0% found this document useful (0 votes)
60 views44 pages

Process Concept: Jobs User Programs Tasks Process

The document discusses processes and process management in operating systems. It defines a process as a program in execution. A process has multiple parts including program code, current activity, stack, data section, and heap. It describes the different states a process can be in such as running, ready, waiting, and terminated. It also discusses process scheduling, context switching, interprocess communication, and multithreading.

Uploaded by

Sarah Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views44 pages

Process Concept: Jobs User Programs Tasks Process

The document discusses processes and process management in operating systems. It defines a process as a program in execution. A process has multiple parts including program code, current activity, stack, data section, and heap. It describes the different states a process can be in such as running, ready, waiting, and terminated. It also discusses process scheduling, context switching, interprocess communication, and multithreading.

Uploaded by

Sarah Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 44

Process Concept 3

 An operating system executes a variety of programs:


 Batch system – jobs
 Time-shared systems – user programs or tasks
 Textbook uses the terms job and process almost interchangeably
 Process – a program in execution; process execution must
progress in sequential fashion
 Multiple parts
 The program code, also called text section
 Current activity including program counter, processor registers
 Stack containing temporary data
 Function parameters, return addresses, local variables
 Data section containing global variables
 Heap containing memory dynamically allocated during run time
Process Concept (Cont.)
 Program is passive entity stored on disk (executable file),
process is active
 Program becomes process when executable file loaded into
memory
 Execution of program started via GUI mouse clicks, command
line entry of its name, etc
 One program can be several processes
 Consider multiple users executing the same program
Process in Memory
Process State

 As a process executes, it changes state


 new: The process is being created
 running: Instructions are being executed
 waiting: The process is waiting for some event to occur
 ready: The process is waiting to be assigned to a processor
 terminated: The process has finished execution
Diagram of Process State
Process Control Block (PCB)
Information associated with each process
(also called task control block)
 Process state – running, waiting, etc
 Program counter – location of instruction
to next execute
 CPU registers – contents of all process-
centric registers
 CPU scheduling information- priorities,
scheduling queue pointers
 Memory-management information –
memory allocated to the process
 Accounting information – CPU used, clock
time elapsed since start, time limits
 I/O status information – I/O devices
allocated to process, list of open files
Process Scheduling

 Maximize CPU use, quickly switch processes onto CPU for time
sharing
 Process scheduler selects among available processes for
next execution on CPU
 Maintains scheduling queues of processes
 Job queue – set of all processes in the system
 Ready queue – set of all processes residing in main
memory, ready and waiting to execute
 Device queues – set of processes waiting for an I/O device
 Processes migrate among the various queues
Representation of Process Scheduling

 Queueing diagram represents queues, resources, flows


Schedulers
 Short-term scheduler (or CPU scheduler) – selects which process should
be executed next and allocates CPU
 Sometimes the only scheduler in a system
 Short-term scheduler is invoked frequently (milliseconds)  (must be
fast)
 Long-term scheduler (or job scheduler) – selects which processes should
be brought into the ready queue
 Long-term scheduler is invoked infrequently (seconds, minutes)  (may
be slow)
 The long-term scheduler controls the degree of multiprogramming
 Processes can be described as either:
 I/O-bound process – spends more time doing I/O than computations,
many short CPU bursts
 CPU-bound process – spends more time doing computations; few very
long CPU bursts
 Long-term scheduler strives for good process mix
Addition of Medium Term Scheduling
 Medium-term scheduler can be added if degree of multiple
programming needs to decrease
 Remove process from memory, store on disk, bring back in
from disk to continue execution: swapping
Context Switch
 When CPU switches to another process, the system must save
the state of the old process and load the saved state for the
new process via a context switch
 Context of a process represented in the PCB
 Context-switch time is overhead; the system does no useful
work while switching
 The more complex the OS and the PCB  the longer the
context switch
 Time dependent on hardware support
 Some hardware provides multiple sets of registers per CPU
 multiple contexts loaded at once
Interprocess Communication
 Processes within a system may be independent or cooperating
 Cooperating process can affect or be affected by other processes,
including sharing data
 Reasons for cooperating processes:
 Information sharing
 Computation speedup
 Modularity
 Convenience
 Cooperating processes need interprocess communication (IPC)
 Two models of IPC
 Shared memory
 Message passing
Communications Models
(a) Message passing. (b) shared memory.
Cooperating Processes
 Independent process cannot affect or be affected by the execution
of another process
 Cooperating process can affect or be affected by the execution of
another process
 Advantages of process cooperation
 Information sharing
 Computation speed-up
 Modularity
 Convenience
Buffering

