gets a certain amount of CPU time which it can schedule amongst its
processes; i.e., 80% to foreground in RR
 20% to background in FCFS
Multilevel Queue Scheduling
Multilevel Feedback Queue

 A process can move between the various queues; aging can be implemented this way

 Multilevel-feedback-queue scheduler defined by the following parameters:


 number of queues
 scheduling algorithms for each queue
 method used to determine when to upgrade a process
 method used to determine when to demote a process
 method used to determine which queue a process will enter when that process needs service
Multilevel Feedback Queues
Example of Multilevel Feedback Queue
 Three queues:
 Q0 – RR with time quantum 8 milliseconds
 Q1 – RR time quantum 16 milliseconds
 Q2 – FCFS

 Scheduling
 A new job enters queue Q0 which is served FCFS
 When it gains CPU, job receives 8 milliseconds
 If it does not finish in 8 milliseconds, job is moved to queue Q1
 At Q1 job is again served FCFS and receives 16 additional milliseconds
 If it still does not complete, it is preempted and moved to queue Q2