 Queue of messages attached to the link.


 implemented in one of three ways
1. Zero capacity – no messages are queued on a link.
Sender must wait for receiver (rendezvous)
2. Bounded capacity – finite length of n messages
Sender must wait if link full
3. Unbounded capacity – infinite length
Sender never waits
Threads Benefits

 Responsiveness – may allow continued execution if part of


process is blocked, especially important for user interfaces
 Resource Sharing – threads share resources of process, easier
than shared memory or message passing
 Economy – cheaper than process creation, thread switching
lower overhead than context switching
 Scalability – process can take advantage of multiprocessor
architectures
Multicore Programming

 Multicore or multiprocessor systems putting pressure on


programmers, challenges include:
 Dividing activities
 Balance
 Data splitting
 Data dependency
 Testing and debugging
 Parallelism implies a system can perform more than one task
simultaneously
 Concurrency supports more than one task making progress
 Single processor / core, scheduler providing concurrency
Multicore Programming (Cont.)

 Types of parallelism
 Data parallelism – distributes subsets of the same data
across multiple cores, same operation on each
 Task parallelism – distributing threads across cores, each
thread performing unique operation
 As # of threads grows, so does architectural support for threading
 CPUs have cores as well as hardware threads
 Consider Oracle SPARC T4 with 8 cores, and 8 hardware
threads per core
Concurrency vs. Parallelism
 Concurrent execution on single-core system:

 Parallelism on a multi-core system:


Single and Multithreaded Processes
User Threads and Kernel Threads

 User threads - management done by user-level threads library


 Three primary thread libraries:
 POSIX Pthreads
 Windows threads
 Java threads
 Kernel threads - Supported by the Kernel
Multithreading Models

 Many-to-One

 One-to-One

 Many-to-Many
Many-to-One

 Many user-level threads mapped to


single kernel thread
 One thread blocking causes all to block
 Multiple threads may not run in parallel
on muticore system because only one
may be in kernel at a time
 Few systems currently use this model
 Examples:
 Solaris Green Threads
 GNU Portable Threads
One-to-One
 Each user-level thread maps to kernel thread
 Creating a user-level thread creates a kernel thread
 More concurrency than many-to-one
 Number of threads per process sometimes
restricted due to overhead
 Examples
 Windows
 Linux
 Solaris 9 and later
Many-to-Many Model
 Allows many user level threads to be
mapped to many kernel threads
 Allows the operating system to create
a sufficient number of kernel threads
 Solaris prior to version 9
 Windows with the ThreadFiber
package
Two-level Model
 Similar to M:M, except that it allows a user thread to be
bound to kernel thread
 Examples
 IRIX
 HP-UX
 Tru64 UNIX
 Solaris 8 and earlier
Basic Concepts

 Maximum CPU utilization


obtained with multiprogramming
 CPU–I/O Burst Cycle – Process
execution consists of a cycle of
CPU execution and I/O wait
 CPU burst followed by I/O burst
 CPU burst distribution is of main
concern
CPU Scheduler
 Short-term scheduler selects from among the processes in
ready queue, and allocates the CPU to one of them
 Queue may be ordered in various ways
 CPU scheduling decisions may take place when a process:
1. Switches from running to waiting state
2. Switches from running to ready state
3. Switches from waiting to ready
4. Terminates
 Scheduling under 1 and 4 is nonpreemptive
 All other scheduling is preemptive
 Consider access to shared data
 Consider preemption while in kernel mode
 Consider interrupts occurring during crucial OS activities
Scheduling Criteria

 CPU utilization – keep the CPU as busy as possible


 Throughput – # of processes that complete their execution per
time unit
 Turnaround time – amount of time to execute a particular
process
 Waiting time – amount of time a process has been waiting in the
ready queue
 Response time – amount of time it takes from when a request
was submitted until the first response is produced, not output (for
time-sharing environment)
Scheduling Algorithm Optimization Criteria

 Max CPU utilization


 Max throughput
 Min turnaround time
 Min waiting time
 Min response time
First- Come, First-Served (FCFS) Scheduling

Process Burst Time


P1 24
P2 3
P3 3
 Suppose that the processes arrive in the order: P1 , P2 , P3
The Gantt Chart for the schedule is:

P 1
P 2
P3
0 24 27 30

 Waiting time for P1 = 0; P2 = 24; P3 = 27


 Average waiting time: (0 + 24 + 27)/3 = 17
FCFS Scheduling (Cont.)
Suppose that the processes arrive in the order:
P 2 , P 3 , P1
 The Gantt chart for the schedule is:

P 2
P 3
P 1

0 3 6 30

 Waiting time for P1 = 6; P2 = 0; P3 = 3


 Average waiting time: (6 + 0 + 3)/3 = 3
 Much better than previous case
 Convoy effect - short process behind long process
 Consider one CPU-bound and many I/O-bound processes
Shortest-Job-First (SJF) Scheduling

 Associate with each process the length of its next CPU burst
 Use these lengths to schedule the process with the shortest
time
 SJF is optimal – gives minimum average waiting time for a given
set of processes
 The difficulty is knowing the length of the next CPU request
 Could ask the user
Example of SJF

ProcessArrival Time Burst Time


P1 0.0 6
P2 2.0 8
P3 4.0 7
P4 5.0 3

 SJF scheduling chart

P 4
P 1
P3 P2
0 3 9 16 24

 Average waiting time = (3 + 16 + 9 + 0) / 4 = 7


Example of Shortest-remaining-time-first

 Now we add the concepts of varying arrival times and preemption to


the analysis
ProcessA arri Arrival TimeT Burst Time
P1 0 8
P2 1 4
P3 2 9
P4 3 5
 Preemptive SJF Gantt Chart

P 1
P 2
P4 P1 P3
0 1 5 10 17 26

 Average waiting time = [(10-1)+(1-1)+(17-2)+5-3)]/4 = 26/4 = 6.5 msec


Priority Scheduling

 A priority number (integer) is associated with each process

 The CPU is allocated to the process with the highest priority


(smallest integer  highest priority)
 Preemptive
 Nonpreemptive

 SJF is priority scheduling where priority is the inverse of predicted


next CPU burst time

 Problem  Starvation – low priority processes may never execute

 Solution  Aging – as time progresses increase the priority of the


process
Example of Priority Scheduling

ProcessA arri Burst TimeT Priority


P1 10 3
P2 1 1
P3 2 4
P4 1 5
P5 5 2

 Priority scheduling Gantt Chart

P 1
P 2
P1 P3 P4
0 1 6 16 18 19

 Average waiting time = 8.2 msec


Round Robin (RR)

 Each process gets a small unit of CPU time (time quantum q),
usually 10-100 milliseconds. After this time has elapsed, the
process is preempted and added to the end of the ready queue.
 If there are n processes in the ready queue and the time quantum
is q, then each process gets 1/n of the CPU time in chunks of at
most q time units at once. No process waits more than (n-1)q
time units.
 Timer interrupts every quantum to schedule next process
 Performance
 q large  FIFO
 q small  q must be large with respect to context switch,
otherwise overhead is too high
Example of RR with Time Quantum = 4
Process Burst Time
P1 24
P2 3
P3 3
 The Gantt chart is:

P 1
P 2
P 3
P 1
P 1
P 1
P 1
P1
0 4 7 10 14 18 22 26 30

 Typically, higher average turnaround than SJF, but better response


 q should be large compared to context switch time
 q usually 10ms to 100ms, context switch < 10 usec
Multilevel Queue Scheduling
Multilevel Feedback Queue

 A process can move between the various queues; aging can be


implemented this way
 Multilevel-feedback-queue scheduler defined by the following
parameters:
 number of queues
 scheduling algorithms for each queue
 method used to determine when to upgrade a process
 method used to determine when to demote a process
 method used to determine which queue a process will enter
when that process needs service
Example of Multilevel Feedback Queue

 Three queues:
 Q0 – RR with time quantum 8 milliseconds
 Q1 – RR time quantum 16 milliseconds
 Q2 – FCFS

 Scheduling
 A new job enters queue Q0 which is
served FCFS
 When it gains CPU, job receives 8
milliseconds
 If it does not finish in 8 milliseconds,
job is moved to queue Q1
 At Q1 job is again served FCFS and
receives 16 additional milliseconds
 If it still does not complete, it is
preempted and moved to queue Q2
Real-Time CPU Scheduling
 Can present obvious challenges
 Soft real-time systems – no
guarantee as to when critical real-
time process will be scheduled
 Hard real-time systems – task
must be serviced by its deadline
 Two types of latencies affect
performance
1. Interrupt latency – time from arrival of
interrupt to start of routine that
services interrupt
2. Dispatch latency – time for schedule
to take current process off CPU and
switch to another
Real-Time CPU Scheduling (Cont.)

 Conflict phase of
dispatch latency:
1. Preemption of
any process
running in kernel
mode
2. Release by low-
priority process
of resources
needed by high-
priority
processes

You might also like